# 231 Twelfth St, Jersey City

Commercial · Block 8603, Lot 2.

On Umarelli: https://umarelli.org/jersey-city/8603/2/231-twelfth-st

More construction in Van Leer: https://umarelli.org/jersey-city/downtown/van-leer.md

Every lot on block 8603: https://umarelli.org/jersey-city/8603.md

## Building permits

- Alteration, issued Oct 27, 2025, estimated cost $3K, described as “Low-voltage cabling for POS network”
- Alteration, issued Jul 1, 2025, estimated cost $7K, described as “Installation of one (1) 48sf wall sign”
- Alteration, issued Jun 24, 2025, estimated cost $194K, described as “Interior (only) tenant fit-out for Wingstop restaurant Cost of Work: $228,250.00”
- Alteration, issued Nov 25, 2024, estimated cost $2K, described as “Install up to 30 data cables for registers, kitchen monitors, credit card readers, and kiosks inside of the Taco Bell located at 231 12th St.”
- Alteration, issued Mar 12, 2024, estimated cost $525K, 1 story, described as “231-235 12th St. - BP Convenient Store, on existing Gas station pad. Not touching Gas pumps.”
- Alteration, issued Feb 23, 2024, described as “Demolish Car wash and convenience store only”
- Demolition, issued Feb 23, 2024, described as “Demolish Car wash and convenience store only”
- Alteration, issued Oct 18, 2023, estimated cost $2K, described as “1100G UST Removal”
- Alteration — Commercial, issued Oct 11, 2018, estimated cost $130K
- Alteration, issued Oct 11, 2018, described as “Remove 4 - 12,000 gallon ust”
- Alteration, issued Feb 22, 2011, described as “Replace 1- backflow 2IN.”
- Alteration, issued Oct 18, 2010, described as “Relocate motors as per drawings”
- Alteration, issued Mar 23, 2010, described as “Alteration / Addition for Convenience Store at BP Gas Station Cost of Construction: $101,800.00”
- Alteration, issued Dec 2, 2008, described as “Reface existing free standing sign, apply decal and 3 bo logos to to canopy, reimage gas pumps as per plans”
- Alteration, issued Nov 16, 2001, described as “Replace Existing Pylon Sign, Cover Aluminum Fascia, Canopy. Install Accent Lighting, Replace Existing Canopy Signs”
- Alteration, issued Apr 26, 1999, described as “Add 526 sq ft to existing car wash”

## Property taxes

- Assessment: $3,324,900
- 2025 tax: $87,759
- Assessed land: $2,839,000
- Assessed improvements: $485,900

## Zoning

Jersey Avenue Tenth Street Redevelopment Plan, Commercial Strip District.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard. FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NAVD88).

## Board and land use applications

- Planning Board case P2025-0095: Site Plan Amendment, Approved, applied Apr 29, 2025. Site plan amendment to application P22-161 revising proposed exterior signage for Wingstop restaurant per attached plans in this submisison.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
