# 255 Greenwich Street, Manhattan

Commercial · built 1987 · Block 127, Lot 18.

On Umarelli: https://umarelli.org/nyc/1001270018/255-greenwich-street

More construction in Civic Center: https://umarelli.org/nyc/manhattan/civic-center.md

Every lot on block 127: https://umarelli.org/nyc/manhattan/127.md

## Building permits

- Alteration, filed Oct 28, 2026, estimated cost $50K, described as “Design includes replacement of existing air cooled units in kind for an existing office space. No change in use, egress, or occupancy under this filing.”
- Alteration, filed Mar 14, 2026, described as “Facade inspection”
- Alteration, filed Oct 7, 2025, estimated cost $56K, described as “Modification to existing fire sprinkler system for new tenant buildout”
- Alteration, filed Aug 21, 2025, estimated cost $10K, described as “Modifications to plumbing systems as per plans filed herewith. No change of use, occupancy, or egress”
- Alteration, filed Jul 10, 2025, estimated cost $34K, described as “Modifications to plumbing/sprinkler systems as per plans filed herewith. No change of use, occupancy, or egress”
- Alteration, filed Jul 10, 2025, estimated cost $200K, described as “Modifications to mechanical systems as per plans filed herewith. No change of use, occupancy, or egress”
- Alteration, filed Jul 10, 2025, estimated cost $622K, described as “Installation of interior non-bearing partitions and related finishes as per drawings filed herewith. No change in use, egress, or occupancy”
- Alteration, filed May 22, 2025, estimated cost $57K, described as “Interior alterations of existing commercial office space. No change to use, occupancy or egress”
- Alteration, filed Aug 26, 2024, estimated cost $153K, described as “Garage repairs to include surface preparation and patching of existing concrete slabs, minor steel reinforcement.”
- Alteration, filed Sep 7, 2023, estimated cost $299K, described as “Plumbing work for restroom renovation on floors 6-9.”
- Alteration, filed Sep 7, 2023, estimated cost $19K, described as “Sprinkler work for restroom renovation on floors 6-9.”
- Alteration, filed Sep 7, 2023, estimated cost $75K, described as “Mechanical work for restroom renovation on floors 6-9.”
- Alteration, filed Sep 7, 2023, estimated cost $546K, described as “General construction for restroom renovation for floors 6-9.”
- Alteration, filed Sep 5, 2023, estimated cost $102K, described as “Interior demolition for ac removal on 10,11,12 & 13th floors (14th floor marketing)”
- Alteration, filed Sep 5, 2023, estimated cost $67K, described as “Sprinkler work for direct Replacement of AC units on floors 10,11,12 & 13th floors (14th floor marketing)”
- Alteration, filed Sep 5, 2023, estimated cost $1.4M, described as “Mechanical work for direct Replacement of AC units on floors 10,11,12 & 13th floors (14th floor marketing)”
- Alteration, filed Aug 21, 2023, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Nov 1, 2022, estimated cost $15K, described as “Sprinkler work for AC Replacement on 5th floor”
- Alteration, filed Nov 1, 2022, estimated cost $210K, described as “Mechanical work for direct Replacement of AC units on 5th floor”
- Alteration, filed Nov 1, 2022, estimated cost $15K, described as “Interior demolition for ac removal on 5th floor”
- Alteration, filed Sep 21, 2022, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300PSF.”
- Alteration, filed Sep 9, 2022, estimated cost $64K, described as “Sprinkler work for AC Replacement on floors 6-9”
- Alteration, filed Sep 9, 2022, estimated cost $1.2M, described as “Mechanical work for direct Replacement of AC units on floors 6-9”
- Alteration, filed Sep 6, 2022, estimated cost $45K, described as “Replacement and additional installation of Water Cooled Units on 7th & 8th Floor. There is no change of use, egress or occupancy filed under this application.”
- Alteration, filed Aug 31, 2022, estimated cost $80K, described as “Interior demolition for ac removal on floors 6 through 9”

9 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/1001270018/255-greenwich-street.

## Building history

- Alteration, filed Jun 6, 2016, permit issued - entire job/work, described as “Change use of portion of building on floors cellar, 1-3. Increase occupant loa d on 4TH floor. Install demising partitions.”
- Alteration, filed Feb 11, 2004, signed off Mar 14, 2011, described as “Change use of portion of building on floors cel, 1,2,10,11,12,&amp; 13 from office, use group 6, to trade school, use group 9. All construction work on floors 10 &amp; 11 filed as part of this application. All other construction on the…”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $63,257,850
- 2026–27 Tax: $6,663,728
- Market value (city estimate): $140,573,000
- Taxable value: $61,428,169
- Assessed land: $7,785,000
- Assessed improvements: $55,472,850

## Zoning

C6-4: floor area ratio 12.91 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- 255 Greenwich Street Office Space (City Planning P2018M0188): Completed, decided Mar 6, 2018. Application by the NYC Campaign Finance Board (CFB) and DCAS to acquire office space on the 4th floor of 255 Greenwich street for use by the NYC Campaign Finance Board (CFB). Section 195 of City Charter, Office Space Acquisition.
- LM Plaza Applicability Text Amendment (City Planning P2017M0129): Completed, decided Jul 26, 2017. Zoning text amendment to Section 91-24 affecting the applicability of the public plaza bonus for sites within 50' of designated streets in C6-4 districts within the Special Lower Manhattan District.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
