185 Broadway, Manhattan
Condominium · 209 units · built 2019 · Block 63, Lot 7501.
Building permits
- Alteration, filed Jan 17, 2026, estimated cost $25K, described as “Sprinkler modifications taking place on 2ND floor as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Dec 31, 2025, estimated cost $340K, described as “General construction taking place on 2ND floor as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Dec 26, 2025, estimated cost $20K, described as “Plumbing modifications on 2ND floor as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Dec 26, 2025, estimated cost $15K, described as “Mechanical modifications on 2ND floor as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Aug 19, 2025, estimated cost $225K, described as “Minor demolition with installation of new partitions, doors, ceilings and finishes on the 3rd floor (Pre-build) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Aug 19, 2025, estimated cost $135K, described as “Modifications to the existing HVAC system on the 3rd floor (Pre-build) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Aug 19, 2025, estimated cost $15K, described as “Modifications to the existing sprinkler system on the 3rd floor (Pre-build Suite) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Aug 19, 2025, estimated cost $10K, described as “Modifications to the existing plumbing system on the 3rd floor (Pre-build) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Apr 8, 2024, estimated cost $22K, described as “Modifications to the existing Sprinkler System: Install (1) new sprinkler head, Relocate (21) existing sprinkler heads and remove (1) sprinkler head and associated piping on the 1st Floor as per plans (T-Mobile.) No change to use, egress…”
- Alteration, filed Apr 4, 2024, described as “Non-illuminated non-advertising double-face projecting accessory sign - t. No change of use, egress or occupancy.”
- Alteration, filed Apr 4, 2024, estimated cost $1K, described as “Non-illuminated non-advertising accessory wall sign - t mobile. No change of use, egress or occupancy.”
- Alteration, filed Feb 21, 2024, estimated cost $53K, described as “Modifications to the existing HVAC System; Relocate and extend ductwork, install new controls, exhaust fans and transfer grills on the 1st Floor as per plans (T-Mobile Retail Store.) No change to use, egress or occupancy.”
- Alteration, filed Sep 28, 2023, estimated cost $30K, described as “Install new plumbing fixtures: (1) water closet, (1) lavatory, (1) floor drain, (2) sinks, (1) HWH, (1) water dispenser and associated CW/sanitary/vent piping on the 1st Floor as per plans (T-Mobile Retail Store.) No change to use, egress…”
- Alteration, filed Sep 28, 2023, estimated cost $139K, described as “Minor interior demo; Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 1st Floor as per plans (T-Mobile Retail.) No change to use, egress or occupancy.”
- Alteration, filed Dec 19, 2022, estimated cost $880, described as “Erect accessory business wall sign for wells fargo, no change in use, egress or occupancy.”
- Alteration, filed Oct 25, 2022, estimated cost $30K, described as “Sprinkler modifications and associated piping for interior tenant fit-out (wells fargo retail tenant). There will be no change in use, egress, or occupancy.”
- Alteration, filed Oct 25, 2022, estimated cost $95K, described as “HVAC modifications and associated ductwork as per plans. There will be no change in use, egress, or occupancy”
- Alteration, filed Oct 25, 2022, estimated cost $25K, described as “Plumbing modifications and new fixtures with associate piping as per plans. There will be no change in use, egress, or occupancy.”
- Alteration, filed Oct 24, 2022, estimated cost $275K, described as “Installation of interior non-load bearing partitions and related finishes for interior tenant fit-out including a structural beam for new folding wall. There will be no change in use, egress, or occupancy.”
- Alteration, filed Oct 13, 2022, estimated cost $60K, described as “Herewith filing sprinkler work at 1st floor demised retail/bank space.”
- Alteration, filed Oct 13, 2022, estimated cost $50K, described as “Herewith filing plumbing work at 1st floor retail / bank demised spaces.”
- Alteration, filed May 20, 2022, estimated cost $5K, described as “Installation of supported pipe scaffold as shown on plans”
- Alteration, filed Jan 24, 2022, estimated cost $38K, described as “Modificatons to existing sprinkler system on the 2ND floor.”
- Alteration, filed Dec 10, 2021, estimated cost $20K, described as “Installation of new gas-fired fireplace with associated ducts and an exhaust fan. All Structural details, supports and gas lines filed in NB application # 121188703. No change in use group, egress and occupancy.”
- Alteration, filed Nov 9, 2021, estimated cost $135K, described as “Installation of a new HVAC system on the 2nd floor (One Medical) as per plans. No change to use, egress or occupancy.”
11 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $49,315,185
- 2026–27 tax
- $1,082,784
- Market value (city estimate)
- $109,589,300
- Taxable value
- $8,957,256
- Assessed land
- $2,645,100
- Assessed improvements
- $46,670,085
- Condo units with their own tax lots
- 3
Tax breaks
- 421-a exemption, through Jun 30, 2057, about $4,911,765 a year below the full tax.
Zoning
C5-5: floor area ratio 87.93 built, above the 15.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- May 27, 2026: $30,500,000, Apt 1
- May 27, 2026: $190,000,000, Apt 3
Open-market sales since 2016, from the Department of Finance’s sales files.
In the news
7 Dey Street Completes Construction in Financial District, Manhattan, New York YIMBY, May 30, 2022.