125 Barclay Street, Manhattan
Commercial · built c. 1932 · Block 128, Lot 26.
Building permits
- Alteration, filed Jun 30, 2026, estimated cost $500, described as “Plugging of existing 6" fire sprinkler service for future sprinkler system connection.”
- Alteration, filed Sep 16, 2025, estimated cost $63K, described as “Decommission of existing tmo site. Remove equipment and 4 rrh from 4TH floor. Remove 4 antennas from facade . Remove cables from 4TH and facade.no change in use, egress or occupancy.tmo installed under # 101472693.”
- Alteration, filed Feb 17, 2025, described as “Installation of temporary suspended scaffolds per plan submitted. Work shall comply with 2022 building code chapter 33. No change in use, egress and/or occupancy with this application.”
- No Work, filed Jan 23, 2025, described as “1/28 - 5PM to 10PM 1/29 - 5PM to 10PM”
- No Work, filed Oct 16, 2024, described as “(10/22) Union Delegates Meeting (10/25) Ribbon Cutting (10/26) Anniversary Gala (10/27) Sunday Service”
- Alteration, filed Sep 30, 2024, estimated cost $3K, described as “Erect an illumnated business accessory wall sign on existing canopy. No change in use, egress, or occupancy.”
- Alteration, filed Sep 30, 2024, estimated cost $2K, described as “Erect an illumnated business accessory wall sign on existing canopy. No change in use, egress, or occupancy.”
- Alteration, filed Oct 19, 2023, estimated cost $10K, described as “Installation of an adt access system on the roof as per plans. No change in use, egress or occupancy under this application. Scaffold to comply with chapter 33 of NYC building code of 2022.”
- No Work, filed Jul 26, 2023
- No Work, filed Jul 26, 2023
- No Work, filed Jul 26, 2023
- No Work, filed Jul 26, 2023
- Alteration, filed May 8, 2023, estimated cost $2K, described as “Use of mini crane during major renovations, filed separately under M00510478.”
- Alteration, filed May 8, 2023, estimated cost $2K, described as “Use of glass manipulator during major renovations, filed separately under M00510478.”
- Alteration, filed Apr 10, 2023, estimated cost $19.5M, described as “Interior renovations on floors 2-10, as shown on plans. No change in use, occupancy, or egress. Fit-out work filed in conjunction with core & shell alt-co #M00510478.”
- Alteration, filed Oct 4, 2022, estimated cost $10K, described as “Temporary shoring as per drawings. Shoring shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Aug 24, 2022, estimated cost $45K, described as “Installation of dry standpipes per on floors cel, 001-010, pen & rof, as shown on plans and FDNY variance. No change in use, occupancy or egress. In conjunction with ALT1 job #M00510478.”
- Alteration, filed Jun 29, 2022, estimated cost $25K, described as “Equipment use for partial demolition of building structure including partial removal of interior slabs, partial removal of steel beams/girders/columns, removal of rooftop sign structure and facade. Refer to drawings & comments below for…”
- Alteration, filed Jun 14, 2022, estimated cost $5K, described as “Installation of temporary trolley beam system as per drawings. Trolley beam shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed May 27, 2022, estimated cost $189K, described as “Partial demolition of the existing structure at 125 Barclay St New York, NY for interior renovation and facade replacement. This includes slab openings throughout and removal of sign structure on the roof”
- Alteration, filed Apr 21, 2022, estimated cost $5K, described as “Proposed plaza waterproof at the ground floor, as shown on plans. No change in use, occupancy or egress.”
- Alteration, filed Apr 20, 2022, estimated cost $20K, described as “Installation of dual 7500 # capacity personnel/material hoists during bldg alteration filed sep. Hoists shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. Elevator application submitted…”
- Alteration, filed Mar 11, 2022, estimated cost $50K, described as “Installation of heavy duty sidewalk shed during bldg alteration, filed sep. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Mar 10, 2022, estimated cost $20K, described as “Installation of plywood fence as per drawings. Plywood fence shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. Fence installed on sidewalk/roadway. Dot permits by others.”
- Alteration, filed Mar 9, 2022, estimated cost $30K, described as “Installation of temporary scaffold as per drawings. Scaffold shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
7 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $26,795,700
- 2026–27 tax
- $2,858,338
- Market value (city estimate)
- $59,546,000
- Taxable value
- $26,348,988
- Assessed land
- $3,042,000
- Assessed improvements
- $23,753,700
Zoning
C6-4: floor area ratio 11.29 built, above the 10.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NAVD88).
Recent sales
- Jun 26, 2024: $23,350,000
Open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- LM Plaza Applicability Text Amendment (City Planning P2017M0129): Completed, decided Jul 26, 2017. Zoning text amendment to Section 91-24 affecting the applicability of the public plaza bonus for sites within 50' of designated streets in C6-4 districts within the Special Lower Manhattan District.
In the news
125 Barclay Street’s Re-Cladding Nears Completion in Tribeca, Manhattan, New York YIMBY, Feb 12, 2024.