# 140 Broadway, Manhattan

Commercial · built 1968 · Block 48, Lot 1.

On Umarelli: https://umarelli.org/nyc/1000480001/140-broadway

More construction in Financial District: https://umarelli.org/nyc/manhattan/financial-district.md

Every lot on block 48: https://umarelli.org/nyc/manhattan/48.md

## Building permits

- No Work, filed Nov 6, 2026, described as “This activity is to gather architects and people around the business to share the projects and current activities of Arup in the construction space.”
- Alteration, filed Aug 19, 2026, estimated cost $200K, described as “Minor construction work on the sub-cellar1 level (Crunch Fidi) as indicated on drawings.”
- Alteration, filed Aug 12, 2026, estimated cost $390K, described as “New PVC Station to feed existing systems on the subcellar level. No modifications to existing loads or systems. No change to use egress or occupancy.”
- Alteration, filed Jul 8, 2026, estimated cost $275K, described as “INterior demolition of nonload bearing partitions, fixtures, finishes on floors 26, 27.”
- Alteration, filed Jul 7, 2026, estimated cost $125K, described as “Removal and installation of interior non bearing partitions and related finishes on 46th floor”
- Alteration, filed Jul 1, 2026, estimated cost $125K, described as “Removal and installation of interior non bearing partitions and related finishes as per plans filed for 41st floor.”
- Alteration, filed Jun 11, 2026, estimated cost $125K, described as “Interior demolition of non-load bearing partitions, finishes, fixtures for 40th floor”
- Alteration, filed Jun 5, 2026, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Apr 15, 2026, estimated cost $174K, described as “Interior modifications to interior partitions for Suite 2270”
- Alteration, filed Jan 9, 2026, estimated cost $700K, described as “Interior renovations Suites 4530 & 4540”
- Alteration, filed Jan 7, 2026, estimated cost $50K, described as “Modifications to pantry area in suite 4510”
- Alteration, filed Nov 20, 2025, estimated cost $6K, described as “Interior renovation of the existing retail store. Erectinga 16' tall 1HR fire rated wall. No changes to use group,occupancy and egres”
- Alteration, filed Oct 23, 2025, estimated cost $466K, described as “Interior alterations to space 2410, minor partition work, new finishes & fixtures.”
- Alteration, filed Sep 22, 2025, estimated cost $5K, described as “Erect, maintain & dismantle of heavy duty sidewalk shed per drawings attached herewith.”
- Alteration, filed Sep 11, 2025, estimated cost $7.1M, described as “Interior renovation including partitions, finishes internal structural stair spanning (3) floors).”
- Alteration, filed Aug 21, 2025, estimated cost $1.9M, described as “Interior renovation of existing office space”
- Alteration, filed Aug 20, 2025, estimated cost $80K, described as “Structural filing as per plans. Light gauge steel platform, and structural steel countertop. No change in use, egress or occupancy.”
- Alteration, filed Aug 20, 2025, estimated cost $340K, described as “Mechanical fiing as per plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 20, 2025, estimated cost $77K, described as “Plumbing/sprinkler filing as per plans. No change in use, egress or occupancy.”
- Alteration, filed Aug 18, 2025, estimated cost $512K, described as “Engineering new floor openings for new interfloor staircases, engineer interfloor staircases and engineer structural support for modernfold type Folding partition.”
- Alteration, filed Aug 18, 2025, estimated cost $2.5M, described as “Modification to existing ductwork and installation of AC units as per plans filed herewith. 15,16,17,18 Construction vs 17,18,19 & 20 Marketing”
- Alteration, filed Aug 18, 2025, estimated cost $881K, described as “Installation of new pantries, wellness rooms, shower rooms and restrooms. Installation of sprinkler heads as per plans filed herewith.”
- Alteration, filed Aug 18, 2025, estimated cost $16.5M, described as “Interior office fit out of 15th through 18th floors including open office, private offices, restroomrenovation, new unisex powder rooms, wellness rooms, conference rooms, non cooking break rooms, sound lab, conference rooms, waiting /…”
- Alteration, filed Jun 3, 2025, estimated cost $150K, described as “Interior renovations to Suite 2310 (Imre), minor partition work”
- Alteration, filed Apr 2, 2025, estimated cost $20K, described as “Demolition of core bathrooms on floors 17 through 20”

123 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1000480001/140-broadway.

## Property taxes

- Assessment: $135,099,450
- 2026–27 tax: $14,628,836
- Market value (city estimate): $300,221,000
- Taxable value: $134,870,430
- Assessed land: $23,670,000
- Assessed improvements: $111,429,450

## Tax breaks

- Abatement (city code CERP), through Dec 31, 2027, a $1,908 credit this tax year.

## Zoning

C5-5: floor area ratio 21.68 built, above the 15.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of 140 Broadway, Originally the Marine Midland Bank Building (Individual Landmark). 50 Landmarks Preservation Commission permits are on file.

## Board and land use applications

- Variance or special permit (Board of Standards and Appeals 2016-4470-BZ): Variance or special permit, Granted, filed Dec 22, 2016, decided Jun 20, 2017. Special Permit (§73-36) to operate a physical culture establishment (Crunch Fitness) within an existing building. C5-5 (Lower Manhattan Special District) within the Marine Midland Bank Building (New York City Landmark).
- 140 Broadway Landmark (City Planning P2014M0030): Landmark designation, Completed, decided Sep 30, 2013. LPC designation of 140 Broadway (f/k/a the Marine Midland Bank Building).
- 140 BROADWAY POPS BIKE SHARE (City Planning P2012M0611): Completed, decided Aug 21, 2012. Chairperson certification for design changes to an existing plaza at 140 Broadway to allow for a bike share docking station.
- NY TIMES BLDG (City Planning P1999M0317): Completed, decided Jun 14, 1999. LANDMARK-CITY COLLEGE OF NY, REMSEN CEMETERY,TROTTING\*COURSE LA; Additional LPC #(s): 440

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology