# 425 Washington Blvd, Jersey City

Commercial · built 2004 · Block 11603, Lot 45.02.

On Umarelli: https://umarelli.org/jersey-city/11603/45.02/425-washington-blvd

More construction in Metroplaza: https://umarelli.org/jersey-city/downtown/metroplaza.md

## Building permits

- Alteration, issued Jun 2, 2025, estimated cost $823K, 40 stories, described as “Balcony Repair as per approved plan”
- Alteration, issued Jan 27, 2025, estimated cost $14K, described as “Installation of sidewalk shed”
- Alteration, issued Nov 20, 2024, estimated cost $25K, described as “Install EV chargers in the existing parking garage”
- Major renovation, issued Oct 3, 2024, estimated cost $2.2M, 40 stories, described as “--- Roof Repair and Electrical Upgrade of Parking Garage located at Residential building containing a commercial unit. The general scope of work entails the removal and replacement of partial depth concrete surface and crack rep”
- Alteration, issued May 6, 2024, estimated cost $11K, 40 stories, described as “2 signs for goddard school north elevation - hdu logo and letter set (non illuminated) 45 sq ft east elevation - channel letter set, raceway mounted w/ single stroke led illumination 62 sq ft”
- Alteration, issued Jan 24, 2024, described as “Build -out of a new day care facility 12,330 sq. ft.”
- Alteration — Multi-Family, issued May 10, 2023, estimated cost $20K
- Major renovation — Commercial, issued Mar 16, 2023, estimated cost $3.5M
- Alteration, issued Jan 13, 2021, described as “Sign”
- Alteration, issued Feb 21, 2020, described as “Renovation of existing lobby and clubroom relocate existing duct work and registers as per plans folder missed placed +a and +b unpaid 2/21/2020 payment scanned and attached”
- Alteration, issued Jan 8, 2020, described as “Interior of existing restarunt formaly (chillis) remove all equipment, millwork old furniture”
- Alteration — Residential, issued Nov 13, 2018, estimated cost $280K
- Alteration, issued Sep 24, 2015, described as “Direct replacement of domestic water booster station”
- Alteration, issued Jul 23, 2015, described as “Direct replacement of central ac unit”
- Alteration, issued Apr 23, 2015, described as “Renovate interior of leasing office, open wall @ conference room and replace cabinets in storage room. Marbella Tower”
- Alteration, issued Dec 30, 2013, described as “Sidewalk bridge w/lighting”
- Alteration, issued Oct 3, 2012, described as “Removal of existing awning & frame and install new frames and fabric”
- Alteration, issued May 26, 2011, described as “Renovation of existing club room/lounge as per drawings”
- Alteration, issued May 26, 2011, described as “Renovation of fitness center on the 7TH floor as per drawings”
- Alteration, issued May 10, 2011, described as “Renovation of existing leasing office as per drawings”
- Alteration, issued Apr 3, 2009, described as “Test bording & grounding for outdoor swimming pool.”
- Alteration, issued Feb 8, 2006, described as “Contruction trash enclosure”
- Alteration, issued Dec 23, 2004, described as “3 receptacles 1 switches 117 communication”
- Alteration, issued Oct 22, 2004, described as “2 wet chemical”
- Alteration, issued Oct 22, 2004, described as “Install 3 hoods for Chilis”

10 more, older permits are in this building’s full list on the map: https://umarelli.org/jersey-city/11603/45.02/425-washington-blvd.

## Property taxes

- Assessment: $139,059,200
- 2025 tax: $3,247,032
- Assessed land: $37,080,000
- Assessed improvements: $101,979,200

## Zoning

Harsimus Cove Station Redevelopment Plan, East Waterfront Dist.

## Flood zone

Current FEMA flood map: zone X, moderate risk: a 0.2% chance of flooding each year. FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NAVD88).

## Board and land use applications

- Marbella (case P21-161): Completed, 412 units, 40 stories, 411 feet tall, 5,600 sq ft retail, 318 parking spaces

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
