## Building permits

- Alteration, filed Nov 3, 2026, estimated cost $299K, described as “Filing herewith for the addition/modification to an existing sprinkler system as shown on plans. There will be no change of use, occupancy or egress under this application.”
- Alteration, filed Oct 30, 2026, estimated cost $5.5M, described as “Filing herewith for non-structural interior demolition and interior renovation as shown on plans. No change to use, egress, or occupancy under this application”
- Alteration, filed Oct 26, 2026, estimated cost $576K, described as “Interior demo of partitions, ceilings and doors for existing office space. No change in use, egress or occupancy.”
- Alteration, filed Oct 21, 2026, estimated cost $5K, described as “Use of Knuckleboom for installing sidewalk structures”
- Alteration, filed Sep 15, 2026, estimated cost $412K, described as “General Construction as shown on plans filed herewith. no change to use, egress or occupancy.”
- Alteration, filed Sep 10, 2026, estimated cost $2K, described as “Construction fence as per drawings. Construction fence shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Aug 7, 2026, estimated cost $3.2M, described as “General construction as shown on plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Aug 7, 2026, estimated cost $8.2M, described as “General construction as shown on plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Aug 7, 2026, estimated cost $500K, described as “General construction work associated with new PA space on the 3rd floor, as shown on plans filed herewith, and to obtain an amended Certificate of Occupancy.”
- Alteration, filed Jul 8, 2026, estimated cost $267K, described as “General construction as shown on plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Jun 12, 2026, estimated cost $18K, described as “Filing herewith interior renovation on existing 28th floor, AON. No change in use egress or occupancy.”
- Alteration, filed Jun 5, 2026, estimated cost $157K, described as “Interior demolition as shown on plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed May 21, 2026, estimated cost $207K, described as “General Construction as shown on plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Apr 29, 2026, estimated cost $45K, described as “General Construction as shown on plans filed herewith. No change to use, egress or occupancy.”
- No Work, filed Apr 13, 2026, described as “Cocktail reception for invited guests only, with pre-packaged food and beverage served.”
- Alteration, filed Dec 28, 2025, estimated cost $14.1M, described as “General construction filed for removal and replacement of existing window glazing and sash within existing window openings on floors 3-14, 16-39, and 41-43, as shown on plans herewith. No change in use, egress or occupancy.”
- Alteration, filed Dec 28, 2025, estimated cost $6.0M, described as “General construction filed for removal and replacement of existing window glazing and sash within existing window openings on floors 44-53, as shown on plans herewith. No change in use, egress or occupancy.”
- Alteration, filed Apr 29, 2025, estimated cost $170K, described as “General Construction as shown on plans”
- Alteration, filed Sep 13, 2024, estimated cost $254K, described as “Plumbing/sprinkler modification as shown on plans”
- Alteration, filed Sep 13, 2024, estimated cost $244K, described as “Mechanical modifications as shown on plans.”
- Alteration, filed Sep 10, 2024, estimated cost $2.6M, described as “Interior renovation as shown on plans. There is no change in egress use or occupancy.”
- Alteration, filed Aug 13, 2024, estimated cost $75K, described as “Temporary overhead protection during bldg alt, filed sep. Overhead protection shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Aug 5, 2024, estimated cost $30K, described as “Installation of temporary sprinkler loop on the 1ST & 2ND floors. No change to use, egress and/or occupancy.”
- Alteration, filed Jul 29, 2024, estimated cost $25K, described as “Construction fence as per drawings. Construction fence shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Jul 22, 2024, estimated cost $15K, described as “Temporary ramp as per drawings. Ramp shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”

89 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1000627501/1-liberty-plaza.

## Building history

- Alteration, filed Sep 6, 2018, permit issued - entire job/work, described as “Change of occupancy of existing commercial space. Work being filed to building horizontal exit partition and up occupant load at 2ND floor and 2ND floor mezzanine”
- Alteration, filed Aug 21, 2018, permit issued - entire job/work, described as “Alteration 1 application filed herewith to establish a pa space on the 11TH &amp; 14TH floor and increase occupancy as per plans filed herewith.”
- Alteration, filed Feb 12, 2018, permit issued - entire job/work
- Alteration, filed Jan 19, 2012, signed off Nov 24, 2014, described as “No work filing to correct occupant load at 5TH floor. Number of persons reverting to 375 as previously approved”
- Alteration, filed Aug 9, 2011, permit issued - entire job/work, described as “Application is filed to change use on the 38TH and 39TH floors as per plans filed herewith. Minor work on the 38TH floor. All other work performed under application #'s 120447864 (38TH floor) and 120533351 (39TH floor).”
- Alteration, filed Mar 31, 2011, plan exam - disapproved, described as “No work to be performed. Application is filed to change use on the 38TH and 39TH floors as per plans filed herewith. Work performed under application #'s 120447864 (38TH floor) and 120533351 (39TH floor).”
- Alteration, filed May 16, 2008, permit issued - entire job/work, described as “Filing herewith to amend the c of o to reflect the addition of two pa's to the 7TH floor and the removal of offices. No work filed under this application.”
- Alteration, filed Jun 15, 2007, permit issued - entire job/work, described as “Application filed for No Work to amend the CO to establish F-4 Eating and Drinking Establishment use on 1st floor. Obtain amended CO.”
- Alteration, filed Apr 29, 2003, signed off Jan 7, 2005, described as “Filed to consolidate four pending alt.1 applications previously filed to amend this buildings c of o no work bei n performed under this adnubustrative application alt.1 100325612/101587392/ 1 01116695/ alt.1390/89. Obtain amended c of o.”
- Alteration, filed Jun 5, 1998, permit issued - entire job/work, described as “No work application filed herewith to indicate new meeting room (f-1B) at 18TH floor as shown on plans filed herewith. Obtain amended certificate of occupancy.”

The 10 most recent of 14 new buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $270,514,354
- 2026–27 Tax: $28,137,919
- Market value (city estimate): $601,143,000
- Taxable value: $259,120,713
- Assessed land: $69,750,003
- Assessed improvements: $200,764,351
- Condo units with their own tax lots: 17

## Zoning

C5-5: floor area ratio 17.73 built, above the 15.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## In the news

[One Liberty Plaza Unveils Lobby Art Installation At 165 Broadway In Financial District, Manhattan](https://newyorkyimby.com/2026/02/one-liberty-plaza-unveils-lobby-art-installation-at-165-broadway-in-financial-district-manhattan.html), New York YIMBY, Feb 1, 2026.