401 South End Avenue, Manhattan
Other · built 2024 · Block 16, Lot 3.
Building permits
- New Building — Non-residential, filed Feb 2, 2022, estimated cost $317K, 3 stories, described as “New (3) Story mix use building.”
- Alteration, filed Sep 23, 2026, estimated cost $3K, described as “Installation of temporary construction fence per plan submitted. Work shall comply with 2022 building code chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed May 22, 2026, estimated cost $424K, described as “Proposed eating and drinking establishment, and accessory kitchen. Use and occupancy established under NB application M00613188-I1. No change in use, egress or occupancy.”
- Alteration, filed Mar 17, 2026, estimated cost $1.1M, described as “Installation of temporary construction fence system as per drawings. Fence shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application”
- Alteration, filed Jan 16, 2026, estimated cost $31.1M, described as “Reach 3 - New flood wall construction for North/West Battery Park City Resiliency Project, including excavation, grading, landscaping, soil improvement, fill compaction, erosion control, and foundation stabilization. No change to use,…”
- Alteration, filed Dec 5, 2025, estimated cost $41.6M, described as “REACH 4 - New flood wall construction per BPCR Project. Scope includes excavation, grading, landscaping, soil improvement, utility and drainage upgrades, fill placement, and foundation stabilization. See G-004.00. No change to use, egress…”
- Alteration, filed Aug 20, 2025, estimated cost $949K, described as “3 temp. 6" watermain relocations, mount insulated HDPE watermains on existing facades and connect to existing bldg. at the facade. Install 12" private drain from pumphouse park, trench drain on Liberty St, and 12" drain to outfall to…”
- Alteration, filed Aug 20, 2025, estimated cost $20.6M, described as “Filing for Structural/Foundation work for EWP5 - construction of tide gates and stormwater lines in advance of construction of a flood barrier system for the BPCA North/West Battery Park City Resiliency project. No change to use egress or…”
- Alteration, filed Jul 1, 2025, estimated cost $82.5M, described as “Reach 6-New flood wall constr. for NWBPCR project. Scope includes excavation, grading, landscaping, soil improvement. Add & compact fill to stabilize site with erosion cont. Stabilize foundations of adj. structures. No change to use,…”
- Alteration, filed Jun 23, 2025, estimated cost $39.9M, described as “Reach 7-new flood wall constr. For nwbpcr proj. Scope involves excavation, grading, landscaping soil improvement. Adding & compacting fill to stabilize site w/ erosion cont. Stabilizing foundation of adj. Structures. No change to use,…”
- Alteration, filed Jun 16, 2025, estimated cost $22.0M, described as “Filing for earthwork for reach 2 - this scope involves excavation, grading, landscaping soil improvement per plans. Adding and compacting fillto stabilize the site with erosion cont. Stabilizing foundation of adjacent structures.”
- Alteration, filed Jun 7, 2025, estimated cost $84.7M, described as “Reach 5 - filing for Earthwork/ Construction of a flood barrier system and two bridging structures for the BPCA North/West Battery Park City Resiliency project. No change of use, occupancy and egress.”
- Alteration, filed Jun 4, 2025, estimated cost $3.8M, described as “Filing for Earthwork for EWP4 - relocation of critical utilities (ECS, water) in advance of construction of a flood barrier system for the BPCA North/West Battery Park City Resiliency project. No change to use, egress, or occupancy.”
- Alteration, filed Jun 4, 2025, estimated cost $5.5M, described as “Filing Earthwork for EWP5 - Construction of tide gates and stormwater lines in advance of construction of a flood barrier system for the BPCA North/West Battery Park City Resiliency project. No change to use egress or occupancy.”
- No Work, filed Apr 23, 2025
- No Work, filed Apr 23, 2025
- Alteration, filed Jun 21, 2023, estimated cost $56.0M, described as “Redevelopment of floor barrier system (structural work) package 4. No change of use egress or occupancy under this application”
- Alteration, filed Mar 28, 2023, estimated cost $1K, described as “Installation of temporary construction fence. No change in occupancy, use or egress.”
- Alteration, filed Mar 22, 2023, estimated cost $500K, described as “Civil Site work for Storm, Water, and Sanitary water connection. No change of use, egress, or occupancy under this application.”
- Alteration, filed Nov 18, 2022, estimated cost $200K, described as “For temporary construction equipment (fence),submitting on behalf of contractor, no change in use,occupancy or egress”
- Alteration, filed Oct 10, 2022, estimated cost $1K, described as “Herewith filing a construction fence as shown on drawings submitted herewith.”
- Alteration, filed Sep 1, 2022, estimated cost $56.0M, described as “Redevelopment for flood barrier system. (Structural Only) See comment#24”
- Alteration, filed Aug 11, 2022, estimated cost $56.0M, described as “Redevelopment for flood barrier system. (Civil Only). No change of use, egress, or occupancy under this application.”
- Alteration, filed Jul 20, 2022, estimated cost $5.3M, described as “Wagner Park redevelopment for flood barrier system. (Earthwork/Landscape only)”
- Alteration, filed Apr 4, 2022, estimated cost $2K, described as “Installation of plumbing, water service piping, and sprinkler system related to New Building application”
3 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $173,862,335
- Market value (city estimate)
- $386,360,744
- Taxable value
- $0
- Assessed land
- $117,963,335
- Assessed improvements
- $55,899,000
Zoning
BPC.
Flood zone
Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NGVD29). FEMA’s preliminary map: zone X, moderate risk: a 0.2% chance of flooding each year.
Board and land use applications
- Pier A (City Planning P2012M0685): Completed, decided Nov 21, 2012. Chairperson certification pursuant to ZR 62-811(b) that a site plan has been submitted showing compliance with the provisions of Sections 62-50 (General Requirements for Visual Corridors and WPAAs) and 62-60 (Design Requirements for WPAAs).
- BATTERY PARK CITY TEXT (City Planning P2005M0306): Completed, decided Aug 22, 2005. VARIOUS CHANGES RELATING TO THE BPCA & MOD OF ZR84-135 TO*INCLUDE HELIOSTATS & WIND TURBINES AS OBSTRUCTIONS THAT MAY*PENETRATE MAXIMUM HEIGHT LIMITS
- PARK PL WEST (City Planning P2000M0250): Completed, decided Jan 14, 2005. ELIMINATION OF PARK PLACE W. FROM RIVER TERRACE TO MARGINAL*ST FOR RECREATION SPACE IN THE BATTERY PARK CITY SPEC DIST
- BATTERY PK CITY, NO. & SO. RSDL (City Planning P2001M0040): Completed, decided Mar 5, 2001. TEXT CHANGES TO CREATE 2 PUBLIC OPEN SPACES AS PERMANENT*AMENITIES & TO MODIFY & AMEND OTHER SECTION WITHIN THE SPEC*BATTERY PARK CITY
- RIVER TERRACE LANDSCAPING TEXT (City Planning P2000M0260): Completed, decided Aug 28, 2000. TEXT CHANGE TO ALLOW DEVELOPMENT FRONTING ON THE E/S/O*RIVER TERRACE TO PROVIDE LANDSCAPING TREATMENT AS REQUIRED*BY THE BPCA WITHIN 1 & A HALF FT OF THE STREET LINE IN THE*SPECIAL BETTERY PARK CITY DIST
- 22 RIVER TERRACE (City Planning P2000M0286): Completed, decided May 26, 2000. CERT TO ALLOW THE OBSTRUCTIONS TO BE CONCEALED BY AN*ENCLOSURE WALL IN A NEW 27-STORY RESD'L BLDG ON SITE 19A*IN THE SPECIAL BATTERY PARK CITY DISTRICT
- P.S./I.S. 89 (City Planning P1995M0132): Completed, decided Jul 23, 1995. SITE SELECTION & ACQUISITION OF P/O A PARCEL FROM BATTERY PK*CITY FOR USE AS A 600 SEAT ELEMENTARY SCHOOL & 300 SEAT*INTERMEDIATE SCHOOL
- BATTERY PARK CITY GARAGE SITE 11 (City Planning P1992M0078): Completed, decided Dec 16, 1993. 93DCP003M: AUTH TO TRANSFER 38 ACCESSORY PARKING SPACES FROM PARCELS J & K TO SITE II
- SITE XI, BATTERY PARK CITY (City Planning P1990M0311): Completed, decided Jan 2, 1991. AUTH TO COMBINE ACCESSORY PARKING SPACES FROM RESIDENTIAL*NEIGHBORHOOD IN BATTERY PARK CITY SPECIAL DIST
- GATEWAY PLAZA (City Planning P1986M0971): Completed, decided Apr 7, 1989. SPEC PERMIT TO CONVERT ACCESSORY RESDL PKG GARAGES TO ACC-*ESSORY & TRANSIENT PKG W/IN THE BPC SPEC DIST