111 Mc Govern Drive, Jersey City
Industrial · built 1971 · Block 21507, Lot 1.
Building permits
- Alteration, issued Aug 20, 2024, 1 story, described as “Installation of 2 non-illuminated FCO logos 9 SQ.ft”
- Alteration, issued Dec 2, 2020, described as “Replacement of one fifteen tonrooftop package heat/cool unit with gas heat”
- Alteration, issued May 17, 2018, described as “Adding new process drain lines and sumps as part of waste water treatment system”
- Alteration, issued Apr 5, 2018, described as “Non illuminated aluminum panel sign over doors”
- Alteration — Residential, issued Nov 24, 2015, estimated cost $379K
- Alteration, issued Jun 30, 2015, described as “Install added burglar alarm dev ices to an existing alarm system”
- Alteration — Storage, issued Feb 6, 2015, estimated cost $235K
- Alteration, issued Dec 16, 2010, described as “Installation of new hot water boiler”
- Alteration, issued Aug 25, 2010, described as “Provide 2 new roof mounted make up air units to ventilate the warehouse (some structural steel and roof work), HVAC, power wiring for 4 exhaust fans”
- Alteration, issued Aug 11, 2010, described as “ELEC: Elec service and subpanels.”
- Alteration, issued Jun 10, 2010, described as “Upgrade water meters and roof system add sprinklers to rack systems 26 sprinkler head”
- Alteration, issued Sep 15, 2008, described as “1 4 inch water meter”
Property taxes
- Assessment
- $5,091,400
- 2025 Tax
- $118,884
- Assessed land
- $3,087,000
- Assessed improvements
- $2,004,400
- Last sale
- $20,500,000 in 2021
Zoning
Liberty Harbor Redevelopment Plan, Industrial.
Flood zone
Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 9 ft (NAVD88). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 12 ft (NAVD88).
Recent sales
- Sep 10, 2021: $20,500,000, sold with other lots
Open-market sales since mid-2019, from the state’s SR1A sales file.
Board and land use applications
- Planning Board case P2025-0168: Site Plan, Fees Paid, applied Aug 11, 2025. Construct a tanker offload slab, a hose cabinet on the west side of the building. Install a new silo on an existing silo slab. No new building/structure is planned.