# 55 Water Street, Manhattan

Office Condominium · built 1973 · Block 32, Lot 7501.

On Umarelli: https://umarelli.org/nyc/1000327501/55-water-street

More construction in Financial District: https://umarelli.org/nyc/manhattan/financial-district.md

Every lot on block 32: https://umarelli.org/nyc/manhattan/32.md

## Building permits

- Alteration, filed Nov 2, 2026, estimated cost $40K, described as “Victoria's secret office - structural work associated with new layout sd per plans filed herewith.”
- Alteration, filed Oct 29, 2026, estimated cost $1.4M, described as “Victoria's Secret - Remove/install non load bearing partitions, flooring, ceilings, finishes and fixtures as per plans filed herewith. No change in egress, use or occupancy.”
- Alteration, filed Oct 27, 2026, estimated cost $182K, described as “Victoria's secret office. Sprinkler work associated with new layout for tenant as per plans filed herewith. No change in egress, use or occupancy.”
- Alteration, filed Oct 27, 2026, estimated cost $225K, described as “Victoria's secret office - mechanical work associated with new tenant layout as per plans filed herewith. No change to egress, use or occupancy.”
- Alteration, filed Oct 27, 2026, estimated cost $50K, described as “Victoria's secret office - plumbing work to accommodate new layout as per plans filed herewith. No change in egress, use or occupancy.”
- Alteration, filed Oct 20, 2026, estimated cost $100K, described as “Interior Renovation on 13th floor to create conference center”
- Alteration, filed Oct 14, 2026, estimated cost $2.0M, described as “Interior renovation on parts of 13th and 14th floors related to conference center.”
- Alteration, filed Sep 9, 2026, estimated cost $1.5M, described as “Interior Renovation and new demising wall on part of 1st floor”
- Alteration, filed Jul 1, 2026, estimated cost $336K, described as “Structural work including concrete repair.”
- Alteration, filed Mar 27, 2026, estimated cost $4.0M, described as “Interior alterations to the 10th and 11th floors to include General Construction work as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.”
- Alteration, filed Jan 12, 2026, estimated cost $10K, described as “Installation of a heavy duty sidewalk shed as per plans during general construction work. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter 33 of NYC building code of 2022.”
- Alteration, filed Dec 4, 2025, estimated cost $2.3M, described as “Removal and replacement of pavers at 3rd floor plaza and exterior stairs leading up at 1st-3rd.”
- Alteration, filed Nov 12, 2025, estimated cost $120K, described as “Plumbing modifications at 3rd floor plaza”
- Alteration, filed Nov 5, 2025, estimated cost $47K, described as “Removals and capping of plumbing fixtures throughout floor. Cut and cap of sprinkler heads and associated piping throughout the floor. Installation of temporary loop.”
- Alteration, filed Nov 5, 2025, estimated cost $31K, described as “Removals of ductwork, mechanical units and associated piping throughout the floor. Supply/return to be cut and capped at core.”
- Alteration, filed Nov 5, 2025, estimated cost $385K, described as “Interior removals of ceilings, partitions and finishes throughout the floor. Core and shell to remain”
- Alteration, filed Oct 30, 2025, estimated cost $268K, described as “Filing herewith plumbing drawings showing modification and installation of plumbing fixtures on the 32nd floor office space. No change in Use, Egress or Occupancy under this application.”
- Alteration, filed Oct 29, 2025, estimated cost $115K, described as “Filing herewith mechanical plans for office renovation work on the 32nd floor as per plans filed. No change in Use, Egress or Occupancy under this application.”
- Alteration, filed Oct 21, 2025, estimated cost $12K, described as “Filing herewith sprinkler drawings showing modification and relocations and related piping, on the 32nd floor. No change in Use, Egress or Occupancy under this application.”
- Alteration, filed Sep 29, 2025, estimated cost $1.5M, described as “Filing herewith architectural drawings, showing office renovations on the 32nd floor, as per plans submitted. No change in Use, Egress or Occupancy under this application.”
- No Work, filed Sep 16, 2025, described as “Temporary place of assembly for the annual tunnel to towers Pasta Dinner held on the ground level at 55 water street (in case of rain) Maximum attendees - 520”
- No Work, filed Sep 16, 2025, described as “Temporary place of assembly for the annual tunnel to towers Pasta Dinner held on the elevated acre”
- Alteration, filed Sep 12, 2025, estimated cost $927K, described as “Modification of structural steel”
- Alteration, filed Aug 11, 2025, estimated cost $1.2M, described as “The scope of this project is interior build-out of tenant space inlcuding demo of existing constructon, new construction and installation of partitions, floor and wall finishes, doors and light fixtures. No change in use, egress & occupancy”
- Alteration, filed Aug 7, 2025, estimated cost $17K, described as “Modification to sprinkler systems as shown on plans.”

167 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1000327501/55-water-street.

## Building history

- Alteration, filed Oct 15, 2019, permit issued - entire job/work, described as “Respectfully filing alt 1 application to establish a pa space on te 30TH fl as per plans filed herewith”
- Alteration, filed Jan 2, 2019, permit issued - entire job/work
- Alteration, filed Dec 17, 2018, plan exam - in process, described as “Renovation of 36TH fl at 55 water st of equipment rooms consisting of: to be (3)conference rooms,(1) multipurpose room, coffee bar, unisex restroom, storage room, relocation of equip room, connection corridor from office space to…”
- Alteration, filed Dec 6, 2018, plan exam - disapproved, described as “This project consists of the onsite assembly and installation of two (2) prefabricated agent booths for the hertz corp. In an existing parking garage at 55 water street. One 14' x 18' customer service / agent booth on parking level P1…”
- Alteration, filed Feb 1, 2017, permit issued - entire job/work
- Alteration, filed Jan 30, 2017, permit issued - entire job/work, described as “Increase occupancy on 20TH floor and creation of horizontal separation.”
- Alteration, filed Dec 30, 2014, signed off Dec 13, 2018
- Alteration, filed Mar 27, 2014, permit issued - entire job/work, described as “Requesting update in c/o description in light of hurricane sandy flooding, including the addition of new partitions.”
- Alteration, filed Jan 28, 2014, plan exam - disapproved, described as “Filing herewith to change inconsistencies with current certificate of occupancy (7/11/1986- no. 88880) on the following floor (SC3,SC2,SC1, cellar 1, 22 to 26 32,33,38 to 42). Remaining floors occupancy designations to be updated to 2008…”
- Alteration, filed Jul 1, 2013, permit issued - entire job/work, described as “Interior renovation associated with installtion of new fuel storage room/tank.”

The 10 most recent of 15 new buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $299,918,714
- 2026–27 Tax: $29,163,427
- Market value (city estimate): $666,486,002
- Taxable value: $268,564,563
- Assessed land: $65,250,014
- Assessed improvements: $234,668,700
- Condo units with their own tax lots: 54

## Zoning

C6-9: floor area ratio 22.11 built, above the 15.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 13 ft (NAVD88).

## Board and land use applications

- Water Street POPS Upgrades Text Amendment (City Planning P2014M0256): Completed, decided Jun 27, 2016. Zoning text amendment to the Special Lower Manhattan District and related sections to allow the infill of arcades for retail use and upgrades to existing plazas.
- 55 WATER STREET ARCADE (City Planning P2011M0212): Completed, decided Aug 18, 2011. CERT. TO ALLOW FOR NEW MOVEABLE OUTDOOR TABLES & CHAIRS IN\*THE EXIST ARCADE & ADJACENT PLAZA (POPS)
- EXISTING PEDESTRIAN TUNNEL (City Planning P1988M1015): Completed. 88-227M: RENEWAL OF REVOCABLE CONSENT FOR OPERATION AND USE OF AN EXISTING PEDESTRIAN TUNNEL UNDERNEATH VIETNAM VETERAN'S PLAZA.
- SELECT FITNESS CENTER (City Planning P1987M1005): Completed. 87-271M: PHYSICAL CULTURE ESTABLISHMENT ON 3RD FLOOR OF EXISTING BUILDING
- DOT HQ (City Planning P2006M0272): Completed, decided Apr 11, 2006. LEASE APPROX 426,000SF OF OFFICE SPACE FOR DOT
- 55 WATER ST ELEVATED PLAZA RENOVATN (City Planning P2004M0085): Completed, decided Jan 7, 2004
- 55 WATER ST (City Planning P2003M0300): Completed, decided Mar 14, 2003. CERT TO PERMIT THE ENCLOSURE OF OPEN SPACE TO ALLOW FOR\*SECURITY FOR THE TEACHER'S RETIREMENT SYSTEM FACILITY (POPS)
- SPECIAL LOWER MANHATTAN TEXT (City Planning P2001M0196): Completed, decided Dec 17, 2001. 01DCP020M: APPLICANT PROPOSES TO REPLACE AN EXISTING GNORTH TOWER AT 5 5 WATER STREET WITH A NEW TRADING FACILITY TO EXPAND ITS OPE RATIONS IN LOWER MANHATTAN
- C6-9 SIGNAGE TEXT (City Planning P2001M0152): Completed, decided Jun 21, 2001. 01DCP019M: ZONING TEXT AMENDMENT PERTAINING TO SIGNS IN C6-9 ZONING DIS TRICTS IN THE SPECIAL LOWER MANHATTAN DISTRICT
- VIETNAM VETERAN'S PEDESTRIAN TUNNEL (City Planning P1988M0201): Completed, decided Dec 1, 1988. RENEWAL OF CONSENT TO OPERATE & USE A PEDESTRIAN TUNNEL\*UNDERNEATH THE VETERAN'S PLAZA & CONNECTS TO THE ABOVE\*OFFICE BLDGS

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
