411 Pearl Street, Manhattan
Public school · built 1975 · Block 113, Lot 100.
Building permits
- Alteration, filed Jun 19, 2026, estimated cost $13K, described as “Provide two new manually operated gym divider curtains at the 5TH floor gymnasium. Provide safety padding around new partition walls. Patch existing finish floor and plenum soffit”
- Alteration, filed Jun 2, 2026, estimated cost $30K, described as “M520, installation of the temporary chain link fence to enclose the temporary chiller trailer, generator, and fuel storage tank on behalf of the contractor in conjunction with DOB # M01409641. No change in use egress or occupancy.”
- Alteration, filed Jun 2, 2026, estimated cost $100K, described as “M520, installation of a temporary emergency mobile chiller trailer and generator connected to existing building chiller system at the sixth floor on behalf of the contractor. No change in use, egress or occupancy.”
- Alteration, filed Oct 2, 2024, estimated cost $20K, described as “Fn/murry bergtraum hs - for temporary construction equipment (fence) submitting on behalf of contractor, related DOB number # M00688737 no change in use,occupancy or egress”
- Alteration, filed Aug 1, 2024, estimated cost $235K, described as “Mechanical work related to a hydroponics lab.”
- Alteration, filed Apr 25, 2024, estimated cost $20K, described as “Ch/murry bergtraum hs - for temporary construction equipment (chute) submitting on behalf of contractor, related DOB number # M00682938 no change in use,occupancy or egress”
- Alteration, filed Apr 4, 2024, estimated cost $20K, described as “Sf/murry bergtraum hs - for temporary construction equipment (scaffold) submitting on behalf of contractor, related DOB number # M00682938 no change in use,occupancy or egress”
- Alteration, filed Apr 4, 2024, estimated cost $20K, described as “Sh/murry bergtraum hs - for temporary construction equipment (shed) submitting on behalf of contractor, related DOB number # M00682938 no change in use,occupancy or egress”
- Alteration, filed Apr 4, 2024, estimated cost $20K, described as “Fn/murry bergtraum hs - for temporary construction equipment (fence) submitting on behalf of contractor, related DOB number # M00682938 no change in use,occupancy or egress”
- Alteration, filed May 25, 2023, estimated cost $1K, described as “Construct new fire-rated bulkhead & drip pan in elevator machine room.”
- Alteration, filed May 4, 2023, estimated cost $30K, described as “Upgrade elevator machine rooms - providing 3.0 ton heat pump systems for elevator machine rooms.”
- Alteration, filed May 4, 2023, estimated cost $30K, described as “Upgrade elevator machine rooms - providing 2.0 ton heat pump systems for elevator machine rooms.”
- Alteration, filed May 4, 2023, estimated cost $30K, described as “Upgrade elevator machine rooms - providing 2.5 ton heat pump systems for elevator machine rooms.”
- Alteration, filed Nov 18, 2022, estimated cost $844K, described as “M520_Remove and replace movable partitions, VCT flooring, and lighting. Provide new space for Hydroponics classrooms. Construct gypsum wallboard enclosures for movable partition panels and piping. Patch, repair, and paint areas affected by…”
- Alteration, filed Aug 11, 2022, estimated cost $212K, described as “M520 D021226_Remove and replace Auditorium stage curtains. Install acoustical sound-absorbing fabric panels. Firestop wall penetrations for stage lighting conduits.”
- Alteration, filed Aug 3, 2022, estimated cost $382K, described as “M520_Remove existing wooden partitions and track system. Remove existing wooden bleachers and provide new extendable wooden bleachers. Provide new wall padding around perimeter of gymnasium.”
- Alteration, filed Jul 20, 2022, estimated cost $267K, described as “M520_Remove existing metal tile ceiling and replace with acoustical ceiling tiles and ACT grid. Remove existing lighting and replace with LED pendant lighting.”
- Alteration, filed Jun 27, 2022, estimated cost $35K, described as “Upgrade elevator machine rooms - providing duct work, air conditioning system, new electrical disconnect and new elevator panel board. Seal existing penetrations with fire rated assembly - elevator no. 1P30542”
- Alteration, filed Mar 1, 2022, estimated cost $400K, described as “Provide a new Emergency Generator in the Mechanical Room. Provide exhaust and make up air for ventilation inside fuel oil storage tank room.”
- Alteration, filed Feb 18, 2022, estimated cost $4.4M, described as “(M520 Roofs) Entire Windows replacement. Main Entry Skylight replacement. Entire Roofing replacement. Fresh air intake louver replacement. Masonry repointing, repair and replacement (Cast Stone, Windowsills, entire). Repair pipe…”
- Alteration, filed Jul 22, 2021, estimated cost $2.7M, described as “M520/Mechanical work related to COVID Ventilation project”
Property taxes
- Assessment
- $40,005,450
- Market value (city estimate)
- $88,901,000
- Taxable value
- $0
- Assessed land
- $6,038,550
- Assessed improvements
- $33,966,900
Zoning
C6-4: floor area ratio 5.68 built, 10.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.