75 Broad Street, Manhattan
Commercial · built c. 1928 · Block 29, Lot 70.
Building permits
- Major Renovation — Conversion, filed Apr 29, 2026, estimated cost $3.8M, 27 units added, 35 stories, described as “Application filed for the conversion of the 2nd floor to residential use as shown on the filed plans”
- Alteration, filed Mar 23, 2026, estimated cost $1K, described as “Replacement of existing windows on first floor mezzanine to 10TH floor and 15TH floor to the 33RD floor. No change in use, egress or occupancy.”
- No Work, filed Oct 23, 2024
- Alteration, filed Aug 30, 2024, estimated cost $120K, described as “Modifications to the existing HVAC System: Adjust Ductwork on the 5th Floor as per plans (Hailey Guiliano - Interior Renovation.) No change to use, egress or occupancy.”
- Alteration, filed Aug 15, 2024, estimated cost $12K, described as “Remove (9) existing heads, relocate (12) existing heads and install (13) new sprinkler heads and associated sprinkler piping on the 5th Floor as per plans (Hailey Guiliano - Interior renovations.) No change to use, egress or occupancy.”
- Alteration, filed Aug 13, 2024, estimated cost $88K, described as “Installation of new interior partitions for offices, doors, suspended ceilings, flooring and finishes on the 5th Floor as per plans (Hailey Guiliano - Interior Renovation.) No change to use, egress or occupancy.”
- Alteration, filed Feb 21, 2023, estimated cost $38K, described as “Remove (99) existing heads, install (9) temporary heads and temp piping, and install (84) new sprinkler heads and associated sprinkler piping on the 6th Floor as per plans (Modivcare - Interior renovations.) No change to use, egress or…”
- Alteration, filed Feb 21, 2023, estimated cost $30K, described as “Remove existing plumbing fixtures & piping as per plans; Install NEW (2) pantry sinks, (2) refrigerators, (2) DW, (1) Funnel drain, (2) Coffee makers, (1) under counter sump pump and associated CW/sanitary piping on the 6th Floor as per…”
- Alteration, filed Feb 21, 2023, estimated cost $156K, described as “Modifications to the existing HVAC System: Installation of split system AC Unit and associated piping/ ductwork and controls on the 6th Floor as per plans (Modivcare - Interior Renovation.) No change to use, egress or occupancy.”
- Alteration, filed Feb 16, 2023, estimated cost $1.0M, described as “Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 6th Floor as per plans (Modivcare - Interior Renovation.) No change to use, egress or occupancy.”
- Alteration, filed Dec 16, 2021, estimated cost $75K, described as “Modifications to the existing HVAC system and installation of (3) AC Units and associated ductwork on the 17th and 34th Floors as per plans (LL Work - Dismissal of Violation #11727866P.) No change to use, egress or occupancy.”
- Alteration, filed Mar 23, 2021, estimated cost $123K, described as “Modifications to the existing Sprinkler System; Installation of (36) new sprinkler heads and associated piping as per plans (LL26 - LL Work/ Lobby.) No change to use, egress or occupancy.”
- Alteration, filed Feb 26, 2021, estimated cost $260K, described as “Minor demolition. Installation of new partitions, doors, suspended ceilings, flooring and finishes as per plans (LL Work - Prebuilt Suite.) No change to use, egress or occupancy.”
- Alteration, filed Feb 26, 2021, estimated cost $190K, described as “Modifications to the existing HVAC System and installation of new AC Unit as per plans (LL Work - Prebuild Suite.) No change to use, egress or occupancy.”
- Alteration, filed Feb 26, 2021, estimated cost $15K, described as “Installation of NEW plumbing fixtures: (1) sump pump, (1) Coffee maker, (1) dishwasher, (1) sink, (1) chiller, (1) funnel drain and associated cold water and sanitary piping as per plans (Prebuild Suite.) No change to use, egress or…”
- Alteration, filed Feb 26, 2021, estimated cost $16K, described as “Removal of (26) existing sprinkler heads and installation of (19) new sprinkler heads, (7) temporary heads and loop and associated sprinkler piping as per plans (LL Work - Prebuild Suite.) No change to use, egress or occupancy.”
- Alteration, filed Feb 19, 2021, estimated cost $15K, described as “Remove (1) existing pantry sink; Install NEW: (1) sump pump, (1) sink, (1) dishwasher, (1) Hot water heater, (1) coffee maker, (1) chiller and associated piping as per plans (Prebuild Suite.) No change to use, egress or occupancy.”
- Alteration, filed Feb 19, 2021, estimated cost $6K, described as “Remove (4) existing sprinkler heads; Relocate (3) existing sprinkler heads; Install (7) new sprinkler heads and associated piping as per plans (LL Work - Prebuild Suite.) No change to use, egress or occupancy.”
- Alteration, filed Feb 19, 2021, estimated cost $70K, described as “Modifications to the existing HVAC System as per plans (Pre Build Suite.) No change to use, egress or occupancy.”
- Alteration, filed Feb 19, 2021, estimated cost $290K, described as “Minor interior demolition of finishes and fixtures. Installation of new partitions, doors, suspended ceilings, flooring, finishes and windows as per plans (LL Work - Prebuilt Suite.) No change to use, egress or occupancy.”
- Alteration, filed Dec 21, 2020, estimated cost $70K, described as “Removal of (66) existing sprinkler heads, Install (17) temporary heads; Installation of (184) new sprinkler heads and associated piping as per plans (Prebuilt Suite, Core Toilets and Lobby Renovation.) No change to use, egress or occupancy.”
- Alteration, filed Dec 21, 2020, estimated cost $45K, described as “Installation of NEW Plumbing Fixtures: (2) Chillers, (1) Dishwasher, (1) Sink, (1) Sump pump, (1) Hot Water Heater, (1) Coffee Maker and (1) Funnel Drain and associated piping as per plans (LL Work - Prebuild Suite.) No change to use,…”
- Alteration, filed Dec 21, 2020, estimated cost $350K, described as “Minor demolition only as per plans No Change to use egress or occupancy.”
- Alteration, filed Dec 21, 2020, estimated cost $30K, described as “Modifications to the existing Sprinkler System: Install (49) new heads and associated piping and install (16) temporary heads and loop as per plans (LL Work - Prebuilt Suite.) No change to use, egress or occupancy.”
- Alteration, filed Dec 18, 2020, estimated cost $300K, described as “Modifications to the existing HVAC system and installation of new AC Units and ductwork as per plans (Prebuilt Suite, Core Bathrooms, Lobby Renovation.) No change to use, egress or occupancy.”
16 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $61,904,700
- 2026–27 tax
- $6,514,971
- Market value (city estimate)
- $137,566,000
- Taxable value
- $60,315,232
- Assessed land
- $11,745,000
- Assessed improvements
- $50,159,700
Tax breaks
- Abatement (city code CERP), through Mar 31, 2029, a $28,025 credit this tax year.
Zoning
C5-5: floor area ratio 25.37 built, above the 15.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NAVD88).