110 Greenwich Street, Manhattan
Apartment Building · 60 units · built c. 1929 · Block 53, Lot 33.
Building permits
- Alteration, filed Sep 3, 2026, estimated cost $35K, described as “Removal of ceiling in retail space and installation of one partition.”
- Alteration, filed Aug 20, 2025, estimated cost $160K, described as “Closure of lot line windows and installation of split system air conditioning as required to solve violation 039157202R.”
- Alteration, filed Nov 27, 2024, estimated cost $6K, described as “File to install two illuminated aluminum channel letter signs on aluminum raceway on wall for existing 1ST floor commercial space. No change to use, egress, or occupancy.”
- Alteration, filed Jun 7, 2024, described as “Suspended scaffold outrigger system at 110 greenwich street, manhattan for inspection.”
- Alteration, filed Apr 29, 2024, estimated cost $250K, described as “General construction for limited exterior repairs at all facades as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Feb 27, 2024, estimated cost $5K, described as “Heavy duty sidewalk shed during bldg alteration, filed sep. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Nov 18, 2019, estimated cost $12K, described as “New 5 ton mini split system serving public corridor and lobby. no change in use, egress or occupancy.”
- Alteration, filed Oct 4, 2018, estimated cost $20K, described as “Installation of heavy duty sidewalk shed during building alteration, filed separately. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application”
Building history
- Alteration, filed Dec 9, 2020, permit issued - entire job/work, units 60 to 61, described as “Amend cofo for changes of number of dwelling units on 12TH and 13TH floor. In add, change descript of 1ST fl apt from super's apt to a class "a" apt.no work to be completed. Correct inconsistency in descript at cel - sup office changed to…”
- Alteration, filed Apr 15, 2016, plan exam - approved, units 60 to 68, stories 13 to 14, described as “Change use at portions of cellar and first floor to retail use, renovate and reconfigure apartment layouts on floors 9-13, and one story vertical enlargement.”
- Major Renovation — Conversion, filed Jul 24, 1997, signed off Jun 20, 2006, 60 units added, 13 stories, described as “Application filed herewith to convert th e existing use of this building as shown on plans and to enlarg e said building from an existing nine story building to a twelve story bu ilding. Obtain new certificate of occupancy.”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $9,182,250
- 2026–27 Tax
- $1,017,244
- Market value (city estimate)
- $20,405,000
- Taxable value
- $8,177,860
- Assessed land
- $1,098,000
- Assessed improvements
- $8,084,250
Zoning
C6-9: floor area ratio 9.52 built, 15.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NAVD88).
Board and land use applications
- Variance or Special Permit (Board of Standards and Appeals 207-01-BZ): Variance or Special Permit, Granted, filed Jun 7, 2001, decided May 7, 2002. Special Permit (§73-36) to permit the legalization of an existing physical culture establishment, located within portions of the cellar and first floor of a 13-story mixed use building in a C6-9 zoning district.