# 15 Maiden Lane, Manhattan

Commercial · built c. 1908 · Block 65, Lot 7.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/1000650007/15-maiden-lane

More construction in Financial District: https://umarelli.org/nyc/manhattan/financial-district.md

Every lot on block 65: https://umarelli.org/nyc/manhattan/65.md

## Building permits

- Alteration, filed May 21, 2025, described as “Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.”
- Alteration, filed Sep 15, 2023, estimated cost $475, described as “Install exterior non-illuminated wall sign (flagstar)”
- Alteration, filed Sep 6, 2023, estimated cost $11K, described as “Install storefront awnings with no copy. No change in use, egress or occupancy.”
- Alteration, filed Aug 15, 2023, estimated cost $77K, described as “Installation of 22 ton capacity split system on floor 003 and roof (6TH floor level). No change to egress, use, or occupancy.”
- Alteration, filed Mar 16, 2023, estimated cost $20K, described as “Demolition of Existing Partitions, Doors, Suspended Ceiling Tiles (Ceiling Grid to Remain), Millwork, Carpet & Wall Base on Part of 3rd Floor. No Change To Occupancy, Use or Egress is Proposed”
- Alteration, filed Nov 18, 2021, estimated cost $21K, described as “Replacement of existing rtu with new rtu with a total capacity fo 6 tons. No change to egress, use, or occupancy.”
- Alteration, filed May 27, 2021, estimated cost $5K, described as “Installation of two 275 Gal Fuel Oil Storage Tanks (In conjunction with Job Number: M00502701-I1 and Miscellanies 151/80))”
- Alteration, filed May 25, 2021, estimated cost $5K, described as “Diesel generator set installation (in conjunction with job #M00501923-I1 and miscellanies 151/80)”
- Alteration, filed Oct 3, 2019, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 26, 2018, estimated cost $475, described as “Non illuminated non advertising accessory wall sign - q b tokyo house. No change to use, egress or occupancy.”
- Alteration, filed May 4, 2018, described as “Installation of heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Oct 30, 2017, described as “Installation of heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.”

## Property taxes

- Assessment: $9,994,950
- 2026–27 Tax: $1,028,412
- Market value (city estimate): $22,211,000
- Taxable value: $9,994,950
- Assessed land: $2,038,500
- Assessed improvements: $7,956,450

## Tax breaks

- Abatement (City Code CERP), through May 31, 2031, a $55,840 credit this tax year.

## Zoning

C5-5: floor area ratio 13.78 built, 15.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
