120 Broadway, Manhattan
Office condominium · built c. 1915 · Block 47, Lot 7501.
Building permits
- Alteration, filed Aug 27, 2026, estimated cost $99K, described as “Sprinkler work on the 4th floor to add 205 sprinkler heads”
- Alteration, filed Jul 24, 2026, estimated cost $96K, described as “Plumbing work on the 10th floor (Bitfarms prebuilt) as indicated on drawings.”
- Alteration, filed Jul 23, 2026, estimated cost $44K, described as “Sprinkler work on the 10th floor (Bitfarms prebuilt) as indicated on drawings.”
- Alteration, filed Jul 23, 2026, estimated cost $336K, described as “Mechanical work on the 10th floor (Bitfarms prebuilt) as indicated on drawings.”
- Alteration, filed Jul 23, 2026, estimated cost $1.4M, described as “Construction work on the 10th floor (Bitfarms prebuilt) as indicated on drawings.”
- Alteration, filed May 27, 2026, estimated cost $19K, described as “Plumbing work on the 33rd floor (Alliance for Downtown) as indicated on drawings.”
- Alteration, filed May 27, 2026, estimated cost $618K, described as “Construction work on the 33rd floor (Alliance for Downtown) as indicated on drawings.”
- Alteration, filed May 27, 2026, estimated cost $17K, described as “Sprinkler work on the 33rd floor (Alliance for Downtown) as indicated on drawings.”
- Alteration, filed May 27, 2026, estimated cost $60K, described as “Mechanical work on the 33rdf floor (Alliance for Downtown) as indicated on drawings.”
- Alteration, filed Apr 15, 2026, estimated cost $826K, described as “Filing herewith for facade repairs. There is no change to use, egress, or occyupancy.”
- No Work, filed Nov 4, 2025, described as “Beyer Blinder Belle - Architectural League Mentoring Series”
- Alteration, filed Jun 12, 2025, estimated cost $296K, described as “Facade restoration. No change in egress, use or occupancy.”
- Alteration, filed Jun 3, 2025, described as “Installation of suspended scaffold for facade work or inspection. Amend #1, added overhang and ctwt calc.”
- Alteration, filed May 21, 2025, estimated cost $20K, described as “Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Dec 6, 2024, estimated cost $16K, described as “Mechanical work on the basement level (TRC) as indicated on drawings.”
- Alteration, filed Dec 6, 2024, estimated cost $84K, described as “Construction work on the basement level (TRC) as indicated on drawings.”
- Alteration, filed Dec 6, 2024, estimated cost $14K, described as “Sprinkler work on the basement level (TRC) as indicated on drawings.”
- Alteration, filed Aug 26, 2024, estimated cost $125K, described as “Sprinkler work on the 29th floor; temporary sprinkler loop (Ekimetrics and restrooms) as indicated on drawings”
- Alteration, filed Aug 26, 2024, estimated cost $360K, described as “Mechanical work on the 29th floor (Ekimetrics and restrooms) as indicated on drawings.”
- Alteration, filed Aug 26, 2024, estimated cost $1.7M, described as “Construction work on the 29th floor (Ekimetrics, public corridor, core restrooms) as indicated on drawings.”
- Alteration, filed Aug 26, 2024, estimated cost $81K, described as “Plumbing work on the 29th floor (Ekimetrics and restrooms) as indicated on drawings.”
- Alteration, filed Aug 21, 2024, estimated cost $12K, described as “In-kind replacement (1) traine 6.0 ton horizontal , ceiling mounted water cooling heat pump unit.”
- Alteration, filed Aug 7, 2024, estimated cost $40K, described as “Replace one (1) fuel storage tank and one (1) fuel storage day-tank as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jun 10, 2024, estimated cost $130K, described as “Reconfiguration of condenser air duct path. No change to use, occupancy or egress”
- Alteration, filed Apr 17, 2024, estimated cost $42K, described as “Sprinkler work on the 34th floor (Studio Gang) as indicated on drawings”
186 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $166,058,026
- 2026–27 tax
- $15,730,697
- Market value (city estimate)
- $369,017,840
- Taxable value
- $148,938,952
- Assessed land
- $31,346,999
- Assessed improvements
- $134,711,027
- Condo units with their own tax lots
- 6
Zoning
C5-5: floor area ratio 30.07 built, above the 15.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Mar 27, 2024: $52,695,173, Unit C
Open-market sales since 2016, from the Department of Finance’s sales files.
Landmarks
Part of Equitable Building (Individual Landmark). 50 Landmarks Preservation Commission permits are on file.
Board and land use applications
- 120 Broadway DCP (City Planning P2015M0309): Completed, decided Feb 10, 2015. Notice of Intent by DCAS to aquire office space at 120 Broadway for use by the Department of City Planning.
- TEMPLE COURT BLDG & ANNEX (City Planning P1998M0238): Completed, decided May 18, 1998. LANDMARK-CITY COLLEGE OF NY, REMSEN CEMETERY,TROTTING*COURSE LA; Additional LPC #(s): 415
- EQUITABLE BLDG (City Planning P1997M0009): Completed, decided Oct 1, 1996. LANDMARK-CITY COLLEGE OF NY, REMSEN CEMETERY,TROTTING*COURSE LA; Additional LPC #(s): 536
- EQUITABLE TOWER, (City Planning P1985M0453): Completed, decided Feb 25, 1986. CONSENT TO CONSTRUCT, MAINTAIN & USE 1 STREET LAMP &*ELECTRICAL CONDUITS ON & UNDER THE SIDEWALK
In the news
Ekimetrics Relocates US Headquarters to 120 Broadway in Manhattan’s Financial District, New York YIMBY, Apr 27, 2024.