# 180 Water Street, Manhattan

Apartment Building · 573 units · built 1971 · Block 70, Lot 32.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/1000700032/180-water-street

More construction in Financial District: https://umarelli.org/nyc/manhattan/financial-district.md

Every lot on block 70: https://umarelli.org/nyc/manhattan/70.md

## Building permits

- Alteration, filed Jun 9, 2026, estimated cost $954K, described as “Filed herewith to renovate existing lobby to include millwork and new finishes.”
- Alteration, filed Mar 28, 2024, described as “Installation of outriggers for facade repair and inspection”
- Alteration, filed Mar 19, 2024, estimated cost $5K, described as “Installation of 300PSF sidewalk shed as per plans. Sidewalk shed shall comply with chapter #33 of the NYC building code 2022. No change in use, occupancy, or egress under this application.”
- Alteration, filed Dec 7, 2022, estimated cost $5K, described as “Installation of structural steel framing for proposed air curtain as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Dec 6, 2022, estimated cost $16K, described as “Filing herewith installation of proposed air curtain in vestibule of ground floor commercial space.”
- Alteration, filed Nov 8, 2022, estimated cost $70K, described as “Interior renovation of existing ground floor commercial space as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Oct 27, 2022, estimated cost $26K, described as “General construction as shown on plans. No change in use, egress or occupancy. Related applications filed under PL #M00677434-I1 & SP #M00677439-I1.”
- Alteration, filed Apr 11, 2022, estimated cost $13K, described as “Modifications to existing plumbing system and related piping as shown on plans. No change in use, egress or occupancy. Related applications filed under GC #M00672849-I1 & SP #M00677439-I1.”
- Alteration, filed Mar 23, 2022, estimated cost $13K, described as “Additions/modifications to an existing sprinkler system as shown on plans. No change in use, egress or occupancy. Related applications filed under GC # M00672849 & PL #M00677434.”
- Alteration, filed Nov 4, 2021, estimated cost $30K, described as “New plumbing fixtures & sprinkler heads at ground floor per plans. No change of use, egress or occupancy.”
- Alteration, filed Oct 20, 2021, estimated cost $30K, described as “Structural work as shown on plans. No change in use, egress or occupancy.”
- Alteration, filed Oct 1, 2021, estimated cost $1K, described as “Install non-illuminated sign for gopuff not within view of arterial highway or public park 1/2 acre or more. No change in use egress or occupancy.”
- Alteration, filed Sep 9, 2021, estimated cost $75K, described as “Interior fit out of existing commercial space, new mechanical diffusers with associated ductwork.”
- Alteration, filed Jun 16, 2020, estimated cost $10K, described as “Installation of a temporary construction fence filed herewith. no change in use, no change in egress, no change in occupancy.”
- Alteration, filed Jun 12, 2020, estimated cost $27K, described as “AT&T - Replacement of existing antennas with installation of RRH units on roof. Replacement and retrofit of cabinets on existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.”
- Alteration, filed Jan 30, 2020, estimated cost $775, described as “Non illuminated non advertising accessory wall sign - citi bank. No change to use, egress or occupancy.”
- Alteration, filed Jan 30, 2020, estimated cost $775, described as “Non illuminated non advertising accessory wall sign - citi bank. No change to use, egress or occupancy.”
- Alteration, filed Jan 15, 2020, estimated cost $50K, described as “Structural modifications as per plans filed herewith. No change in use, occupancy or egress.”
- Alteration, filed Jan 13, 2020, estimated cost $100K, described as “Modification to sprinkler and plumbing systems as per plans filed herewith. No change in use, occupancy or egress.”
- Alteration, filed Jan 13, 2020, estimated cost $250K, described as “Modification to mechanical systems as per plans filed herewith. No change in use, occupancy or egress.”
- Alteration, filed Sep 19, 2019, estimated cost $60K, described as “Modification of existing sprinkler system to add coverage for mezzanine in conjunction w/OT #123818725.”
- Alteration, filed Aug 28, 2019, estimated cost $150K, described as “Application filed for mezzanine and 2nd floor framing;”
- Alteration, filed Aug 22, 2019, estimated cost $3K, described as “Modification of existing sprinkler distribution piping, new sprinkler heads in new finished area. No change in use, egress or occupancy.”
- Alteration, filed Aug 21, 2019, estimated cost $69K, described as “Modifications to existing mechanical systems. No change in use, egress or occupancy.”
- Alteration, filed Jun 14, 2018, estimated cost $17K, described as “AT&T / Replacement of existing RRH units on roof. Removal and installation of equipment cabinets in the existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.”

## Building history

- Major Renovation — Conversion, filed Jan 22, 2015, permit issued - entire job/work, 581 units added, 29 stories
- Alteration, filed Jul 26, 2004, signed off Aug 3, 2005, described as “This is a no work application filed for offices and a conference room on the 12th floor, as indicated on the attached Schedule A. All work filed under applications 101857135.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $79,393,050
- 2026–27 Tax: $9,138,539
- Market value (city estimate): $176,429,000
- Taxable value: $73,466,830
- Assessed land: $12,735,000
- Assessed improvements: $66,658,050

## Zoning

C5-5: floor area ratio 20.72 built, above the 15.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 12 ft (NAVD88).

## Board and land use applications

- Water Street POPS Upgrades Text Amendment (City Planning P2014M0256): Completed, decided Jun 27, 2016. Zoning text amendment to the Special Lower Manhattan District and related sections to allow the infill of arcades for retail use and upgrades to existing plazas.
- LOWER MANHATTAN ARCADES TEXT (City Planning P2011M0115): Completed, decided May 16, 2011. 11DCP075M: TEXT AMENDMENT TO ALLOW MOVEABLE TABLES AND CHAIRS IN ARCADE S NEARBY TO WATER STREET
- HRA OFFICES (City Planning P1997M0306): Completed, decided Apr 10, 1997. LEASE OF A 28-STORY BLDG APPRX 446,00SF TO CONSOLIDATE\*HRA'S EXECUTIVE STAFF & CENTRAL ADMINISTRATIVE OFFICES

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
