# 70 Pine Street, Manhattan

Condominium · 612 units · built c. 1932 · Block 41, Lot 7504.

On Umarelli: https://umarelli.org/nyc/1000417504/70-pine-street

More construction in Financial District: https://umarelli.org/nyc/manhattan/financial-district.md

Every lot on block 41: https://umarelli.org/nyc/manhattan/41.md

## Building permits

- Alteration, filed Aug 7, 2026, estimated cost $40K, described as “General construction to include interior renovation of existing space (unit 2911).”
- Alteration, filed Oct 23, 2024, estimated cost $3K, described as “Installation of a temporarily supported scaffold and working platform per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 20, 2024, described as “Facade restoration project”
- Alteration, filed Oct 7, 2024, described as “Facade restoration”
- Alteration, filed Mar 2, 2024, described as “Faade Inspection & Leak Investigation”
- Alteration, filed Nov 29, 2023, described as “Adding platform”
- Alteration, filed Feb 9, 2023, described as “Installation of temporary pipe scaffold as per plan. No change in use,egress or occupancy.”
- Alteration, filed Dec 21, 2022, estimated cost $3.2M, described as “Facade repairs as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Oct 9, 2022, estimated cost $5K, described as “Installation of 300 psf sidewalk shed per plans. Sidewalk shed shall comply with chapter #33 of the 2014 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Jul 20, 2022, estimated cost $76K, described as “Installation of new PL fixtures in 2nd floor as per plans”
- Alteration, filed Nov 30, 2020, estimated cost $30K, described as “New mechanical duct layout, new diffusers and chilled water units as per plans.”
- Alteration, filed Nov 19, 2020, estimated cost $39K, described as “Installation of new plumbing fixtures as per plans”
- Alteration, filed Nov 19, 2020, estimated cost $13K, described as “Modify exiting sprinkler system within area of work as indicated on plans.”
- Alteration, filed Nov 17, 2020, estimated cost $210K, described as “1. Steam to Hydronic Conversion for domestic hot water generation. 2. Install new water to water heat exchangers, pumps and accessories.”
- Alteration, filed Nov 17, 2020, estimated cost $1.3M, described as “1.Steam to Hydronic Conversion Space Heating. 2.New water-water heat exchangers, pumps, access., 3.Remove steam coils & assoc. piping, valves,&controls. 4.New hydronic & electric fan coil heating units in BAS,1ST FL. 5. New HW risers to…”
- Alteration, filed Oct 9, 2020, estimated cost $30K, described as “Provide new roughing for new fixtures inc; 2wc's. 2lav's, 7sk's, 1dishwasher, 2icemakers. & 10 fd's. Work also inc 1 new elec hwh. Complete installation w/ fixtures & trim.”
- Alteration, filed Jan 2, 2020, estimated cost $60K, described as “Removal and installation of HVAC ductwork. Installation of ac units. No change in use, occupancy or egress.”
- Alteration, filed Dec 9, 2019, estimated cost $60K, described as “Installation of plumbing fixtures and related piping. Install new sprinkler heads and related piping. Filing as per drawings herewith no change in use, egress or occupancy.”
- No Work, filed May 2, 2019
- Alteration, filed Aug 1, 2018, described as “Non illuminated non advertising double face projecting accessory sign - blue park kitchen. No change of use, egress or occupancy.”

## Property taxes

- Assessment: $130,643,550
- 2026–27 tax: $13,475,882
- Market value (city estimate): $290,319,000
- Taxable value: $118,638,236
- Assessed land: $15,480,000
- Assessed improvements: $115,163,550
- Condo units with their own tax lots: 4

## Zoning

C5-5: floor area ratio 30.76 built, above the 15.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of Cities Service Building: Individual Landmark, Cities Service Building, First Floor Interior (Interior Landmark). 26 Landmarks Preservation Commission permits are on file.

## Board and land use applications

- Variance or special permit (Board of Standards and Appeals 2016-4135-BZ): Variance or special permit, Granted, filed Mar 11, 2016, decided Aug 23, 2016. Special Permit (§73-36) to permit the operation of a physical culture establishment (La Palestra) in portions of the basement and sub-cellar levels of an existing building. C5-5 (LM) zoning district.
- 70 PINE ST ROOFTOP RECREATION (City Planning P2012M0512): Completed, decided Dec 18, 2012. Chairperson Certification to modify the required amount of rooftop recreation open space in connection with the conversion fo the building to residential use.
- CITIES SERVICE BLDG 1ST FL INTERIOR (City Planning P2011M0216): Completed, decided Sep 13, 2011. LANDMARK SITE & LP 2442