# 11 Park Place, Manhattan

Commercial · built c. 1927 · Block 124, Lot 4.

On Umarelli: https://umarelli.org/nyc/1001240004/11-park-place

More construction in Civic Center: https://umarelli.org/nyc/manhattan/civic-center.md

Every lot on block 124: https://umarelli.org/nyc/manhattan/124.md

## Building permits

- Alteration, filed Jun 23, 2026, estimated cost $143K, described as “General Construction work as shown on plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed May 19, 2026, estimated cost $2K, described as “Install Kitchen Hood, Exhaust Fan and Associated Ductwork as per plan. No Change to Use or Occupancy.”
- Alteration, filed Apr 21, 2026, estimated cost $225K, described as “Interior demo of partitions, ceilings and doors for existing office space. No change in use, egress or occupancy.”
- Alteration, filed Jan 27, 2026, estimated cost $36K, described as “Removal of exist. Water cooled air handler in ceiling space and install new split-system air handler on first floor ceiling space and instillation of new condenser on lower roof with new steel support on exist. Dunnage.”
- Alteration, filed Jan 27, 2026, estimated cost $21K, described as “Proposed hand sink, slop sink, and pitcher rinser to be added into exist. Plumbing for bagel store.”
- Alteration, filed Jan 27, 2026, estimated cost $56K, described as “Interior renovation of a previously existing restaurant into a bagel shop.”
- Alteration, filed Nov 26, 2025, estimated cost $56K, described as “Interior renovation of a previously existing restaurant into a bagel shop.”
- Alteration, filed Nov 26, 2025, estimated cost $21K, described as “Proposed hand sink, slop sink, and pitcher rinser to be added into exist. Plumbing for bagel store.”
- Alteration, filed Nov 26, 2025, estimated cost $36K, described as “Removal of exist. Water cooled air handler in ceiling space and install new split-system air handler on first floor ceiling space and instillation of new condenser on lower roof with new steel support on exist. Dunnage.”
- Alteration, filed May 8, 2025, estimated cost $25K, described as “Interior demolition existing partitions and finishes as shown on plans.”
- Alteration, filed Mar 17, 2025, estimated cost $69K, described as “Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Nov 5, 2024, described as “Non-illuminated non-advertising double-sided projecting accessory banner sign - industrious. No change of use, egress or occupancy.”
- Alteration, filed Nov 5, 2024, described as “Non-illuminated non-advertising double-sided projecting accessory banner sign - industrious. No change of use, egress or occupancy.”
- Alteration, filed Aug 19, 2024, estimated cost $65K, described as “General construction work as shown on plans”
- Alteration, filed Jan 29, 2024, described as “Installation of temporary suspended scaffolds and material hoist per plan submitted. Work shall comply with 2022 building code chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Nov 17, 2023, estimated cost $140K, described as “General construction work as shown on plans (Suite 1212 Renovation).”
- Alteration, filed Oct 19, 2023, estimated cost $850K, described as “Submitting PAA to approve revised plans submitted herewith. WVA#45844/23”
- Alteration, filed Dec 8, 2022, estimated cost $24K, described as “Interior renovation for restaurant @ 1ST. Floor. No change in use, egress and occupancy.”
- Alteration, filed Aug 5, 2022, estimated cost $9K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Jul 22, 2022, estimated cost $65K, described as “Non-structural demolition as shown on plans”
- Alteration, filed Jul 22, 2022, estimated cost $8K, described as “Plumbing work as shown on plans”
- Alteration, filed Jul 22, 2022, estimated cost $20K, described as “Modifications to an existing sprinkler system”
- Alteration, filed Jul 21, 2022, estimated cost $25K, described as “Modifications to an existing sprinkler system”
- Alteration, filed Jul 21, 2022, estimated cost $65K, described as “Plumbing work as shown on plans”
- Alteration, filed May 24, 2022, estimated cost $8K, described as “Modifications to an existing sprinkler system”

27 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1001240004/11-park-place.

## Property taxes

- Assessment: $23,718,600
- 2026–27 tax: $2,389,628
- Market value (city estimate): $52,708,000
- Taxable value: $22,060,509
- Assessed land: $1,939,500
- Assessed improvements: $21,779,100

## Tax breaks

- Abatement (city code CERP), through Jan 31, 2027, a $3,496 credit this tax year.

## Zoning

C6-4: floor area ratio 16.76 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- LM Plaza Applicability Text Amendment (City Planning P2017M0129): Completed, decided Jul 26, 2017. Zoning text amendment to Section 91-24 affecting the applicability of the public plaza bonus for sites within 50' of designated streets in C6-4 districts within the Special Lower Manhattan District.
- HRA COMMUNITY ALTERNATIVE SYS OFF (City Planning P1993M0390): Completed, decided Jul 14, 1993. ACQUIRE APPROX 10,000SF OF SPACE TO RELOCATE THE AGENCY III\*OFFICE
- HRA/CHILD DEV FIELD OFFICE (City Planning P1993M0317): Completed, decided May 19, 1993. ACQUIRE APPROX 10,000SF OF OFFICE SPACE ON THE 17 & 18\*FLOORS TO RELOCATE HRA/AGENCY FOR CHILD DEVELOPMENT FIELD\*OFFICE

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology