# 341 Monmouth St, Jersey City

Condominium · 470 units · built c. 1900 · Block 12608, Lot 5.

On Umarelli: https://umarelli.org/jersey-city/12608/5/341-monmouth-st

More construction in Van Vorst Park: https://umarelli.org/jersey-city/downtown/van-vorst-park.md

Every lot on block 12608: https://umarelli.org/jersey-city/12608.md

## Building permits

- Alteration, issued Nov 9, 2026, estimated cost $2K, described as “R/r 1 electrical WH”
- Alteration, issued Aug 17, 2026, estimated cost $1K, described as “Direct replacment of one split HVAC unit this serves the elevator machine room for the entire building”
- Alteration, issued Aug 14, 2026, described as “Apartment alteration (Van Vorst Park Historic District-H-26-0062)”
- Alteration, issued Sep 2, 2025, estimated cost $1K, described as “Replacement of 40 Gal Electric water heater”
- Alteration, issued Jun 20, 2025, estimated cost $49K, described as “Replace fire pump system”
- Alteration, issued Aug 22, 2024, estimated cost $1K, described as “Replacement of 50 Gal Electric water heater”
- Alteration, issued May 3, 2024, estimated cost $1K, described as “Install a 40 amp 240-volt circuit for an electric cooktop.”
- Alteration, issued Apr 26, 2024, estimated cost $18K, described as “Installing 2 ev chargers with 1 pedestal in parking lot.”
- Alteration, issued Mar 4, 2024, estimated cost $2K, described as “Our water heater is 14 years old and our inspector advised us to replace it after purchase as it was past the standard useful life of 10-12 years. We would like to have Pruzansky Plumbing replace our current 50 Gallon electric water heater”
- Alteration, issued Oct 30, 2023, estimated cost $2K, described as “Replaced one water heater”
- Alteration, issued Oct 4, 2023, estimated cost $1K, described as “Electrical Dryer outlet”
- Alteration, issued Aug 7, 2023, estimated cost $20K, described as “Direct replacement of two boiler and one rpz”
- Alteration — Multi-Family, issued Mar 28, 2023, estimated cost $100K
- Alteration — Multi-Family, issued Apr 27, 2022, estimated cost $7K
- Alteration — Multi-Family, issued Sep 28, 2021, estimated cost $2K
- Alteration — Multi-Family, issued Sep 23, 2021, estimated cost $1K
- Alteration — Multi-Family, issued Aug 17, 2021, estimated cost $3K
- Alteration — Multi-Family, issued Jun 9, 2021, estimated cost $1K
- Alteration — Residential, issued Apr 25, 2019, estimated cost $16K
- Alteration — Residential, issued Nov 27, 2018, estimated cost $40K
- Alteration — Residential, issued Sep 24, 2018, estimated cost $2K
- Alteration — Residential, issued Sep 24, 2018, estimated cost $999
- Alteration — Residential, issued Sep 24, 2018, estimated cost $849
- Alteration, issued Jun 14, 2013, described as “120V power alarm panel”
- Alteration, issued Apr 16, 2013, described as “Path creation only”

## Property taxes

- Assessment: $51,816,400
- 2025 Tax: $1,208,138
- Assessed land: $10,313,900
- Assessed improvements: $41,502,500
- Condo units with their own tax lots: 109

## Zoning

Dixon Crucible Redevelopment Plan, Dixon District.

## Recent sales

- Apr 22, 2026: $700,000, Unit 0419, 1,219 sq ft ($574 per sq ft)
- Apr 20, 2026: $405,000, Unit 0104, 1,039 sq ft ($390 per sq ft)
- Oct 1, 2025: $315,000, Unit 0308, 525 sq ft ($600 per sq ft)
- Sep 28, 2025: $645,390, Unit 0106, 1,196 sq ft ($540 per sq ft)
- Aug 27, 2025: $620,000, Unit 0424, 1,048 sq ft ($592 per sq ft)
- Aug 22, 2025: $350,000, Unit 0313, 513 sq ft ($682 per sq ft)
- Aug 12, 2025: $622,500, Unit 0410, 1,011 sq ft ($616 per sq ft)
- Jul 2, 2025: $685,000, Unit 0420, 1,300 sq ft ($527 per sq ft)
- Jun 3, 2025: $570,000, Unit 0405, 846 sq ft ($674 per sq ft)
- Feb 6, 2025: $459,000, Unit 0217, 666 sq ft ($689 per sq ft)

The 10 most recent of 53 open-market sales since mid-2019, from the state’s SR1A sales file.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard. FEMA’s preliminary map: zone X, moderate risk: a 0.2% chance of flooding each year.

## Landmarks

Part of Van Vorst Park Historic District (Jersey City historic district).

## Board and land use applications

- Historic Preservation Commission case H-23-0092: Application, Approved, applied Aug 23, 2023. Building: Install foundation for ev charger, 4" Diameter Bollards, concrete parking stops, sign and line striping. Electrical: Install 200A Dist panel & 16.64kw electric car charger.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology