1-31 Harbor Drive, Jersey City
Industrial · Block 30307, Lot 6.
Building permits
- Alteration, issued Apr 22, 2026, estimated cost $187K, described as “Interior fit out of a commercial warehouse space and fold sprinkler plan cost of construction: $110,200”
- Alteration, issued Mar 26, 2026, estimated cost $34K, described as “Alterations to existing commercial building ZRA-2026-00148”
- Alteration, issued Mar 5, 2026, estimated cost $5K, described as “Non-structural interior clean-out”
- Alteration, issued Nov 25, 2025, estimated cost $84K, described as “Partial interior demolition of ground floor space (AKA 106 HARBOR)”
- Alteration, issued Sep 12, 2017, described as “Install one illuminated logo wall sign 3'11" x s'-11 i/2" (23.3SF)”
- Alteration, issued Oct 2, 2015, described as “Replace present roof with new epdm roof system need jc reg.”
- Alteration, issued Nov 10, 2010, described as “PLUMB/ELEC: Replace-(1)-condensing unit.”
- Alteration, issued Apr 12, 2010, described as “Replace 2- HVAC roof top units”
- Alteration, issued May 15, 2008, described as “Elec: Energy saving lighting retrofit of (57) fixtures.”
- Alteration, issued Mar 25, 2008, described as “257 lighting fixtures”
- Alteration, issued Aug 21, 2007, described as “1 water heater replacement”
- Alteration, issued Dec 4, 2006, described as “Alarm/fire/smoke detector system”
- Alteration, issued Jun 6, 2006, described as “17 lighting fixtures”
- Alteration, issued May 3, 2001, described as “Install Chain Link Fence Across Rear Property Line, Install 6 Bumper Posts At Front Entrance To Parkin G Lot”
Property taxes
- Assessment
- $5,000,000
- 2025 tax
- $116,750
- Assessed land
- $1,742,000
- Assessed improvements
- $3,258,000
- Last sale
- $4,600,000 in 2013
Zoning
Greenville Industrial Redevelopment Plan.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard. FEMA’s preliminary map: zone X, moderate risk: a 0.2% chance of flooding each year.
Board and land use applications
- Planning Board case P23-035: Legacy - Land Use, Pending Resolution, applied Feb 15, 2023. Construct 10,000 square foot freezer.