# 399 Chambers Street, Manhattan

Apartment building · 340 units · built 1998 · Block 16, Lot 210.

On Umarelli: https://umarelli.org/nyc/1000160210/399-chambers-street

More construction in Tribeca: https://umarelli.org/nyc/manhattan/tribeca.md

## Building permits

- Alteration, filed Oct 9, 2026, estimated cost $20K, described as “Replacement of split air conditioning unit all existing duct work to remain. No change in use egress and occupancy.”
- Alteration, filed Oct 20, 2025, estimated cost $45K, described as “Interior renovation of cafe as per plans filed herewith. No change to use, egress nor occupancy.”
- Alteration, filed Oct 3, 2025, estimated cost $45K, described as “Interior renovation of cafe as per plans filed herewith. No change to use, egress nor occupancy.”
- Alteration, filed Mar 26, 2025, estimated cost $20K, described as “Install two (2) new gas-fired barbecue units on roof and cap and remove gas piping to one (1) HVAC unit as per plans. Filed in conjunction with laa application no. M01057667-I1-la. No change in use, egress or occupancy.”
- Alteration, filed Mar 11, 2025, estimated cost $740K, described as “Installation of new generator, associated equipment, concrete pad, and breeching for new generator to connect to existing chimney liner. No change in use, egress, or occupancy.”
- Alteration, filed Dec 30, 2024, described as “Suspended scaffold outrigger system for external restoration works at 41 river terrace, manhattan, ny 10282”
- Alteration, filed Nov 2, 2024, estimated cost $5K, described as “I hereby state that i have exercised a professional standard of care in certifying that the filed application is complete and in accordance with applicable laws, including the rules of the department of buildings, as of this date.”
- Alteration, filed May 23, 2024, estimated cost $500K, described as “Installation of two (2) new gas fueled boilers in cellar. All work as per plans filed herewith. Filing application to supersede application # M00857982-I1 (dual fuel).no change in use, egress, or occupancy.”
- Alteration, filed Feb 16, 2024, estimated cost $111K, described as “Exterior renovations to include brick and sealant replacement, re-coating of balconies and shelf angle replacement as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Jun 14, 2023, estimated cost $364K, described as “Installation of new chimney liner. All work as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed May 31, 2023, estimated cost $600K, described as “Minor interior demolition and general construction for each unit listed for this filing. No change of use, egress or occupancy.”
- Alteration, filed Apr 14, 2023, estimated cost $160K, described as “Plumbing work related to boiler replacement. All work as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Sep 16, 2022, estimated cost $53K, described as “Filing for exterior renovation rooftop wind screen.”
- Alteration, filed Sep 16, 2022, estimated cost $197K, described as “Filing to erect a perimeter wind fence at existing roof terrace. Fence to not exceed 67% of building's perimeter.”
- Alteration, filed Oct 26, 2020, estimated cost $35K, described as “Filing for plumbing work for alteration type ii combination of units 1-7 on the 42ND floor into a single dwelling unit.no change in egress, use or occupancy”

## Property taxes

- Assessment: $48,776,850
- Market value (city estimate): $108,393,000
- Taxable value: $0
- Assessed land: $2,304,000
- Assessed improvements: $46,472,850

## Zoning

BPC.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## In the news

[Rockrose, BPCA Extend Affordability for Tribeca Pointe at 41 River Terrace in Battery Park City, Manhattan](https://newyorkyimby.com/2022/01/rockrose-bpca-extend-affordability-for-tribeca-pointe-at-41-river-terrace-in-battery-park-city-manhattan.html), New York YIMBY, Jan 15, 2022.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
