# 220 Ninth St, Jersey City

Mixed Use · 57 units · built 2022 · Block 8803, Lot 1.

On Umarelli: https://umarelli.org/jersey-city/8803/1/220-ninth-st

More construction in Hamilton Park: https://umarelli.org/jersey-city/downtown/hamilton-park.md

Every lot on block 8803: https://umarelli.org/jersey-city/8803.md

## Building permits

- New — Multi-Family, issued Nov 27, 2019, estimated cost $14.6M, 57 units, 9 stories
- Alteration, issued Apr 23, 2026, described as “Office to a spa (esthetician) 2ND floor inside of andco (a&co) suite 2047 no cost of construction”
- Alteration, issued Jun 23, 2025, described as “Two (2) new non-illuminated blade signs, each measuring 30" H x 30" W, with different artwork on each face. Each sign has a total area of 6.25 sq. ft.”
- Alteration, issued Aug 5, 2024, estimated cost $75K, described as “New 1236 SF Bagel Shop in existing building (220 9th Street). Business address 176 Erie St COST OF CONSTRUCTION - $120,000”
- Alteration, issued May 15, 2024, estimated cost $108K, described as “Tenant fitout for Schnabel Engineering Office Suite on third floor. Space is 2800 SF, and contains 6 offices, 1 conference room, and open work space. COST OF CONSTRUCTION - $105,500”
- Alteration, issued Apr 10, 2024, estimated cost $17K, described as “Tenant Fit-Out for 675 SF Photography Studio. K Photo Studio Studio is located on the third floor of an existing building. COST OF CONSTRUCTION - $36,900”
- Alteration, issued Apr 10, 2024, estimated cost $5K, described as “Electrical Work Permit: Installation of 12x12 trough in existing electrical room to accommodate 6 individual 200 AMP meters and disconnects for future commercial tenants. Trough is tying into EXISTING switchgear and EXISTING 800 amp distrib”
- Alteration, issued Jan 31, 2024, estimated cost $87K, described as “9,020 SF coworking off space on second floor. ANDCO WORK SPACE COST OF CONSTRUCTION - $175,500”
- Alteration, issued Dec 5, 2023, estimated cost $35K, described as “Interior fit out of 1641 sf brokerage office - sawyer brokerage cost of construction - $118,000”
- Alteration, issued Nov 22, 2023, estimated cost $57K, described as “Tenant fit out for Salon 10N (hair salon). COST OF CONSTRUCTION - $57,200”
- Alteration, issued Oct 20, 2023, estimated cost $70K, described as “Tenant Fitout for 2400 SF office space on third floor Votum Enterprises COST OF CONSTRUCTION - $88,000”
- Alteration, issued Oct 6, 2023, estimated cost $162K, described as “Tenant fit out for Tiger Schulmann's martial arts school. The business will be located in a portion of the cellar with a ground floor entrance from Erie Street. COST OF CONSTRUCTION - $74,000”
- Alteration — Multi-Family, issued May 23, 2023, estimated cost $120K
- Alteration — Multi-Family, issued May 23, 2023, estimated cost $35K
- Alteration — Multi-Family, issued May 23, 2023, estimated cost $35K
- Alteration — Retail, issued Mar 30, 2023, estimated cost $108K
- Alteration — Multi-Family, issued Jul 11, 2022, estimated cost $20K
- Alteration — Commercial, issued May 23, 2022, estimated cost $93K
- Alteration, issued May 23, 2022, estimated cost $143K
- Alteration, issued Dec 23, 2020, described as “2 traction elevators”
- Alteration, issued Dec 23, 2020, described as “Installation of 1 hydraulic elevator (2)”
- Alteration, issued Jul 16, 2020, described as “Erection of construction hoist”
- Alteration, issued Sep 4, 2019, described as “4- receptacles/ no trailers on site 1- 600 amp temp service 2- 200 amp subpanels”
- Demolition — Commercial, issued Jun 20, 2019, estimated cost $30K
- Alteration — Residential, issued May 6, 2019, estimated cost $8K

## Property taxes

- Assessment: $26,124,500
- 2025 Tax: $612,237
- Assessed land: $5,700,000
- Assessed improvements: $20,424,500
- Last sale: $200,000 in 2006

## Zoning

Hamilton Square Redevelopment Plan, Erie Street District.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Silverman: Completed, 57 units, 5 stories, 3,025 sq ft office

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
