20 Theodore Conrad Dr, Jersey City
Industrial · Block 21507, Lot 2.
Building permits
- Alteration, issued Oct 10, 2023, estimated cost $30K, 2 stories, described as “Installation of low voltage detection with audio visuals”
- Alteration — Commercial, issued Jul 18, 2022, estimated cost $163K
- Alteration, issued Oct 2, 2020, described as “Replacement of 1 4 ton rooftop tackage heat/coll unit with gas heat small drawings”
- Addition — Commercial, issued May 10, 2019, estimated cost $62.4M
- Alteration, issued Mar 21, 2019, described as “Footings and Foundation for Sysco”
- Alteration, issued Feb 26, 2019, described as “Remove existing pallet rack and install new pallet rack *** ***”
- Alteration — Storage, issued Jan 15, 2019, estimated cost $925K
- Alteration, issued Oct 5, 2018, described as “Replacement of one (1) roof top 30 ton package heat/cool unit with gas heat.”
- Alteration, issued Jul 13, 2018, described as “Replacement of one 15 ton package heat cool rooftop unit with gas heat”
- Alteration, issued Jun 15, 2018, described as “Replacement of existing refrigeration system / roof replacement”
- Alteration, issued Jun 1, 2018, described as “Sysco Food Systems Roof Replacement See letter from engineer in file”
- Alteration, issued Mar 22, 2018, described as “Insulation for piping valve replacement, 2 roof exhausts”
- Alteration, issued Aug 28, 2017, described as “Build office space new health service clinic”
- Alteration, issued Nov 23, 2015, described as “Installation of (2) set of illuminated letters on office building”
- Alteration, issued Dec 7, 2012, described as “(1-400-A)-Service.”
- Alteration, issued Apr 6, 2010, described as “3- tie in panels.”
- Alteration, issued Jul 23, 2002, described as “Electrical Renovations”
- Alteration, issued Mar 20, 2002, described as “Install 14 Refrigeration Unsits And 11 Drains”
- Alteration, issued Oct 10, 2001, described as “Addition Of Freezer & Cold Dock Expansion. Alteration Of Existing Warehouse For Cooler Expansion. As Per Planning Board Approval Plans... Final Cost Of Construction: $8,661,000.00”
- Alteration, issued May 10, 2001, described as “Temp Service”
- Alteration, issued Apr 23, 2001, described as “Remodel Of Existing Warehouse And Office. As Per Plans. Construction Cost: $335,000.00”
- Alteration, issued Apr 5, 2001, described as “Interior Clean Out”
- Alteration, issued Dec 8, 2000, described as “Foundations For 2 Standby Generators”
Property taxes
- Assessment
- $45,295,900
- 2025 tax
- $1,057,659
- Assessed land
- $28,116,000
- Assessed improvements
- $17,179,900
- Last sale
- $11,600,000 in 1995
Zoning
Liberty Harbor Redevelopment Plan, Industrial.
Flood zone
Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 9 ft (NAVD88). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 12 ft (NAVD88).