# 30 Hudson St, Jersey City

Commercial · built 2004 · Block 14502, Lot 12.

On Umarelli: https://umarelli.org/jersey-city/14502/12/30-hudson-st

More construction in Paulus Hook: https://umarelli.org/jersey-city/downtown/paulus-hook.md

## Building permits

- New construction, issued Oct 16, 2013, described as “30th floor Interior alterations for construction of new egress in future marketing space for Goldman Sachs”
- Alteration, issued Aug 26, 2026, estimated cost $446K, 40 stories, described as “Renovation of an existing office space, demolition and installation of walls ceilings, doors/hardware and office fronts. Mechanical equipment installation & ductwork, Removal and installation of new plumbing fixtures in pantry, modification”
- Alteration, issued May 28, 2026, estimated cost $81K, described as “Interior modifications on 39th FL. electric and mechanical.”
- Major renovation, issued Jan 20, 2026, estimated cost $3.7M, 40 stories, described as “15,520 partial floor tenant interior improvements to the 21ST floor of an existing 40 story building with new offices, common areas, and support rooms. Scope of work includes demolition, new partitions, new ceilings, new MEP and new finishe”
- Alteration, issued Oct 23, 2025, estimated cost $40K, described as “Ground floor structural concrete slab 12'6" x 315' (related to 50 Hudson new bld) NOTE: SLAB ON 30 HUDSON PROPRTY LINE”
- Alteration, issued Sep 29, 2025, estimated cost $35K, described as “Interior Demolition of an existing tenant space at 21st Floor”
- Alteration, issued Sep 4, 2025, estimated cost $925K, described as “Corebridge Financial - interior office renovation on 18th Floor Total Cost of Construction: $1,074,646.00”
- Alteration, issued Sep 3, 2025, estimated cost $93K, described as “20 AMP Circuits and fun 13 & 14th floors”
- Alteration, issued May 13, 2025, estimated cost $3K, described as “Install dishwasher at existing sink”
- Major renovation, issued May 12, 2025, estimated cost $1.5M, described as “Aegis alteration for floors 8 and 9 8TH floor occupancy 219 9TH floor occupancy 275 cost of construction $8,098,045.00”
- Alteration, issued Apr 11, 2025, estimated cost $250K, described as “Repair of garage ramp. includes demoing a section of the composite.”
- Alteration, issued Apr 11, 2025, described as “Install 8' high fabric furniture panel wall”
- Alteration, issued Mar 28, 2025, estimated cost $53K, described as “Bifurcation Project - Remove existing sprinkler connections between 30 Hudson and 50 Hudson properties within parking garage levels P1 through P4; Installation of new sprinkler branch lines underneath the (future) awning on the P1 level of”
- Alteration, issued Mar 18, 2025, estimated cost $659K, 40 stories, described as “Renovation of an existing office space, relocation of elevator lobby doors, removal of non-bearing walls, patching of existing flooring and finishes, new build out of non-bearing walls including demising walls and tenant pantry. Mechanical”
- Major renovation, issued Mar 17, 2025, estimated cost $5.2M, described as “(corebridge) -- ineterior office renovation on 17TH floor work to include modifications to reception, conferencing executive office space warming pantry, executive restroom, and shower. No change in use, egress or occupancy-------cost of co”
- Alteration, issued Dec 17, 2024, described as “Install four (4) new life safety 120v/20A circuits for fire curtain controllers.”
- Alteration, issued Aug 2, 2024, estimated cost $117K, 40 stories, described as “Minor interior demo & renovation of an existing office space. Combination of 2 offices into 1 larger work room. Mechanical equipment installation, new wall mounted speaker strobe, data gathering panel, area smoke detector and associated ele”
- Alteration, issued Jul 11, 2024, estimated cost $24K, described as “WeWork -Install FCU unit”
- Alteration, issued Jun 10, 2024, estimated cost $100K, described as “Conduit and Wiring for existing subpanels”
- Alteration, issued Jan 29, 2024, estimated cost $24K, described as “GS-30TH Fl. Cup Panel Refeed as per plans.”
- Alteration, issued Aug 10, 2023, described as “Interior alteration for lord abbett - floors 36, 37, 38, 39, 40 cost of construciton - $43,367,000”
- Alteration, issued Jul 12, 2023, estimated cost $745K, described as “Interior alteration updates to office space and horizontal exits”
- Alteration — Commercial, issued Apr 4, 2023, estimated cost $105K
- Major renovation — Commercial, issued Mar 14, 2023, estimated cost $2.4M
- Alteration — Commercial, issued Jan 9, 2023, estimated cost $950K

97 more, older permits are in this building’s full list on the map: https://umarelli.org/jersey-city/14502/12/30-hudson-st.

## Property taxes

- Assessment: $391,226,200
- 2025 tax: $9,135,132
- Assessed land: $107,400,000
- Assessed improvements: $283,826,200
- Last sale: $102,073,564 in 2000

## Zoning

Colgate Redevelopment Plan, Mixed Use.

## Flood zone

Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 9 ft (NAVD88). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NAVD88).

## Board and land use applications

- 30 Hudson Street: Completed, 42 stories, 781 feet tall, 10,000 sq ft retail, 1,168,281 sq ft office, 467 parking spaces