180 Maiden Lane, Manhattan
Commercial · built 1982 · Block 37, Lot 23.
Building permits
- Alteration, filed Oct 19, 2026, estimated cost $2.3M, described as “Modifications to the existing HVAC system on the 5th floor as per plans filed herewith. No change to use, egress or occupancy.”
- No Work, filed Oct 15, 2026, described as “The NYC Community Shakeout Run”
- Alteration, filed Oct 6, 2026, estimated cost $30K, described as “Sprinkler modifications on the 39th floor. No change in use, egress, or occupancy is involved.”
- No Work, filed Sep 4, 2026, described as “Fashion Exhibit”
- No Work, filed Sep 1, 2026, described as “Fashion show-Runway”
- Alteration, filed Jun 30, 2026, estimated cost $750K, described as “Interior Scope of Work Only: Non-Structural Partition Removal and Layout Changes. No Change In Use, Egress or Occupancy.”
- Alteration, filed Jun 16, 2026, estimated cost $36K, described as “Alteration of the existing VAV air distribution system and controls to service the newly partitioned space on the 6th floor, South side, phase 2. Refer to plans.”
- Alteration, filed Jun 11, 2026, estimated cost $41K, described as “Modification of the sprinkler branches and relocation of sprinkler heads to provide coverage in the newly partitioned spaces on the 6th floor, South side, phase 2. Refer to plans.”
- No Work, filed Mar 31, 2026, described as “Meeting to provide information on the school from the times requested.”
- No Work, filed Feb 11, 2026, described as “Temporary setup for Hair , Makeup, and Model dressing, and production. Separate TPA filed for 39th floor under application # M01355219”
- No Work, filed Feb 6, 2026, described as “FASHION SHOW WITH RUNWAY MODELS , Setup is 6am setup, guest arrive at 5pm fashion show is at 5:30pm, Show ends 5:45 PM. Guest depart 6pm. Break up evcnt to occur after guest depart.”
- No Work, filed Jan 28, 2026, described as “41st Floor Event.”
- No Work, filed Nov 17, 2025, described as “Art exhbit-scuplters”
- No Work, filed Oct 29, 2025, described as “The NYC Community Shakeout Run”
- No Work, filed Oct 29, 2025, described as “Halloween party no drinking and eating establishment.”
- No Work, filed Oct 16, 2025, described as “Community Event- Charity Bake sale”
- Alteration, filed Oct 3, 2025, estimated cost $30K, described as “Structural modifications taking place on the 30th and 31st Floor as per plans filed herewith. No change in Use, Egress or Occupancy.”
- Alteration, filed Sep 26, 2025, estimated cost $65K, described as “General Construction taking place on the 39th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.”
- No Work, filed Sep 24, 2025, described as “Book Fair”
- Alteration, filed Sep 22, 2025, estimated cost $83K, described as “General Construction taking place on the 41st Floor as per plans filed herewith. No change in Use, Egress or Occupancy.”
- Alteration, filed Sep 18, 2025, estimated cost $40K, described as “General Construction taking place on the 11th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.”
- No Work, filed Sep 5, 2025, described as “Exhibit and public viewing”
- Alteration, filed Aug 13, 2025, estimated cost $175K, described as “General Construction taking place on the 4th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.”
- Alteration, filed Aug 11, 2025, estimated cost $55K, described as “Plumbing modifications taking place on the 6th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.”
- Alteration, filed Aug 11, 2025, estimated cost $48K, described as “Mechanical modifications taking place on the 6th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.”
96 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $123,000,000
- 2026–27 Tax
- $13,090,232
- Market value (city estimate)
- $273,333,300
- Taxable value
- $120,669,547
- Assessed land
- $27,720,000
- Assessed improvements
- $95,280,000
Zoning
C5-3: floor area ratio 23.06 built, above the 15.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 12 ft (NAVD88).
Recent sales
- Jul 3, 2024: $297,000,000
Open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- DOI Offices - 180 Maiden Lane (City Planning P2017M0112): Completed, decided Nov 16, 2016. Acquisition of office space at 180 Maiden Lane for use by the Department of Investigation.
- Water Street POPS Upgrades Text Amendment (City Planning P2014M0256): Completed, decided Jun 27, 2016. Zoning text amendment to the Special Lower Manhattan District and related sections to allow the infill of arcades for retail use and upgrades to existing plazas.
- 180 Maiden Lane Redesign (City Planning P2014M0239): Completed, decided Dec 4, 2015. Design changes to the indoor public space at 180 Maiden Lane that is governed by lot improvements of the former Special Manhattan Landing Development District.
- CONTINENTAL CENTER PLAZA (City Planning P1992M0363): Completed, decided Mar 26, 1992. CERTIF TO REDUCE THE NUMBER OF LARGE TREES FROM 22 TO 16,*THUS INCREASING THE NUMBER OF PUBLIC SEATING & A POSSIBLE*LINKING OF BOTH AREAS OF THE INTERIOR PLAZA, IN THE SPECIAL*MANHATTAN LANDING DISTRICT (BLOCK 37 LOTS 19-49) (POPS)
- CONTINENTAL CENTER (City Planning P1986M0006): Completed, decided Jul 13, 1989. 1ST MODIFICATION FOR AN ENCLOSED PEDESTRIAN SPACE (POPS)
- CONTINENTAL CENTER (City Planning P1986M0003): Completed, decided May 24, 1989. 1ST MODIF OF 790066ZCM FOR AN ENCLOSED PEDESTRIAN SPACE