# 82 Beaver Street, Manhattan

Condominium · 126 units · built c. 1904 · Block 28, Lot 7501.

On Umarelli: https://umarelli.org/nyc/1000287501/82-beaver-street

More construction in Financial District: https://umarelli.org/nyc/manhattan/financial-district.md

Every lot on block 28: https://umarelli.org/nyc/manhattan/28.md

## Building permits

- Alteration, filed Sep 25, 2026, estimated cost $36K, described as “To propose interior renovation in unit #501 on fifth floor with general construction as per plan filed herewith. No change of use, egress or certificate of occupancy.”
- No Work, filed Jul 4, 2026, described as “FIFA World Cup public viewing events (televised match watch parties) for up to 235 persons, 07/14/2026 - 07/19/2026. Covers the two semi-finals, third-place play-off, and final. Indoor assembly for group viewing of broadcast matches. No…”
- Alteration, filed Aug 13, 2025, described as “Installation of 2 point angle scaffold for facade repair & inspection.”
- Alteration, filed Apr 23, 2025, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Apr 16, 2025, estimated cost $230K, described as “Partial interior alteration to existing bar: selective demo, basic bar millwork, limited non-load bearing partitions, minor floor/ceiling patching, and upgrades to two single user bathrooms. No change in use, egress, or occupancy.”
- Alteration, filed Apr 10, 2025, described as “Installation of outriggers for facade repair and inspections”
- No Work, filed Mar 20, 2025
- Alteration, filed Feb 19, 2025, estimated cost $311K, described as “Facade repairs. No change in use, egress or occupancy.”
- Alteration, filed Dec 3, 2024, estimated cost $20K, described as “Reconnect existing low pressure gas lines. Reconnect existing direct vents on roof. No change in means of egress use group or occupancy.”
- Alteration, filed Sep 12, 2023, estimated cost $23K, described as “Minor interior residential renovation of an existing apartment including new floor & wall finishes as indicated on the drawings filed herein. No change in use, occupancy or egress”
- No Work, filed Aug 25, 2023, described as “Welcome to The Continental: The Hotel Bar Experience is an immersive cocktail experience from the John Wick universe. Guests will have two hours inside the notorious hotel in 1970s New York City. Timed entry tickets will allow guests to…”
- Alteration, filed Jun 13, 2022, estimated cost $21K, described as “Plumbing work at apt #205 at 2nd floor indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application”
- Alteration, filed Jun 13, 2022, estimated cost $10K, described as “General Construction for partition changes and renovate 2 bathrooms at Apt #205 at 2nd floor indicated on drawings filed herewith No change in Use Egress or Occupancy under this application”
- Alteration, filed Dec 17, 2019, estimated cost $8K, described as “Installation of plumbing in connection with DOB job#: 140860922”
- Alteration, filed Nov 6, 2019, estimated cost $41K, described as “"replace boiler breeching per plans"”

## Property taxes

- Assessment: $14,824,746
- 2026–27 tax: $1,689,832
- Market value (city estimate): $32,943,892
- Taxable value: $14,461,113
- Assessed land: $1,930,493
- Assessed improvements: $12,894,253
- Condo units with their own tax lots: 128

## Tax breaks

- Co-op and condo abatement, with no end date, a $72,586 credit this tax year.

## Zoning

C5-5: floor area ratio 13.14 built, 15.00 allowed by base zoning.

## Recent sales

- Sep 22, 2026: $510,000, Apt 904
- Jul 31, 2026: $549,000, Apt PH04
- Jul 16, 2026: $499,000, Apt PH03
- May 21, 2026: $945,750, Apt 509
- Jan 27, 2026: $575,000, Apt 1106
- Jul 11, 2025: $1,455,000, Apt 405
- May 12, 2025: $945,000, Apt 1309
- Dec 27, 2024: $5,500,000, Unit B
- Aug 6, 2024: $890,000, Apt 309
- Jul 2, 2024: $1,080,000, Apt 701

The 10 most recent of 62 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of Beaver Building (Individual Landmark). 22 Landmarks Preservation Commission permits are on file.

## Board and land use applications

- BEAVER BUILDING (City Planning P1996M0264): Completed, decided May 7, 1996. LANDMARK-CITY COLLEGE OF NY, REMSEN CEMETERY,TROTTING\*COURSE LA; Additional LPC #(s): 249

## In the news

[1 Wall Street Banking Room Interior Designated a Landmark in Financial District, Manhattan](https://newyorkyimby.com/2024/07/1-wall-street-banking-room-interior-designated-a-landmark-in-financial-district-manhattan.html), New York YIMBY, Jul 7, 2024.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
