# 112 Trinity Place, Manhattan

Commercial · built 1978 · Block 52, Lot 30.

On Umarelli: https://umarelli.org/nyc/1000520030/112-trinity-place

More construction in Financial District: https://umarelli.org/nyc/manhattan/financial-district.md

Every lot on block 52: https://umarelli.org/nyc/manhattan/52.md

## Building permits

- Alteration, filed Jun 17, 2022, estimated cost $20K, described as “AT&T - Replacement of existing antennas with replacement and removal of RRH units on roof. Retrofit of cabinets and removal of RRH units on existing platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or…”
- Alteration, filed Oct 14, 2021, estimated cost $20K, described as “Reinforcement/modification of existing equipment platform on roof. No change to occupancy, use, or egress.”
- Alteration, filed Aug 24, 2021, estimated cost $8K, described as “Installation of temporary construction equipment- pipe scaffold for facade repair work as per plan. No change in use egress or occupancy,pipe scaffold shall comply with CHAPTER#33 of 2014 the ny building code.”
- Alteration, filed Apr 28, 2021, estimated cost $17K, described as “AT&T - Installation, relocation and replacement of existing antennas on roof. Relocation of existing RRH. Installation of new cabinet on existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupancy,…”
- Alteration, filed Jun 2, 2020, estimated cost $1K, described as “Installation of sidewalk in accordance with nycc 2014 chapter 33 building code. No change in egress, use, or occupancy.”
- Alteration, filed Apr 17, 2019, estimated cost $15K, described as “AT&T - Replacement of existing antennas, existing RRH units, and installation of new RRH units on the roof. Retrofit of existing cabinet on the existing equipment platform on the roof. All work in compliance with TPPN 5/98. No change to…”
- Alteration, filed Oct 30, 2018, estimated cost $9K, described as “Modification to existing Verizon telecommunications site. Replace 8 antennas on roof. Reduce canopy size and related canopy deck to comply with FDNY. All in conformance with TPPN 5/98. No change in use, egress, or occupancy.”
- Alteration, filed Aug 22, 2018, estimated cost $2K, described as “Modification to existing verizon telecommunications site. Installation of (2) antennas mounted on the existing building facade. All in conformance with tppn 5/98. No change in use, egress or occupancy.”

## Property taxes

- Assessment: $1,196,550
- 2026–27 tax: $123,267
- Market value (city estimate): $2,659,000
- Taxable value: $1,136,310
- Assessed land: $477,000
- Assessed improvements: $719,550

## Zoning

C5-5: floor area ratio 5.00 built, 15.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- BURGER KING (City Planning P1981M1108): Completed, decided Jun 11, 1981. CONST ENCLOSED SIDEWALK CAFE

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
