# 120 Broadway, Manhattan

Office condominium · built c. 1915 · Block 47, Lot 7501.

On Umarelli: https://umarelli.org/nyc/1000477501/120-broadway

More construction in Financial District: https://umarelli.org/nyc/manhattan/financial-district.md

## Building permits

- Alteration, filed Aug 27, 2026, estimated cost $99K, described as “Sprinkler work on the 4th floor to add 205 sprinkler heads”
- Alteration, filed Jul 24, 2026, estimated cost $96K, described as “Plumbing work on the 10th floor (Bitfarms prebuilt) as indicated on drawings.”
- Alteration, filed Jul 23, 2026, estimated cost $44K, described as “Sprinkler work on the 10th floor (Bitfarms prebuilt) as indicated on drawings.”
- Alteration, filed Jul 23, 2026, estimated cost $336K, described as “Mechanical work on the 10th floor (Bitfarms prebuilt) as indicated on drawings.”
- Alteration, filed Jul 23, 2026, estimated cost $1.4M, described as “Construction work on the 10th floor (Bitfarms prebuilt) as indicated on drawings.”
- Alteration, filed May 27, 2026, estimated cost $19K, described as “Plumbing work on the 33rd floor (Alliance for Downtown) as indicated on drawings.”
- Alteration, filed May 27, 2026, estimated cost $618K, described as “Construction work on the 33rd floor (Alliance for Downtown) as indicated on drawings.”
- Alteration, filed May 27, 2026, estimated cost $17K, described as “Sprinkler work on the 33rd floor (Alliance for Downtown) as indicated on drawings.”
- Alteration, filed May 27, 2026, estimated cost $60K, described as “Mechanical work on the 33rdf floor (Alliance for Downtown) as indicated on drawings.”
- Alteration, filed Apr 15, 2026, estimated cost $826K, described as “Filing herewith for facade repairs. There is no change to use, egress, or occyupancy.”
- No Work, filed Nov 4, 2025, described as “Beyer Blinder Belle - Architectural League Mentoring Series”
- Alteration, filed Jun 12, 2025, estimated cost $296K, described as “Facade restoration. No change in egress, use or occupancy.”
- Alteration, filed Jun 3, 2025, described as “Installation of suspended scaffold for facade work or inspection. Amend #1, added overhang and ctwt calc.”
- Alteration, filed May 21, 2025, estimated cost $20K, described as “Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Dec 6, 2024, estimated cost $16K, described as “Mechanical work on the basement level (TRC) as indicated on drawings.”
- Alteration, filed Dec 6, 2024, estimated cost $84K, described as “Construction work on the basement level (TRC) as indicated on drawings.”
- Alteration, filed Dec 6, 2024, estimated cost $14K, described as “Sprinkler work on the basement level (TRC) as indicated on drawings.”
- Alteration, filed Aug 26, 2024, estimated cost $125K, described as “Sprinkler work on the 29th floor; temporary sprinkler loop (Ekimetrics and restrooms) as indicated on drawings”
- Alteration, filed Aug 26, 2024, estimated cost $360K, described as “Mechanical work on the 29th floor (Ekimetrics and restrooms) as indicated on drawings.”
- Alteration, filed Aug 26, 2024, estimated cost $1.7M, described as “Construction work on the 29th floor (Ekimetrics, public corridor, core restrooms) as indicated on drawings.”
- Alteration, filed Aug 26, 2024, estimated cost $81K, described as “Plumbing work on the 29th floor (Ekimetrics and restrooms) as indicated on drawings.”
- Alteration, filed Aug 21, 2024, estimated cost $12K, described as “In-kind replacement (1) traine 6.0 ton horizontal , ceiling mounted water cooling heat pump unit.”
- Alteration, filed Aug 7, 2024, estimated cost $40K, described as “Replace one (1) fuel storage tank and one (1) fuel storage day-tank as per plans. No change in use, egress or occupancy.”
- Alteration, filed Jun 10, 2024, estimated cost $130K, described as “Reconfiguration of condenser air duct path. No change to use, occupancy or egress”
- Alteration, filed Apr 17, 2024, estimated cost $42K, described as “Sprinkler work on the 34th floor (Studio Gang) as indicated on drawings”

186 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1000477501/120-broadway.

## Property taxes

- Assessment: $166,058,026
- 2026–27 tax: $15,730,697
- Market value (city estimate): $369,017,840
- Taxable value: $148,938,952
- Assessed land: $31,346,999
- Assessed improvements: $134,711,027
- Condo units with their own tax lots: 6

## Zoning

C5-5: floor area ratio 30.07 built, above the 15.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Mar 27, 2024: $52,695,173, Unit C

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of Equitable Building (Individual Landmark). 50 Landmarks Preservation Commission permits are on file.

## Board and land use applications

- 120 Broadway DCP (City Planning P2015M0309): Completed, decided Feb 10, 2015. Notice of Intent by DCAS to aquire office space at 120 Broadway for use by the Department of City Planning.
- TEMPLE COURT BLDG & ANNEX (City Planning P1998M0238): Completed, decided May 18, 1998. LANDMARK-CITY COLLEGE OF NY, REMSEN CEMETERY,TROTTING\*COURSE LA; Additional LPC #(s): 415
- EQUITABLE BLDG (City Planning P1997M0009): Completed, decided Oct 1, 1996. LANDMARK-CITY COLLEGE OF NY, REMSEN CEMETERY,TROTTING\*COURSE LA; Additional LPC #(s): 536
- EQUITABLE TOWER, (City Planning P1985M0453): Completed, decided Feb 25, 1986. CONSENT TO CONSTRUCT, MAINTAIN & USE 1 STREET LAMP &\*ELECTRICAL CONDUITS ON & UNDER THE SIDEWALK

## In the news

[Ekimetrics Relocates US Headquarters to 120 Broadway in Manhattan’s Financial District](https://newyorkyimby.com/2024/04/ekimetrics-relocates-us-headquarters-to-120-broadway-in-manhattans-financial-district.html), New York YIMBY, Apr 27, 2024.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
