170 Broadway, Manhattan
Condominium · built c. 1903 · Block 64, Lot 7502.
Building permits
- Alteration, filed May 6, 2024, estimated cost $84K, described as “Installation of new Dish Wireless telecom site. Installation of 3 sectors (3 antennas) with associated parts, 6 RRH units, 1 GPS antenna, and 1 equipment platform with related cabinet. Related conduits on facade and service connection in…”
- Alteration, filed Jun 28, 2023, estimated cost $35K, described as “Filing plumbing work to reflect new fixtures as per plans filed. No change to use, egress or occupancy.”
- Alteration, filed Jun 28, 2023, estimated cost $250K, described as “Filing to reflect general alteration in the 3RD floor lobby. No change to use, egress or occupancy.”
- Alteration, filed May 4, 2023, estimated cost $500, described as “Replacement face only for non illuminated non advertising accessory sign on entrance marquee filed under application #122064023 - residence inn by marriott - no change to use, egress, or occupancy”
- Alteration, filed May 4, 2023, estimated cost $750, described as “Non-illuminated non-advertising double-face projecting accessory banner sign - residence inn by marriott. No change of use, egress or occupancy.”
- Alteration, filed May 4, 2023, estimated cost $500, described as “Replacement face - non-illuminated non-advertising accessory sign on marquee permitted under job # 122064023 - residence inn by marriott. No change of use, egress or occupancy.”
- Alteration, filed May 4, 2023, estimated cost $750, described as “Non illuminated non advertising double face projecting accessory banner sign - residence inn by marriott - no change to use, egress, or occupancy”
- Alteration, filed Mar 28, 2022, estimated cost $3K, described as “Reface existing non-illuminated wall sign & d/f blade sign for gap factory.”
- Alteration, filed Mar 28, 2022, estimated cost $3K, described as “Reface existing wall sign for gap factory.”
- Alteration, filed May 6, 2019, estimated cost $5K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed May 31, 2018, described as “Installation of heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 7, 2018, described as “Installation of temporary sidewalk shed and scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jan 11, 2018, estimated cost $77K, described as “Installation of telecommunications cabinets, related dunnage, and related antennas on roof. Installation of related antennas on facade. Installation of RRH units on 1st floor Mezzanine. All work in compliance with TPPN 5/98. No change to…”
Property taxes
- Assessment
- $34,109,100
- 2026–27 tax
- $2,932,969
- Market value (city estimate)
- $75,798,000
- Taxable value
- $30,623,019
- Assessed land
- $3,289,500
- Assessed improvements
- $30,819,600
- Condo units with their own tax lots
- 2
Zoning
C5-5: floor area ratio 16.38 built, above the 15.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Appeal (Board of Standards and Appeals 186-11-A): Appeal, Granted, filed Dec 8, 2011, decided Feb 28, 2012. Application pursuant to Multiple Dwelling Law ("MDL") Section 310(2)(a) to waive the court and yard requirements of MDL Section 26 to facilitate the conversion of an existing office building to a transient hotel. C5-5/LM zoning district.