60 Crescent Ave, Jersey City
Public school · Block 17001, Lot 18.
Building permits
- Alteration, issued May 13, 2026, described as “Indoor Air Quality Upgrades at Lincoln High School, PS#48 Replacement of (2) RTU's, (3) AHU's, (3) ACCU's, (10) VUV's, (4) VRF Units, (4) Exhaust Fans (WAIVE FEES- JERSEY CITY PUBLIC SCHOOL)”
- Alteration, issued Dec 11, 2024, estimated cost $15K, described as “Jersey City Board of Eduaction - Destratification fans recepticles. School #48 (waive fees)”
- Alteration, issued Sep 18, 2024, estimated cost $4K, described as “Install 1.5" water service”
- Alteration, issued Dec 12, 2023, estimated cost $26K, described as “UST Removal”
- Alteration, issued Oct 20, 2023, estimated cost $194K, described as “INSTALL (1) 6,000 GALLON GASOLINE AST Must provide the architect letter before the permit can be released.”
- Alteration — Educational, issued Nov 18, 2022, estimated cost $102K
- Alteration — Educational, issued Oct 19, 2022, estimated cost $20K
- Alteration — Educational, issued May 27, 2022, estimated cost $65K
- Alteration — Educational, issued Aug 18, 2021, estimated cost $20K
- Alteration, issued Mar 19, 2015, described as “Replace (5) rooftop ac units spec's enclosed”
- Alteration, issued Jun 6, 2014, described as “Replacement of Hydraulic Pump Unit”
- Alteration, issued Aug 23, 2012, described as “LINCOLN HIGH SCHOOL 183.30 KW solar panel system on roof, concrete block ballast. concrete slab and fence.”
- Alteration, issued Nov 18, 2011, described as “Pool Grounding”
- Alteration, issued Jun 27, 2011, described as “Install rpz backflow on pool supply line.”
- Alteration, issued Aug 2, 2010, described as “Renovation to existing Classrooms on 2nd Floor (263 and 264) according to plans and specs”
- Alteration, issued Aug 21, 2009, described as “Remove 2 existing block walls between classroom 180&181 182&183, new flooring, new ceiling, new lighting, paint new cosmetology equipment power & water open door opening for handicap rm. 156”
- Alteration, issued Jun 28, 2006, described as “Pool bonding”
- Alteration, issued Nov 22, 2005, described as “Water service repair”
- Alteration, issued Oct 4, 2002, described as “Install Sidewalk Shed For Protedtion And Install Scaffold Around The Building To Enable The Alteration The The Building Exterior (lincoln Highschool).”
- Alteration, issued Sep 4, 2002, described as “Emergency Shut Off Switch For Pool”
- Alteration, issued Aug 5, 2002, described as “Wet Chemical System And Kitchen Hood Exhaust”
- Alteration, issued Nov 8, 1999, described as “Alteration Of Nursing And Counselors Office School Base Clinic.”
- Alteration, issued Aug 9, 1999, described as “Gas Piping Hot Water Boiler Backflow Preventer”
- Alteration, issued Oct 19, 1998, described as “Door egress systems”
Property taxes
- Assessment
- $27,025,500
- Assessed land
- $6,743,100
- Assessed improvements
- $20,282,400
Zoning
R-1 (Neighborhood Housing).
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Planning Board case P23-022: Legacy - Land Use, Approved, applied Jan 23, 2022. Proposed new construction of a 5-story, mixed-use building with ground floor retail and residential units on the upper floors.