# 332.5 Eighth Street, Jersey City

Single family · built c. 1845 · Block 10008, Lot 34.

On Umarelli: https://umarelli.org/jersey-city/10008/34/332-5-eighth-street

More construction in Hamilton Park: https://umarelli.org/jersey-city/downtown/hamilton-park.md

Every lot on block 10008: https://umarelli.org/jersey-city/10008.md

## Building permits

- Alteration, issued Sep 25, 2023, estimated cost $19K, described as “Plan Review - Historic Roof Work - Roof Removal and Replacement”
- Alteration, issued Apr 22, 1999, described as “Bldg.,plbg.,elelct., alteration”
- Alteration, issued Sep 22, 1998, described as “Construct deck”

## Property taxes

- Assessment: $911,200
- 2025 tax: $21,277
- Assessed land: $444,600
- Assessed improvements: $466,600
- Last sale: $1,065,000 in 2021

## Zoning

H (Historic District).

## Recent sales

- Jun 14, 2021: $1,065,000, 1,619 sq ft, sold with other lots

Open-market sales since mid-2019, from the state’s SR1A sales file.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard. FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NAVD88).

## Landmarks

Part of Hamilton Park Historic District (Jersey City historic district).

## Board and land use applications

- Historic Preservation Commission case H-25-0410: Application, Fees Paid, applied Oct 1, 2025. Replace existing front door and transome
- Historic Preservation Commission case H-25-0390: Application, Approved, applied Sep 15, 2025. - Replace 3 ton condenser & coil with 80,000BTU 95% furnace - Replace Navien tankless hot water heater
- Historic Preservation Commission case H-24-0453: Application, Approved, applied Nov 23, 2024. Remove all existing windows at front and replace with new
- Historic Preservation Commission case H-23-0049: Application, Approved, applied Jul 25, 2023. Removing existing hvac system relocating new system which consist of a 3 ton outdoor condenser, 3ton indoor coil and 80k btu furnace.
- Historic Preservation Commission case H23-168: Application, Approved, applied May 4, 2023. Remove existing roof down to wood substrate and replace with a new modified rubber roof. Install retro 4inch fit drain with leaf cage. Install taper board in drainage area to pitch water towards drain. Replace existing skylight hatch with…

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology