## Building permits

- Alteration, filed Nov 17, 2026, described as “Facade inspection”
- Alteration, filed Jun 10, 2026, estimated cost $4K, described as “Installation of temporary betamax hoist as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 20, 2026, estimated cost $10K, described as “Filing herewith for emergency parapet demolition.”
- Alteration, filed Apr 16, 2026, estimated cost $23K, described as “Installation of pipe scaffold as per plans. Pipe scaffold shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Feb 9, 2026, described as “Installation of suspended scaffold for facade work or inspection.”
- Alteration, filed Aug 21, 2025, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Jun 24, 2022, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed May 11, 2022, estimated cost $20K, described as “Installation of temporary work platform per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Apr 21, 2022, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Apr 15, 2022, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Feb 22, 2022, estimated cost $5.5M, described as “Structural modifications in cellar, basement, floors 1-14, mez 1, roof as per plans filed herewith. no change in use, egress or occupancy.”
- Alteration, filed Feb 9, 2022, estimated cost $401K, described as “Fuel oil piping and associated generator work in basement, cellar, floors 1 to 7 as per plans filed herewith. no changes in use, egress or occupancy.”
- Alteration, filed Feb 9, 2022, estimated cost $12.3M, described as “Mechanical modifications in cellar, basement, floors 1-14, mez 1, roof as per plans filed herewith. no changes in use, egress or occupancy.”
- Alteration, filed Feb 8, 2022, estimated cost $1.6M, described as “Sprinkler and standpipe modifications in cellar, basement, floors 1-14, mez 1, roof as per plans filed herewith. no changes in use, egress or occupancy.”
- Alteration, filed Feb 8, 2022, estimated cost $3.7M, described as “Plumbing modifications in cellar, basement, floors 1-14, mez 1, roof as per plans filed herewith. no changes in use, egress or occupancy.”
- Alteration, filed Dec 10, 2021, estimated cost $2.5M, described as “Structural modifications in Bas, Floors 1-14, Mez 1 associated with slab and framing removals as per plans filed herewith. no changes in use, egress or occupancy.”
- Alteration, filed Nov 29, 2021, estimated cost $250K, described as “General construction in Cel, Bas, Floors 1-14, Mez 1, Roof as per plans filed herewith. no changes in use, egress or occupancy.”
- Alteration, filed Oct 12, 2021, estimated cost $119K, described as “Mechanical modifications associated with rooftop unit removals on 7th floor, roof and OSP as per plans filed herewith. no changes in use, egress or occupancy.”
- Alteration, filed Oct 12, 2021, estimated cost $22K, described as “Structural modifications on 7th floor and roof as per plans filed herewith. no changes in use, egress or occupancy.”
- Alteration, filed Oct 11, 2021, estimated cost $98K, described as “General construction on 7th floor and roof as per plans filed herewith. no changes in use, egress or occupancy.”
- Alteration, filed Sep 27, 2021, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Aug 10, 2021, estimated cost $37.9M, described as “General construction and ALT-1 change of use on floors indicated, and change in zoning floor area with addition of single dwelling unit as per plans filed herewith.”
- Alteration, filed Jul 1, 2021, estimated cost $30K, described as “Modifications to temp dry standpipe on floors cellar, 1-12, 14-15, 1st Floor Mezzanine, 2nd Floor Mezzanine and Roof as per plans filed herewith. No changes in use, egress or occupancy.”
- Alteration, filed Apr 13, 2021, estimated cost $606K, described as “Mechanical modifications in cellar, floors 1 thru 12, floors 15, Roof, 1st floor BoH mezzanine, and 2nd floor mezzanine, as per plans filed herewith. No changes in use, egress or occupancy.”
- Alteration, filed Apr 13, 2021, estimated cost $16K, described as “Sprinkler and standpipe modifications in cellar, floors 1 thru 12, floors 15, Roof, 1st floor BoH mezzanine, and 2nd floor mezzanine, as per plans filed herewith. No changes in use, egress or occupancy.”

7 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1000510013/86-trinity-place.

## Property taxes

- Assessment: $10,176,750
- 2026–27 tax: $1,103,974
- Market value (city estimate): $22,615,000
- Taxable value: $10,176,750
- Assessed land: $5,265,000
- Assessed improvements: $4,911,750

## Zoning

C5-5: floor area ratio 6.78 built, 15.00 allowed by base zoning.

## Recent sales

- Oct 18, 2021: $155,000,000

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of New York Curb Exchange (Incorporating The New York Curb Market Building), Later Known As The American Stock Exchange (Individual Landmark). 16 Landmarks Preservation Commission permits are on file.

## Board and land use applications

- NY CURB EXCHANGE BUILDING (City Planning P2013M0015): Landmark designation, Completed, decided Sep 29, 2012. LPC designation of the New York Curb Exchange Building.