# 250 Broadway, Manhattan

Office condominium · built 1964 · Block 124, Lot 7502.

On Umarelli: https://umarelli.org/nyc/1001247502/250-broadway

More construction in Civic Center: https://umarelli.org/nyc/manhattan/civic-center.md

Every lot on block 124: https://umarelli.org/nyc/manhattan/124.md

## Building permits

- Alteration, filed Oct 26, 2026, estimated cost $13K, described as “Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.”
- Alteration, filed May 27, 2026, estimated cost $5K, described as “Erect, maintain & dismantle of heavy duty sidewalk shed per drawings attached herewith”
- Alteration, filed Dec 2, 2025, described as “Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Nov 26, 2025, described as “Installation of suspended scaffold for facade inspection/repair.”
- Alteration, filed Sep 26, 2025, estimated cost $200K, described as “Modifications to existing mechanical systems to include replacement of HVAC unit. No change to use, occupancy or egress”
- Alteration, filed Sep 8, 2025, estimated cost $239K, described as “Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Sep 8, 2025, estimated cost $29K, described as “Modification to existing plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.”
- Alteration, filed Sep 8, 2025, described as “Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Diego Buri Cumbe”
- Alteration, filed Sep 8, 2025, estimated cost $39K, described as “Modification to existing sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.”
- Alteration, filed Sep 3, 2025, estimated cost $733K, described as “Tenant Alterations on the 26th floor \[27th fl marketing\] only. Construction of interior non-load bearing partitions and related finishes filed here with no alterations to existing building envelope. There is no change to use, egress or…”
- Alteration, filed Aug 19, 2025, estimated cost $10K, described as “Description of structural work to be completed (slab infill, beam repair, etc.)&linear footage of proposed steel:Demo existing stair and partial demo existing slab, frame stair & slab infill. New steel 18'-6". No change in use, egress or…”
- Alteration, filed Aug 13, 2025, estimated cost $38K, described as “Modification to existing plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.”
- Alteration, filed Aug 12, 2025, estimated cost $815K, described as “Installation of non bearing partitions and related finishes as per plans filed herewith. no change in use, egress or occupancy under this application.”
- Alteration, filed Aug 12, 2025, estimated cost $185K, described as “Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application”
- Alteration, filed Aug 12, 2025, estimated cost $60K, described as “Modification to existing sprinkler system as per plans filed herewith, no change in use, egress or occupancy”
- Alteration, filed Jul 30, 2025, estimated cost $20K, described as “Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application”
- Alteration, filed Jul 30, 2025, estimated cost $6K, described as “Modification to existing sprinkler system as per plans filed herewith, no change in use, egress or occupancy”
- Alteration, filed Jul 30, 2025, estimated cost $5K, described as “Modification to existing plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.”
- Alteration, filed Jul 30, 2025, estimated cost $3.9M, described as “Tenant Alterations on the 23, 24 & 27th floors only. Scope includes removal & installation of interior non-load bearing partitions & related finishes filed here w/ no alterations to existing blding envelope. There's no change to use,…”
- Alteration, filed Jul 30, 2025, estimated cost $20K, described as “Description of structural work to be completed (slab infill, beam repair, etc.) and linear footage of proposed steel:Demo existing stair and partial demo existing slab, New steel 18-6 as per plans filed herewith. No change in use, egress…”
- Alteration, filed Jul 28, 2025, estimated cost $160K, described as “Modification to existing sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.”
- Alteration, filed Jul 28, 2025, estimated cost $75K, described as “Modification to existing plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.”
- Alteration, filed Jul 28, 2025, estimated cost $880K, described as “Modification to existing HVAC system as per plans filed herewith. no change in use, egress or occupancy under this application.”
- Alteration, filed Jul 25, 2025, estimated cost $48K, described as “Removal of non bearing partitions and related finishes as per plans filed herewith. no change in use, egress or occupancy under this application.”
- Alteration, filed Jun 26, 2025, estimated cost $7K, described as “Modification to existing sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.”

80 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1001247502/250-broadway.

## Property taxes

- Assessment: $60,219,000
- 2026–27 tax: $5,054,916
- Market value (city estimate): $133,820,000
- Taxable value: $46,597,677
- Assessed land: $5,535,000
- Assessed improvements: $54,684,000
- Condo units with their own tax lots: 2

## Zoning

C5-3: floor area ratio 20.05 built, above the 15.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
