# 100 Church Street, Manhattan

Condominium · built 1959 · Block 125, Lot 7501.

On Umarelli: https://umarelli.org/nyc/1001257501/100-church-street

More construction in Civic Center: https://umarelli.org/nyc/manhattan/civic-center.md

Every lot on block 125: https://umarelli.org/nyc/manhattan/125.md

## Building permits

- Alteration, filed Sep 4, 2026, estimated cost $110K, described as “Modifications to the existing plumbing system on the 1st Floor retail space (Joe & the Juice) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Sep 4, 2026, estimated cost $90K, described as “Modifications to the existing HVAC system and associated ducts & piping on the 1st floor (Joe & the Juice) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Aug 8, 2026, estimated cost $450K, described as “Interior renovation with minor demolition and installation of new partitions, doors, suspended ceilings and finishes on the 1st Floor retail space (Joe & the Juice), as per plans. No change to use, egress or occupancy.”
- Alteration, filed Aug 5, 2026, described as “Installation of temporary sidewalk shed as per plan. There is no change in use, egress, or occupancy.”
- Alteration, filed Jun 10, 2026, estimated cost $18K, described as “Modifications to the existing sprinkler system on the 20th floor (NYC Campaign Finance Board) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Jun 10, 2026, estimated cost $10K, described as “Modifications to the existing plumbing system on the 20th floor (NYC Campaign Finance Board) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Jun 10, 2026, estimated cost $25K, described as “Modifications to the existing HVAC system on the 20th floor (NYC Campaign Finance Board) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Jun 2, 2026, estimated cost $75K, described as “Minor demolition with installation of new partitions, doors, ceilings and finishes on the 20th floor (NYC Campaign Finance Board) as per plans. No change to use, egress or occupancy.”
- Alteration, filed May 15, 2026, described as “FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola”
- Alteration, filed Feb 26, 2026, estimated cost $60K, described as “Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 10th floor (CCRB), as per plans. No change to use, egress or occupancy.”
- Alteration, filed Feb 25, 2026, estimated cost $20K, described as “Modifications to the existing sprinkler system on the 10th Floor (CCRB) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Feb 25, 2026, estimated cost $25K, described as “Modifications to the existing HVAC system and associated ducts & piping on the 10th floor (CCRB) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Aug 5, 2025, estimated cost $50K, described as “Modifications to the existing sprinkler system on the 8th Floor (Partial Floor) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Aug 5, 2025, estimated cost $45K, described as “Modifications to the existing plumbing system on the 8th Floor (Partial Floor) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Aug 5, 2025, estimated cost $275K, described as “Modifications to the existing HVAC system and associated ducts & piping on the 8th floor (Partial Floor) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Aug 5, 2025, estimated cost $320K, described as “Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 8th floor, as per plans. No change to use, egress or occupancy.”
- Alteration, filed Apr 2, 2025, estimated cost $17K, described as “Modifications to the existing sprinkler system on the 1st floor (Thearpie Retail) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Apr 2, 2025, estimated cost $37K, described as “Modifications to the existing plumbing system on the 1st floor (Thearpie Retail) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Apr 2, 2025, estimated cost $200K, described as “Modifications to the existing HVAC system on the 1st floor (Thearpie Retail) as per plans. No change to use, egress or occupancy”
- Alteration, filed Apr 1, 2025, estimated cost $345K, described as “Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 1st floor (Thearpie Retail) as per plans. No change to use, egress or occupancy.”
- Alteration, filed Jan 9, 2025, estimated cost $50K, described as “Modifications to the existing HVAC system on the basement floor (Compressor Replacement) as per plans. No change to use, egress or occupancy”
- No Work, filed Jun 3, 2024

## Property taxes

- Assessment: $89,160,628
- 2026–27 Tax: $8,932,736
- Market value (city estimate): $203,081,569
- Taxable value: $82,261,128
- Assessed land: $8,206,989
- Assessed improvements: $80,953,639
- Condo units with their own tax lots: 4

## Zoning

C5-3: floor area ratio 15.50 built, above the 15.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Variance or Special Permit (Board of Standards and Appeals 2018-132-BZ): Variance or Special Permit, Granted, filed Aug 7, 2018, decided Jan 15, 2019. Special Permit (§73-36) to permit the operation of a physical culture establishment (Club) within an existing building contrary to ZR §32-10. C5-3 Special Lower Manhattan District.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
