# 101-69 E.shearwater Ct, Jersey City

Condominium · 363 units · built 1988 · Block 27503, Lot 11.101.

On Umarelli: https://umarelli.org/jersey-city/27503/11.101/101-69-e-shearwater-ct

More construction in Port Liberte: https://umarelli.org/jersey-city/greenville/port-liberte.md

Every lot on block 27503: https://umarelli.org/jersey-city/27503.md

## Building permits

- Alteration, issued Oct 29, 2026, estimated cost $76K, described as “Interior renovation of residential unit”
- Alteration, issued Oct 26, 2026, estimated cost $6K, described as “Building- Install display shelves at merchandising area. Existing floor, wall, & ceiling finishes to remain. Patch as required. Electrical- Existing Electrical service and panel to remain, replace lighting fixture to LED type, add receptacl”
- Alteration, issued Sep 24, 2026, estimated cost $49K, described as “Interior fit-out of existing commercial space for new coffee shop”
- Alteration, issued Jul 24, 2026, estimated cost $15K, described as “Replace air handler & condenser”
- Alteration, issued Nov 3, 2025, estimated cost $3K, described as “Install EV Car Charger”
- Major Renovation, issued Aug 15, 2025, estimated cost $1.0M, described as “--- Roof Replacement, Exterior Facade Repairs, Balcony Repairs, Terrace Repairs, Window & Door Replacement, Plaza & Parking Garage Repairs”
- Alteration, issued Mar 7, 2025, estimated cost $4K, described as “Install Printers”
- Alteration, issued Nov 15, 2024, estimated cost $36K, 3 stories, described as “Kitchen ,primary bath and laundry renovation”
- Alteration, issued Apr 24, 2024, estimated cost $616K, 7 stories, described as “Building 207 Modernize Traction Car #1 and Car #2 as per the attached scope of work pages.”
- Alteration, issued Apr 24, 2024, estimated cost $241K, 5 stories, described as “Building 203 Modernize Hydraulic Car #1 as per the attached scope of work pages.”
- Alteration, issued Apr 24, 2024, estimated cost $616K, 6 stories, described as “Building 208 Modernize Traction Car #1 and Car #2 as per the attached scope of work pages and plans”
- Alteration, issued Apr 24, 2024, estimated cost $458K, 5 stories, described as “Building 102 Modernize Hydraulic Car #1 and Car #2 as per the attached scope of work page.”
- Alteration, issued Apr 24, 2024, estimated cost $458K, 6 stories, described as “Building 101 Modernize Hydraulic Car #1 and Car #2. as per the attached scope of work letter.”
- Alteration, issued Apr 23, 2024, estimated cost $28K, 5 stories, described as “F&I new door operators front+rear. F&I hatch equipment; tracks, interlocks, release rollers”
- Alteration, issued Apr 16, 2024, estimated cost $616K, 8 stories, described as “Modernize Traction car#1 and car#2 as per our attached scope of work.”
- Alteration, issued Apr 10, 2024, estimated cost $28K, 5 stories, described as “F&I new door operators front+rear. F&I hatch equipment; tracks, interlocks, release rollers”
- Alteration, issued Apr 1, 2024, estimated cost $28K, 5 stories, described as “F&I new door operators front+rear. F&I hatch equipment; tracks, interlocks, release rollers”
- Alteration, issued Apr 1, 2024, estimated cost $28K, 5 stories, described as “Car #1- F&I new door operators front+rear. F&I hatch equipment; tracks, interlocks, release rollers”
- Alteration, issued Mar 20, 2024, estimated cost $28K, 5 stories, described as “F&I new door operators front+rear. F&I hatch equipment; tracks, interlocks, release rollers”
- Alteration, issued Feb 26, 2024, estimated cost $28K, 5 stories, described as “Car #1- F&I new hoistway door & door operators front+rear. F&I hatch equipment; tracks, interlocks, release rollers”
- Alteration, issued Feb 23, 2024, estimated cost $28K, 5 stories, described as “F&I new door operators front+rear.PERMIT PASSED #Ev 24 0015 ON 2/23/24 F&I hatch equipment; tracks, interlocks, release rollers”
- Alteration, issued Jan 2, 2024, estimated cost $3K, described as “Replacement of gas water heater”
- Alteration, issued May 18, 2023, described as “Building Permit Application (Building Tech Only) non structural interior clean out of vacant single family residential unit”
- Alteration — Multi-Family, issued Apr 21, 2023, estimated cost $3K
- Alteration — Multi-Family, issued Sep 13, 2022, estimated cost $860

17 more, older permits are in this building’s full list on the map: https://umarelli.org/jersey-city/27503/11.101/101-69-e-shearwater-ct.

## Property taxes

- Assessment: $13,755,900
- 2025 Tax: $321,199
- Assessed land: $2,970,000
- Assessed improvements: $10,785,900
- Condo units with their own tax lots: 33
- Last sale: $1,850,000 in 2006

## Zoning

Caven Point Redevelopment Plan.

## Recent sales

- May 20, 2026: $380,000, Unit 0028, 1,100 sq ft ($345 per sq ft)
- Oct 27, 2025: $775,000, Unit 0067, 2,050 sq ft ($378 per sq ft)
- Oct 17, 2025: $440,000, Unit 0034, 1,495 sq ft ($294 per sq ft)
- Jun 26, 2025: $450,000, Unit 0035, 1,460 sq ft ($308 per sq ft)
- Sep 24, 2024: $500,000, Unit 0045, 1,460 sq ft ($342 per sq ft)
- Sep 19, 2024: $349,000, Unit 0025, 1,460 sq ft ($239 per sq ft)
- Jun 21, 2024: $485,000, Unit 0024, 1,495 sq ft ($324 per sq ft)
- May 29, 2024: $332,000, Unit 0023, 960 sq ft ($346 per sq ft)
- May 8, 2024: $360,000, Unit 0028, 1,100 sq ft, sold with other lots
- Apr 11, 2024: $360,000, Unit 0032, 960 sq ft, sold with other lots

The 10 most recent of 26 open-market sales since mid-2019, from the state’s SR1A sales file.

## Flood zone

Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 9 ft (NAVD88). FEMA’s preliminary map: zone X, moderate risk: a 0.2% chance of flooding each year.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
