# 125 Broad Street, Manhattan

Office condominium · built 1970 · Block 5, Lot 7501.

On Umarelli: https://umarelli.org/nyc/1000057501/125-broad-street

More construction in Financial District: https://umarelli.org/nyc/manhattan/financial-district.md

Every lot on block 5: https://umarelli.org/nyc/manhattan/5.md

## Building permits

- Alteration, filed Nov 17, 2026, estimated cost $324K, described as “Filing herewith interior removals as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 21, 2026, estimated cost $5K, described as “Installation of 300PSF sidewalk shed and temporary construction fence as per plans. All equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this application.”
- Alteration, filed Sep 3, 2026, described as “Suspended Scaffolding for Facade Restoration as Shown on Plans”
- Alteration, filed Aug 14, 2026, estimated cost $349K, described as “Exterior Facade Repairs. No change to use, egress or occupancy.”
- Alteration, filed Jul 17, 2026, estimated cost $54K, described as “Replacement of existing diffusers and addition of exhaust fan for it loads as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jul 17, 2026, estimated cost $996K, described as “The scope of this project is interior build-out of a single tenant space including construction andinstallation of partitions, millwork, floor and wall finishes, door, plumbing fixtures and lightfixtures. No change in use, egress &…”
- No Work, filed May 14, 2026
- Alteration, filed Apr 10, 2026, estimated cost $13K, described as “Alteration of the existing sprinkler system on 10TH floor as per new architectural layout”
- Alteration, filed Apr 9, 2026, estimated cost $27K, described as “Mechanical modification work on the 10TH floor as per plans filed herewith. No change to use, egress or occupancy”
- Alteration, filed Apr 8, 2026, estimated cost $292K, described as “Existing 10TH floor space to be sub-divided into a multi-tenant floor. New demised, nonload bearing partitions to be built to separate the spaces. New rated hm doors and welded frames to be installed for both tenants.”
- Alteration, filed Jan 21, 2026, estimated cost $5K, described as “Installation of a temporary scaffold as per plans. No change in use, egress or occupancy under this application. Scaffold to comply with 2022 NYC building code, chapter 33”
- Alteration, filed Jan 16, 2026, estimated cost $8K, described as “Installation of 300PSF heavy duty sidewalk shed as per plans. Sidewalk shed shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Nov 24, 2025, estimated cost $2.5M, described as “Application filed for interior renovation in an existing single tenant office space on the 34 floor as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Nov 12, 2025, estimated cost $297K, described as “Modifications to the existing HVAC system (PRV Project) in the 2nd sub-cellar as per plans. No change to use, egress or occupancy.”
- Alteration, filed Aug 28, 2025, estimated cost $293K, described as “Filing herewith for the renovation at 34 th floor. There is no change to use, egress, or occupancy.”
- Alteration, filed Jul 3, 2025, estimated cost $84K, described as “General construction work for interior renovation on the 9TH floor as per plans filed herewith. No change to use, egress or occupancy”
- Alteration, filed Mar 31, 2025, estimated cost $110K, described as “Office renovation, 28th floor. No change to use, egress or occupancy.”
- Alteration, filed Jan 16, 2025, estimated cost $2.0M, described as “Filing for repairs to a parking garage. No change to use, egress or occupancy.”
- Alteration, filed Aug 29, 2024, estimated cost $5K, described as “Installation of 300 psf sidewalk shed as per plans. All equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Mar 31, 2023, estimated cost $1.3M, described as “Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, occupancy or egress.”
- Alteration, filed Mar 23, 2023, estimated cost $573K, described as “Modification to mechanical systems as per plan. No change in use, egress or occupancy”
- Alteration, filed Mar 22, 2023, estimated cost $200K, described as “Modifications to existing plumbing & sprinkler system as per plans filed herewith. No change in use,egress or occupancy.”
- Alteration, filed Feb 8, 2023, estimated cost $6K, described as “Installation of heavy duty sidewalk shed as per plans. Shed shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Feb 8, 2023, estimated cost $4K, described as “Installation of pipe scaffolding as per plans. Pipe scaffold shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Oct 28, 2022, estimated cost $221K, described as “Exterior renovations as per plans. Work includes installtion of lateral bracing, exterior masonry wall replacement, helical ties installation, flashing & joint sealant installation, and cmu wall reconstruction. No change to use, egress, or…”

25 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1000057501/125-broad-street.

## Property taxes

- Assessment: $119,913,043
- 2026–27 tax: $11,570,068
- Market value (city estimate): $266,473,614
- Taxable value: $106,656,229
- Assessed land: $30,960,034
- Assessed improvements: $88,953,009
- Condo units with their own tax lots: 26

## Tax breaks

- Nonprofit exemption (charitable), with no end date, about $1,090,381 a year below the full tax.

## Zoning

C5-5: floor area ratio 19.47 built, above the 15.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Apr 26, 2016: $129,482,000, Unit A
- Apr 26, 2016: $72,518,000, Unit C

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NGVD29).

## Board and land use applications

- Water Street POPS Upgrades Text Amendment (City Planning P2014M0256): Completed, decided Jun 27, 2016. Zoning text amendment to the Special Lower Manhattan District and related sections to allow the infill of arcades for retail use and upgrades to existing plazas.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
