161 William, Manhattan
Office condominium · built 1951 · Block 92, Lot 7502.
Building permits
- Alteration, filed Jun 2, 2023, estimated cost $38K, described as “Concrete encasement for fireproofing”
- Alteration, filed May 25, 2023, estimated cost $58K, described as “Emergency work. Install structural tiebacks along western wall of 161 William Street on floors 1-5. Work done under emergency conditions due to collapse of adjacent building (57 Ann Street)”
- Alteration, filed May 18, 2023, estimated cost $75K, described as “Mechanical work during renovation on 6th floor”
- Alteration, filed May 18, 2023, estimated cost $120K, described as “Sprinkler work during renovation on 2nd & 3rd floors”
- Alteration, filed May 18, 2023, estimated cost $30K, described as “Plumbing work during renovation on 6th floor”
- Alteration, filed May 18, 2023, estimated cost $150K, described as “Plumbing work during renovation on 2nd & 3rd floors”
- Alteration, filed May 18, 2023, estimated cost $650K, described as “Mechanical work during renovation on 2nd & 3rd floors”
- Alteration, filed May 18, 2023, estimated cost $20K, described as “Installation of temporary sprinkler loop. during renovation on 2nd & 3rd floors”
- Alteration, filed May 18, 2023, estimated cost $75K, described as “Sprinkler work during renovation on 6th floor”
- Alteration, filed Apr 24, 2023, estimated cost $150K, described as “Interior demolition and construction for PACE on 6th floor”
- Alteration, filed Apr 24, 2023, estimated cost $750K, described as “Interior renovation on 2nd and 3rd floors.”
- Alteration, filed Apr 24, 2023, estimated cost $150K, described as “ALT-CO application filed to change the use of second and third floors, at 161 William Street, to a new educational occupancy.”
- Alteration, filed Dec 1, 2022, estimated cost $97K, described as “General construction work and change in occupancy from classroom to offices on 1st floor.”
- Alteration, filed Dec 1, 2022, estimated cost $467K, described as “Mechanical work on 1st floor”
- Alteration, filed Dec 1, 2022, estimated cost $20K, described as “Sprinkler work on 1st floor”
- Alteration, filed Dec 1, 2022, estimated cost $51K, described as “Plumbing work on 1st floor”
- Alteration, filed Dec 1, 2022, estimated cost $267K, described as “General construction work on 1st floor.”
- Alteration, filed Aug 8, 2022, estimated cost $278K, described as “Modification to plumbing fixtures and proposed new sprinkler system for the 9th floor and 16 floor, all as per plan. No change to Use, occupancy or egress.”
- Alteration, filed Aug 8, 2022, estimated cost $260K, described as “Proposed modification to the 9th floor layout, all as per plan. No change of use, occupancy or use.”
- Alteration, filed Aug 8, 2022, estimated cost $225K, described as “Proposed ducts and piping installation for the 9th and 16th floors for existing HVAC unit, all as per plan. No change of use, occupancy or egress.”
- Alteration, filed Jul 22, 2022, estimated cost $116K, described as “Proposed interior alterations within 4th and 6th floors. No change to use, occupancy or egress.”
- Alteration, filed Jul 22, 2022, estimated cost $80K, described as “Modification of existing HVAC ducts on 4th and 6th floors. No changes to use, occupancy or egress.”
- Alteration, filed Jul 22, 2022, estimated cost $56K, described as “Proposed modification of existing sprinkler system on 4th and 6th floor. Proposed Plumbing fixtures on 4th and 6th floor. No change of Occupancy, use or egress.”
- Alteration, filed Feb 23, 2022, estimated cost $325, described as “Non illuminated non advertising double sided projecting banner sign - pace university. No change of use, egress or occupancy.”
- Alteration, filed Feb 23, 2022, estimated cost $2K, described as “Non illuminated non advertising double sided projecting banner sign - pace university. No change of use, egress or occupancy.”
28 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $28,632,870
- Market value (city estimate)
- $63,628,600
- Taxable value
- $0
- Assessed land
- $5,400,000
- Assessed improvements
- $23,232,870
- Condo units with their own tax lots
- 22
Tax breaks
- Nonprofit exemption (college or university), with no end date, about $3,106,094 a year below the full tax.
Zoning
C6-4: floor area ratio 14.09 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Sep 30, 2021: $4,620,099, Apt CU9
- Apr 14, 2021: $10,578,394, Apt CU7, sold with other lots
Open-market sales since 2016, from the Department of Finance’s sales files.