34 Whitehall Street, Manhattan
Commercial · built 1970 · Block 9, Lot 1.
Building permits
- Alteration, filed Oct 19, 2026, estimated cost $557K, described as “Select demolition of non-bearing partitions and existing pantry and white boxing the suite. New polished concrete floors, paint throughout. No change in use, egress or occupancy.”
- Alteration, filed Aug 5, 2026, estimated cost $825K, described as “Partial alteration to interior mezzanine and exterior rooftop for addition of new retail & commercial space for existing commercial building.”
- Alteration, filed Sep 15, 2025, estimated cost $53K, described as “Filing herewith drawings indicating modification of the Sprinkler System on the 8th and 9th floors. No change in use, egress, or occupancy under this application.”
- Alteration, filed Sep 15, 2025, estimated cost $63K, described as “Filing herewith drawings indicating modification of the Mechanical system on the 8th floor. No change in use, egress, or occupancy under this application.”
- Alteration, filed Sep 15, 2025, estimated cost $10K, described as “Filing herewith drawings indicating modification of the Plumbing on the 8th floor. No change in use, egress, or occupancy under this application.”
- Alteration, filed Sep 12, 2025, estimated cost $200K, described as “Filing herewith drawings indicating interior renovations on the 8th & 9th floor. No change in use, egress, or occupancy under this application.”
- Alteration, filed Aug 4, 2025, estimated cost $1.1M, described as “Interior renovation of partitions, ceilings and doors as shown on plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Aug 4, 2025, estimated cost $40K, described as “Herewith filing for interior renovations on the 8th (suite 801) floor as per plans. No change to use, occupancy, or egress.”
- Alteration, filed Aug 4, 2025, estimated cost $50K, described as “FISP Cycle 9A Facade Repairs. Shelf angle refurbishment, including removal and replacement of brick masonry veneer. Mullion track repair and alignment. No change to use, occupancy or egress.”
- Alteration, filed Jul 8, 2025, estimated cost $196K, described as “Interior construction including new carpet, partitions, drywall ceiling, lighting, blocking, millwork, bookshelves, and finish upgrades in conference rooms, offices, wellness, and operations rooms. No change in use, egress, or occupancy.”
- Alteration, filed Apr 28, 2025, estimated cost $53K, described as “Scope of work includes demolition of existing partitions, patch flooring finish and replace ceiling grid as indicated on plans. No change in use, occupancy or egress.”
- Alteration, filed Apr 2, 2025, estimated cost $1.7M, described as “Proposed tenant improvement on 20C/21M floor including new partitions, ceiling, flooring, lighting. No proposed work to the exterior. No change in use, egress or occupancy.”
- Alteration, filed Feb 14, 2025, estimated cost $95K, described as “Removal and installation of non-load bearing partitions, ceilings and doors; related finishes. No change in use, egress or occupancy.”
- Alteration, filed Oct 16, 2024, estimated cost $130K, described as “Mechanical work as shown on plans (AHU Upgrade).”
- Alteration, filed Aug 26, 2024, estimated cost $4K, described as “Installation of beta max and system scaffolding as per plans. All equipment shall comply with chapter # 33 of the 2022 code. No change in use occupancy or egress under this application.”
- Alteration, filed Aug 9, 2024, estimated cost $963K, described as “General construction work as shown on plans.”
- Alteration, filed May 31, 2024, estimated cost $150K, described as “Proposed elevator shaft, roof bulkhead and vestibule as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Mar 21, 2023, estimated cost $8K, described as “Proposed mechanical work filed in conjuction with interior renovation of an existing office space at the 10TH floor. No change in use, egress or occupancy.”
- Alteration, filed Mar 21, 2023, estimated cost $103K, described as “Proposed sprinkler work filed in conjuction with interior renovation of an existing office space at the 10TH floor. No change in use, egress or occupancy.”
- Alteration, filed Mar 21, 2023, estimated cost $20K, described as “Proposed plumbing work filed in conjuction with interior renovation of an existing office space at the 10TH floor. No change in use, egress or occupancy.”
- Alteration, filed Mar 20, 2023, estimated cost $385K, described as “Interior renovation of an existing office space at the 10TH floor as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed May 25, 2022, estimated cost $100K, described as “Gc to erect temporary sidewalk shed for work area access, protection, and protection of public to include roof and secured doors. See construction fence note and drawings below.”
- Alteration, filed May 19, 2022, estimated cost $10K, described as “Filed for cellar structural repair work”
- Alteration, filed Jan 11, 2022, estimated cost $88K, described as “Install 3 ac units in offices on 32ND floor, as per plans. Work filed in conjunction with interior renovation filed under application#:123911589 and plumbing& sprinkler application#: M00351285. No change in use, egress or occupancy under…”
- Alteration, filed Jan 11, 2022, estimated cost $60K, described as “Plumbing & sprinkler work in conjunction with interior renovation to existing office space on partial 032 floor, as per plans. Filed in conjunction with (gc) app.#: 123911589, and mechanical app.#M00351276. No change in use, egress or…”
23 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $83,362,050
- 2026–27 tax
- $8,991,383
- Market value (city estimate)
- $185,249,000
- Taxable value
- $83,362,050
- Assessed land
- $23,895,000
- Assessed improvements
- $59,467,050
Tax breaks
- Abatement (city code CERP), through Nov 30, 2030, a $51,733 credit this tax year.
Zoning
C5-5: floor area ratio 23.49 built, above the 15.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 12 ft (NAVD88).