# 204 Front Street, Manhattan

Commercial · built 1983 · Block 96, Lot 5.

On Umarelli: https://umarelli.org/nyc/1000960005/204-front-street

More construction in Seaport: https://umarelli.org/nyc/manhattan/seaport.md

Every lot on block 96: https://umarelli.org/nyc/manhattan/96.md

## Building permits

- Alteration, filed Aug 5, 2026, estimated cost $75K, described as “General construction work taking place on 1ST and 2ND floors as per plans filed herewith. No change in use, egress, or occupancy.”
- No Work, filed May 28, 2026
- Alteration, filed Mar 11, 2026, estimated cost $260K, described as “New vrf air conditioning units, outside air fan, t.e.fan, kef& muaf, including all associated ductwork and piping distribution systems, complete with controls, as specified on the project plans, gc filed under # M01287211,pl&spk under#…”
- Alteration, filed Mar 11, 2026, estimated cost $166K, described as “Job filed for the PL work associated with the interior renovation filed under DOB job# M01287211 &mechanical job #M01354125, new kitchen, new bathrooms& new three bars. Modify the existing spk system for the restaurant, No change of Use,…”
- Alteration, filed Mar 9, 2026, estimated cost $488K, described as “Filed for interior cosmetic work to the eating & drinking facility at the 1ST fl & 2ND fl, change of use has been filed under sep alt-1 application # M01243576-I1 by the landlord. No change of use, egress, or occupancy under this…”
- Alteration, filed Nov 3, 2025, estimated cost $10K, described as “This application is for structural modifications to create opening for staircase, openings in masonry wall and installation of lintels.”
- Alteration, filed Sep 15, 2025, estimated cost $16K, described as “Herewith Filing Alt CO for change in use/occupancy at 1st + 2nd floor in conjunction with a new eating and drinking establishment at 21-25 Fulton Street; part of the Museum Block Building (12 buildings on lots 5, 8 & 12 with single current…”
- Alteration, filed Feb 23, 2023, estimated cost $2K, described as “Non illuminated non advertising accessory wall sign - inside property line - a.a. Thomson & co. No change to use, egress, or occupancy.”
- Alteration, filed Oct 13, 2022, estimated cost $1K, described as “Installation of steel pipe scaffolding as per plans. No change to egress, use, or occupancy.”
- No Work, filed Jun 2, 2022
- Alteration, filed Feb 2, 2021, estimated cost $54K, described as “Installation of a temporary sprinkler loop system as per plans submitted herewith. No change in use, egress or occupancy group.”
- Alteration, filed Oct 28, 2020, estimated cost $5K, described as “Installation of heavy duty sidewalk shed during bldg. Alteration, filed sep. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. Shed shall be installed on roadway, dot…”
- Alteration, filed Oct 28, 2020, estimated cost $3K, described as “Installation of scaffold stair towers as per drawings. Stair towers shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Oct 28, 2020, estimated cost $4K, described as “Installation of plywood fence as per drawings. Plywood fence shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application. Fence shall be installed on sidewalk/roadway. Dot permits by…”
- Alteration, filed Jul 1, 2020, estimated cost $27K, described as “Plumbing fixtures on 1ST floor. No change to use, occupancy or egress.”
- Alteration, filed Mar 31, 2020, estimated cost $3K, described as “Installation of scaffold as per drawings. Scaffold shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Mar 31, 2020, estimated cost $5K, described as “Installation of heavy duty sidewalk shed during bldg alt, filed separately. Sidewalk shed shall comply with ch #33 of the NYC bldg code. No change in use, occupancy or egress under this appl. Shed to be installed on sw / rdwy. Dot permits…”
- Alteration, filed Mar 31, 2020, estimated cost $4K, described as “Installation of plywood fence as per drawings. Plywood fence shall comply with chapter #33 of the NYC bldg code. No change in use, occupancy or egress under this application. Fence to be installed on sw / rdwy. Dot permits by others.”
- Alteration, filed Jan 13, 2020, estimated cost $895K, described as “Modification to existing HVAC, units, ductwork and all associated piping.”
- Alteration, filed Jan 13, 2020, estimated cost $265K, described as “Modifications to existing sprinkler system per plans filed herewith. No change to occupancy, egress or use.”
- Alteration, filed Jan 13, 2020, estimated cost $336K, described as “Modification to existing plumbing fixtures and all associated piping.”
- Alteration, filed Jan 10, 2020, estimated cost $802K, described as “Structural reinforcement related to interior renovations per plans.”

## Property taxes

- Assessment: $8,730,450
- Market value (city estimate): $19,401,000
- Taxable value: $0
- Assessed land: $1,800,000
- Assessed improvements: $6,930,450

## Zoning

C6-2A: floor area ratio 3.31 built, 6.02 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 12 ft (NAVD88).

## Landmarks

Part of South Street Seaport Historic District (Historic District). 50 Landmarks Preservation Commission permits are on file.

## Board and land use applications

- Disposition of Seaport Properties (City Planning 2021M0422): Completed, filed Jul 22, 2021, decided Dec 10, 2021. NYC Department of Small Business Services (DSBS) seeks approval for the disposition of leasehold and easement interests to extend the term of the existing lease agreement for 99 years, until 2120, with respect to various city-owned…

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
