151 Maiden Lane, Manhattan
Hotel · built 2016 · Block 72, Lot 7.
Building permits
- Alteration, filed Jun 2, 2025, estimated cost $315K, described as “Interior renovation to existing retail space to be used as Eating and Drinking Establishment with less than 74 ppl, following the 2022 AC 28-118.3, and therefore the CO is not required to be amended. No change in egress or occupancy.”
- Alteration, filed Mar 6, 2025, described as “IRA to assist with Condition Assessment.”
- Alteration, filed Oct 4, 2018, described as “Installation of pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Sep 4, 2018, estimated cost $425, described as “Install non-illuminated sign on existing marquee (ac hotel downtown)”
- Alteration, filed Jan 18, 2018, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
Property taxes
- Assessment
- $21,356,100
- 2026–27 tax
- $2,013,318
- Market value (city estimate)
- $47,458,000
- Taxable value
- $18,559,350
- Assessed land
- $1,327,050
- Assessed improvements
- $20,029,050
Zoning
C5-3: floor area ratio 20.88 built, above the 15.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 12 ft (NAVD88).