26 Broadway, Manhattan
Commercial · built c. 1885 · Block 22, Lot 13.
Building permits
- Alteration, filed Sep 14, 2026, estimated cost $100K, described as “General Construction as shown on plans filed herewith. No Change to use egress or occupancy.”
- Alteration, filed Jul 7, 2025, estimated cost $60K, described as “General Construction as shown on plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Jun 9, 2025, estimated cost $850K, described as “Filing for exterior facade repair for floors 001-032 as per plans filed herewith. Emergency work order under number 010624. No change in egress, use or occupancy.”
- Alteration, filed Jun 6, 2025, described as “Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.”
- Alteration, filed May 13, 2025, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Jan 10, 2025, estimated cost $1.5M, described as “Interior Renovation as shown on plans filed herewith, no change to use, egress or occupancy.”
- Alteration, filed Aug 6, 2024, estimated cost $40K, described as “Interior demo of non load bearing walls on part of the 3rd floor. No change in egress, use, or occupancy”
- Alteration, filed Jun 11, 2024, estimated cost $402K, described as “Remove partition and door between existing computer lab and library to enlarge computer lab.”
- Alteration, filed Mar 5, 2024, estimated cost $52K, described as “Interior demo as shown on plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Jan 23, 2024, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Aug 31, 2023, estimated cost $60K, described as “Replacing fan coil unit, reusing existing ducts, piping, supports, power and controls. Remoiving a non-load bearing parition to remove unit and reconstruction the partitiuon when new unit is installed.”
- Alteration, filed Feb 2, 2023, estimated cost $783K, described as “Interior renovation as shown on plans filed herewith. No change to use egress or occupancy.”
- Alteration, filed Dec 1, 2022, estimated cost $156K, described as “Interior renovation as shown on plans filed herewith, No change to use, egress, or occupancy.”
- Alteration, filed Nov 29, 2022, estimated cost $55K, described as “Modification of mechanical as shown on plans filed therewith.No change to use, egress or occupancy.”
- Alteration, filed Aug 19, 2022, estimated cost $14K, described as “Modification of sprinkler work as shown on plans herewith.”
- Alteration, filed Aug 19, 2022, estimated cost $28K, described as “Modification to the existing plumbing and related piping as shown on plans filed herewith.”
- Alteration, filed Jul 5, 2022, estimated cost $35K, described as “Modification of Plumbing work as shown on plans filed herewith. No change to use egress or occupancy”
- Alteration, filed Jul 5, 2022, estimated cost $3K, described as “Modification of Sprinkler system as shown on plans herewith. No change to use egress or occupancy.”
- Alteration, filed Jun 29, 2022, estimated cost $181K, described as “Interior renovation as shown on plans filed herewith. No change to use egress or occupancy.”
- Alteration, filed Jun 14, 2022, estimated cost $3K, described as “Modification of Mechanical work as shown on plans filed herewith. No change to use egress or occupancy”
- Alteration, filed Jun 14, 2022, estimated cost $4K, described as “Modification of Sprinkler system as shown on plans herewith. No change to use egress or occupancy.”
- Alteration, filed Apr 27, 2022, estimated cost $2K, described as “Modify existing plumbing fixtures and related piping as shown on plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Apr 27, 2022, estimated cost $5K, described as “Modify existing space as shown on plans filed herewith. No change to use egress or occupancy.”
- Alteration, filed Apr 27, 2022, estimated cost $8K, described as “Modify existing sprinkler heads as shown on plans filed therewith for existing space. No change to use, egress, or occupancy.”
- Alteration, filed Apr 5, 2022, estimated cost $4K, described as “Erect non-illuminated accessory business replacement wall sign on existing cabinet; copy reading "Citizens with Logo"”
24 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $68,282,550
- 2026–27 tax
- $7,391,273
- Market value (city estimate)
- $151,739,000
- Taxable value
- $68,282,550
- Assessed land
- $12,465,000
- Assessed improvements
- $55,817,550
Tax breaks
- Abatement (city code CERP), through Jul 31, 2027, a $16,018 credit this tax year.
Zoning
C5-5: floor area ratio 18.69 built, above the 15.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Landmarks
Part of Standard Oil Building (Individual Landmark). 50 Landmarks Preservation Commission permits are on file.
Board and land use applications
- 140 BROADWAY POPS BIKE SHARE (City Planning P2012M0611): Completed, decided Aug 21, 2012. Chairperson certification for design changes to an existing plaza at 140 Broadway to allow for a bike share docking station.
- STANDARD OIL BLDG (City Planning P1996M0094): Completed, decided Jan 30, 1996. LANDMARK-CITY COLLEGE OF NY, REMSEN CEMETERY,TROTTING*COURSE LA; Additional LPC #(s): 402