Building permits
- Alteration, filed Sep 14, 2026, described as “Suspended Scaffold for Facade Restoration as Shown Plans”
- Alteration, filed Aug 6, 2026, estimated cost $15K, described as “Application filed for temporary shoring to support beams per plans filed herewith. Filed in conjunction with Alt CO M01084591.”
- Alteration, filed Jan 13, 2026, estimated cost $1K, described as “Installation of temporary needle beam as per plans. No change in use, egress or occupancy shall comply with CHAPTER#33 of 2022 the ny building code.”
- Alteration, filed Nov 19, 2025, estimated cost $1K, described as “This application is filed for a Temporary Use Permit for a sales office including model apartments on the 9th floor pursuant to section AC 28-111 and Buildings Bulletin 2010-002. Filed in conjunction with ALT-CO #M01084591.”
- Alteration, filed Oct 16, 2025, estimated cost $75K, described as “Filing herewith for rerouting of existing Fuel Oil Piping to existing generator. Fuel Oil Tank is existing”
- Alteration, filed Oct 8, 2025, estimated cost $1K, described as “Installation of a material only hoist as per drawings. Hoist shall comply with ch #33 of the NYC bldg code. No change in use, occupancy or egress under this application.”
- Alteration, filed Jun 18, 2025, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Jun 5, 2025, estimated cost $1K, described as “Construction of temporary 2-hr rated corridor during construction.”
- Alteration, filed May 15, 2025, estimated cost $26K, described as “Installation of 7000 lb dual personnel/material hoist car as per plans during construction. Hoist shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed May 14, 2025, estimated cost $1K, described as “Installation of temporary roof protection as per plans. No change in use, egress or occupancy shall comply with CHAPTER#33 of 2022 the ny building code.”
- Alteration, filed Apr 27, 2025, estimated cost $4K, described as “Installation of 2000 lbs temporary beta max hoist as per plan. No change in use, egress, or occupancy. The beta max material hoist inside the building from the cellar to the first floor.”
- Alteration, filed Apr 16, 2025, estimated cost $14K, described as “Installation of single-dual personnel/material hoist car as per plans during construction. Hoist shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Apr 8, 2025, estimated cost $95K, described as “Replace existing retail AC unit with new AC unit. Provide new OA ventilation fan and return air fan”
- Alteration, filed Mar 26, 2025, estimated cost $1K, described as “Installation of temporary construction fence as per plans. No change in use, occupancy or egress.”
- Alteration, filed Mar 19, 2025, estimated cost $8K, described as “Installation of pipe scaffolding as per plans. Pipe scaffolding shall comply with chapter # 33 of the 2022 code, no changess in use in egress or occupancy under this application.”
- Alteration, filed Mar 3, 2025, described as “Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.”
- Alteration, filed Feb 6, 2025, estimated cost $1K, described as “Installation of temporary working platform as per plans. No change in use, egress or occupancy shall comply with CHAPTER#33 of 2022 the ny building code.”
- Alteration, filed Feb 5, 2025, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Jan 24, 2025, estimated cost $2K, described as “Erect non-illuminated accessory business wall signs on ann street elevation for zara”
- Alteration, filed Jan 22, 2025, estimated cost $2K, described as “Erect non-illuminated accessory business signs on broadway for zara.”
- Alteration, filed Aug 27, 2024, estimated cost $2.4M, described as “Interior demolition including removal of all non-structural interior partitions, furring and finishes.”
- Alteration, filed Aug 26, 2024, estimated cost $1.6M, described as “Structural demolition including slab openings, mechanical bulkhead, and cooling tower enclosure”
- Alteration, filed Aug 19, 2024, estimated cost $5.3M, described as “New window installation and panel modifications”
- Major Renovation — Conversion, filed Aug 7, 2024, estimated cost $60.8M, 788 units added, 32 stories, described as “Alteration and conversion of existing commercial building to residential. Facade work filed separately under Job #M01094011. Partial demo filed separately under Job #M01094125-I1.”
- Alteration, filed Jul 31, 2024, estimated cost $261K, described as “Partial facade masonry removal”
24 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $98,695,625
- 2026–27 tax
- $12,218,377
- Market value (city estimate)
- $219,323,611
- Taxable value
- $98,226,357
- Assessed land
- $20,250,000
- Assessed improvements
- $78,445,625
Zoning
C5-5: floor area ratio 22.86 built, above the 15.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Apr 18, 2024: $147,500,000
Open-market sales since 2016, from the Department of Finance’s sales files.