100 E. Sheawater Ct, Jersey City
Condominium · 363 units · built 1988 · Block 27503, Lot 11.
Building permits
- Alteration, issued Oct 26, 2026, estimated cost $6K, described as “Building- Install display shelves at merchandising area. Existing floor, wall, & ceiling finishes to remain. Patch as required. Electrical- Existing Electrical service and panel to remain, replace lighting fixture to LED type, add receptacl”
- Alteration, issued Sep 24, 2026, estimated cost $49K, described as “Interior fit-out of existing commercial space for new coffee shop”
- Major renovation, issued Aug 15, 2025, estimated cost $1.0M, described as “--- Roof Replacement, Exterior Facade Repairs, Balcony Repairs, Terrace Repairs, Window & Door Replacement, Plaza & Parking Garage Repairs”
- Alteration, issued Mar 7, 2025, estimated cost $4K, described as “Install Printers”
- Alteration, issued Nov 15, 2024, estimated cost $36K, 3 stories, described as “Kitchen ,primary bath and laundry renovation”
- Alteration, issued Apr 24, 2024, estimated cost $616K, 7 stories, described as “Building 207 Modernize Traction Car #1 and Car #2 as per the attached scope of work pages.”
- Alteration, issued Apr 24, 2024, estimated cost $241K, 5 stories, described as “Building 203 Modernize Hydraulic Car #1 as per the attached scope of work pages.”
- Alteration, issued Apr 24, 2024, estimated cost $616K, 6 stories, described as “Building 208 Modernize Traction Car #1 and Car #2 as per the attached scope of work pages and plans”
- Alteration, issued Apr 24, 2024, estimated cost $458K, 5 stories, described as “Building 102 Modernize Hydraulic Car #1 and Car #2 as per the attached scope of work page.”
- Alteration, issued Apr 24, 2024, estimated cost $458K, 6 stories, described as “Building 101 Modernize Hydraulic Car #1 and Car #2. as per the attached scope of work letter.”
- Alteration, issued Apr 23, 2024, estimated cost $28K, 5 stories, described as “F&I new door operators front+rear. F&I hatch equipment; tracks, interlocks, release rollers”
- Alteration, issued Apr 16, 2024, estimated cost $616K, 8 stories, described as “Modernize Traction car#1 and car#2 as per our attached scope of work.”
- Alteration, issued Apr 10, 2024, estimated cost $28K, 5 stories, described as “F&I new door operators front+rear. F&I hatch equipment; tracks, interlocks, release rollers”
- Alteration, issued Apr 1, 2024, estimated cost $28K, 5 stories, described as “F&I new door operators front+rear. F&I hatch equipment; tracks, interlocks, release rollers”
- Alteration, issued Apr 1, 2024, estimated cost $28K, 5 stories, described as “Car #1- F&I new door operators front+rear. F&I hatch equipment; tracks, interlocks, release rollers”
- Alteration, issued Mar 20, 2024, estimated cost $28K, 5 stories, described as “F&I new door operators front+rear. F&I hatch equipment; tracks, interlocks, release rollers”
- Alteration, issued Feb 26, 2024, estimated cost $28K, 5 stories, described as “Car #1- F&I new hoistway door & door operators front+rear. F&I hatch equipment; tracks, interlocks, release rollers”
- Alteration, issued Feb 23, 2024, estimated cost $28K, 5 stories, described as “F&I new door operators front+rear.PERMIT PASSED #Ev 24 0015 ON 2/23/24 F&I hatch equipment; tracks, interlocks, release rollers”
- Alteration, issued Jan 2, 2024, estimated cost $3K, described as “Replacement of gas water heater”
- Demolition — Multi-Family, issued May 18, 2023, estimated cost $2K
- Alteration — Multi-Family, issued May 26, 2022, estimated cost $40K
- Alteration, issued Jun 13, 2019, described as “Structure slab probe”
- Alteration — Residential, issued Oct 29, 2016, estimated cost $4K
- Alteration, issued May 11, 2015, described as “Furnish, erect and dismantle a scaffold and two sidewalk sheds abandoned on 5/5/20- no activity since 2015”
- Alteration, issued Feb 19, 2015, described as “1-Air Handler 1-Condenser”
9 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $13,233,600
- 2025 tax
- $309,009
- Assessed land
- $2,780,900
- Assessed improvements
- $10,452,700
- Condo units with their own tax lots
- 17
Zoning
Caven Point Redevelopment Plan.
Flood zone
Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 9 ft (NAVD88). FEMA’s preliminary map: zone X, moderate risk: a 0.2% chance of flooding each year.
Recent sales
- Apr 30, 2026: $19,000, Unit P0003, 600 sq ft ($32 per sq ft)
- Dec 12, 2025: $12,000, Unit P0021, 600 sq ft ($20 per sq ft)
- Oct 10, 2025: $20,000, Unit P0032, 600 sq ft ($33 per sq ft)
- Aug 22, 2025: $1,330,000, Unit 0107, 1,975 sq ft ($673 per sq ft)
- Sep 30, 2024: $16,000, Unit P0033, 600 sq ft ($27 per sq ft)
- Feb 29, 2024: $18,000, Unit P0029, 600 sq ft, sold with other lots
- Jan 18, 2024: $12,000, Unit P0022, 600 sq ft, sold with other lots
- Jan 12, 2024: $2,100,000, Unit 0103, 2,950 sq ft, sold with other lots
- Sep 22, 2023: $313,000, Unit 8003, 570 sq ft, sold with other lots
- Nov 3, 2022: $550,000, Unit 8008, 1,920 sq ft, sold with other lots
The 10 most recent of 17 open-market sales since mid-2019, from the state’s SR1A sales file.