99 Church Street, Manhattan
Condominium · 155 units · built 2008 · Block 123, Lot 7502.
Building permits
- Alteration, filed Sep 28, 2026, estimated cost $34K, described as “612 sq. Ft. Interior tenant fit-out of retail store on first floor. No changein use, occupancy, or egress.”
- Alteration, filed Oct 21, 2025, estimated cost $100K, described as “Renovation of an existing apartment 61D on the 61st Floor. Work includes non-structural demolition and general construction as per plans filed herewith.”
- Alteration, filed Aug 23, 2025, estimated cost $98K, described as “Removal of non-bearing partition between two bedrooms and two walk-in closets. Removal of pocket doors between living room and dining area. New dropped ceilings in living room and bedrooms to accommodate recessed lighting”
- Alteration, filed Jul 8, 2025, estimated cost $5K, described as “Interior renovation of existing residential unit to include minor demolition, partition and carpentry work. No change to use, occupancy or egress”
- Alteration, filed Jul 7, 2025, estimated cost $110K, described as “Installation of plumbing fixtures along with related piping.”
- Alteration, filed Jul 7, 2025, estimated cost $425K, described as “Interior renovations of apartment 71A; work to include removal and installation of interior partitions, floors, ceilings and doors. No change to occupancy use or egress.”
- Alteration, filed Mar 3, 2025, estimated cost $27K, described as “Partial interior renovation of existing condominium apartment.removal of non-rated partitions. Installation new non-rated partitions.no plumbing or mechanical work. No changes to use, egress, bulk or far”
- Alteration, filed Dec 5, 2024, estimated cost $1.1M, described as “Proposed general construction work on floors 21 & 22 is limited to improvements of an existing structure designed for mixed res. & commercial. No change in use, egress, or occupancy.”
- Alteration, filed Dec 1, 2024, described as “FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESSTECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola”
- Alteration, filed Jul 31, 2024, described as “Suspended scaffolding for facade restoration as shown on plans”
- Alteration, filed Apr 16, 2024, estimated cost $198K, described as “Interior renovation of apt 67A, minor demolition of non-load bearing partitions, painting, sanding and finishing work. All as per plans and applications”
- Alteration, filed Dec 11, 2023, described as “FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Kenneth Cole”
- Alteration, filed Sep 21, 2023, estimated cost $20K, described as “Filing for plumbing/sprinkler work as per plans”
- Alteration, filed Sep 21, 2023, estimated cost $20K, described as “Filing for general construction work as per plans. No change to use, egress, and/or occupancy”
- Alteration, filed May 11, 2023, estimated cost $195K, described as “Apartment renovation apt 77A (77th fl marketing/62ND fl co) work to include partition, ceiling, and door modifications as indicated on plans. No change in use, egress or occupancy.”
- Alteration, filed Jan 11, 2023, estimated cost $10K, described as “Modification to existing sprinkler system to include removal and relocation of sprinkler heads. No change to use, occupancy or egress”
- Alteration, filed Dec 7, 2022, estimated cost $50K, described as “Modifications to existing plumbing systems to include fixture replacement, relocation and installation of new fixtures as indicated on plans. No change to use, occupancy or egress”
- Alteration, filed Dec 5, 2022, estimated cost $340K, described as “Interior renovation of existing residential unit to include minor demolition, partition and carpentry work. No change to use, occupancy or egress”
- Alteration, filed Aug 17, 2022, estimated cost $32K, described as “Installation of 2 new accessory awnings on building facade. No change in use, egress, or occupancy.”
- Alteration, filed Jun 8, 2022, estimated cost $33K, described as “Installation of 3 new accessory awnings on building facade. No change in use, egress, or occupancy.”
- Alteration, filed Dec 15, 2021, estimated cost $16K, described as “Filing herewith drawings to relocate existing wet sprinkler heads as needed based on architectural renovations. Coordinate sprinkler system shutdown and fire watch with building management of apartment # PH78A.”
- Alteration, filed Dec 15, 2021, estimated cost $37K, described as “Hereby filing this application to propose plumbing work inconjunction to interior renovation of apartment # PH78A. This app does not require a new or amended cert. Of occupancy as there is no change in use, egress or occupancy.”
- Alteration, filed Dec 15, 2021, estimated cost $296K, described as “Filing herewith drawings to propose an interior renovation & new layout configuration of existing apartment # PH78A. This application do not require a new or amended certificate of occupancy as there is no change in use, exists or…”
- Alteration, filed Dec 15, 2021, estimated cost $5K, described as “Filing herewith drawings to revise existing HVAC duct distribution based on proposed architectural design of apartment # PH78A.”
- Alteration, filed Dec 10, 2021, estimated cost $50K, described as “Mechanical works as shown in plans at apt 78B on 69TH and 70TH floors. No change in egress, occupancy or use.”
7 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $129,284,105
- 2026–27 tax
- $13,539,104
- Market value (city estimate)
- $287,298,006
- Taxable value
- $113,942,469
- Assessed land
- $7,905,599
- Assessed improvements
- $121,378,506
- Condo units with their own tax lots
- 158
Zoning
C5-3: floor area ratio 20.68 built, above the 15.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Aug 10, 2026: $6,400,000, Apt 69B
- Jul 21, 2026: $3,800,000, Apt 51E
- Jun 26, 2026: $3,915,000, Apt 62C
- Jun 5, 2026: $6,750,000, Apt 54A
- Jun 3, 2026: $2,999,990, Apt 52C
- Apr 28, 2026: $5,350,000, Apt 50D
- Mar 30, 2026: $3,200,000, Apt 60C
- Jan 21, 2026: $5,300,000, Apt 60B
- Sep 10, 2025: $3,875,000, Apt 57D
- Aug 28, 2025: $2,710,000, Apt 46C
The 10 most recent of 197 open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- Change to an earlier grant (Board of Standards and Appeals 2016-4141-BZII): Change to an earlier grant, Granted, filed Jul 27, 2018, decided Feb 26, 2019. Amendment of a previously approved Special Permit (§73-36) which permitted the operation of a physical culture establishment (Four Seasons Hotel New York Downtown) on a portion of the first and third floors of a mixed-use hotel and…
- Variance or special permit (Board of Standards and Appeals 2016-4141-BZ): Variance or special permit, Granted, filed Mar 17, 2016, decided Feb 14, 2017. Special Permit (§73-36) to permit a physical culture establishment (Four Seasons Hotel New York Downtown) on a portion of the third floor of a mixed-use hotel and residential building. C5-3 (LM) zoning district.
- 99 CHURCH STREET POPS (City Planning P2012M0308): Completed, decided Feb 5, 2013. Chairperson certification for a new public plaza at 99 Church Street.
- 99 CHURCH ST, 21 BARCLAY ST, 22 PARK PLACE (City Planning P2008M0327): Completed, decided May 23, 2008. CERT TO WAIVE REQUIREMENTS FOR A SUBWAY STAIR RELOCATION TO*BUILD A MIXED-USE BLDG