29 Broadway, Manhattan
Commercial · built c. 1925 · Block 20, Lot 1.
Building permits
- Alteration, filed Oct 9, 2026, estimated cost $1.5M, described as “Facade repair work associated with the Local Law 11/FISP compliance as per drawings.”
- Alteration, filed Sep 29, 2026, estimated cost $1.5M, described as “Facade repair work associated with Local Law 11 compliance as per drawings.”
- Alteration, filed Jul 6, 2026, described as “Suspended Scafolding for Facade Restoration”
- Alteration, filed Jul 1, 2026, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Jul 9, 2024, described as “FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola”
- Alteration, filed Dec 10, 2019, estimated cost $179K, described as “Additions/modifications to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.”
- Alteration, filed Dec 10, 2019, estimated cost $83K, described as “Additions/ modifications to the existing plumbing and sprinkler system.there is no change in use, egress or occupancy.”
- Alteration, filed Oct 30, 2019, estimated cost $5K, described as “Installation of sidewalk shed as per plans. Sidewalk shed live load 300 psf shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy.”
- Alteration, filed Oct 23, 2019, estimated cost $11K, described as “Additions/ modifications to the existing sprinkler system.there is no change in use, egress or occupancy.”
- Alteration, filed Oct 7, 2019, estimated cost $129K, described as “Modification of existing duct work”
- Alteration, filed Oct 7, 2019, estimated cost $79K, described as “Filing for plumbing and sprinkler modifications for an office renovation as per plans filed. no change of use, egress or occupancy.”
- Alteration, filed Jul 25, 2019, estimated cost $17K, described as “Additions/ Modifications to the existing sprinkler system. There is no change in use, egress or occupancy.”
- Alteration, filed Jul 14, 2019, estimated cost $30K, described as “Additions/ Modifications to the existing sprinkler system. There is no change in use, egress or occupancy.”
- Alteration, filed Jun 4, 2019, estimated cost $69K, described as “Additions/ modifications to the existing sprinkler system.there is no change in use, egress or occupancy.”
- Alteration, filed Apr 8, 2019, estimated cost $84K, described as “Additions/ modifications to the existing sprinkler system.there is no change in use, egress or occupancy.”
- Alteration, filed Dec 20, 2018, estimated cost $92K, described as “Additions/ modifications to the existing sprinkler system.there is no change in use, egress or occupancy.”
Property taxes
- Assessment
- $16,633,350
- 2026–27 tax
- $1,799,377
- Market value (city estimate)
- $36,963,000
- Taxable value
- $16,600,512
- Assessed land
- $3,483,000
- Assessed improvements
- $13,150,350
Tax breaks
- Abatement (city code CERP), through Sep 30, 2027, a $1,446 credit this tax year.
Zoning
C5-5: floor area ratio 21.82 built, above the 15.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.