# 41 Warren Street, Manhattan

Condominium · 6 units · built c. 1854 · Block 133, Lot 7505.

On Umarelli: https://umarelli.org/nyc/1001337505/41-warren-street

More construction in Civic Center: https://umarelli.org/nyc/manhattan/civic-center.md

Every lot on block 133: https://umarelli.org/nyc/manhattan/133.md

## Building permits

- Alteration, filed Jul 24, 2025, estimated cost $220K, described as “Relocation of existing domestic water and sanitary piping & equipment, replacement of firepump and controls as per plans submitted herewith. No change in use, egress or occupancy.”
- Alteration, filed Nov 8, 2024, estimated cost $98K, described as “Partial sidewalk vault replacement and waterproofing. No change in use, egress or occupancy.”
- Alteration, filed Sep 26, 2024, estimated cost $28K, described as “9TH cycle fisp repairs including: marble patch and crack repairs and mortar joint repointing. Miscellaneous sealant and caulking repairs. No change to use, egress, or occupancy.”
- Alteration, filed Jun 11, 2024
- Alteration, filed May 2, 2024, estimated cost $10K, described as “Register (5) gas-fired boilers as per plans to address open ecb violations 39088076Z; 39088077K; 39088078M. No change in use, occupancy or egress.”
- Alteration, filed Nov 15, 2023, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Feb 1, 2023, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300PSF.”
- Alteration, filed Oct 31, 2022, estimated cost $28K, described as “Filing for the modification to the existing sprinkler system in conjunction with the apartment renovation”
- Alteration, filed Oct 31, 2022, estimated cost $238K, described as “Filing to renovate the second floor apartment. No change in use, egress or occupancy.”
- Alteration, filed Oct 31, 2022, estimated cost $33K, described as “Filing for the plumbing work in conjunction with the apartment renovation.”
- Alteration, filed Oct 31, 2022, estimated cost $65K, described as “Filing for the mechanical work in conjunction with the apartment renovation.”
- Alteration, filed Jul 25, 2022, estimated cost $90K, described as “Interior renocation of unit 3. Minor partition work. Kitchen and bathroom renovation. Plumbing work to be filed under separate application. No change in use, occupancy or egress invol”
- Alteration, filed May 3, 2022, estimated cost $28K, described as “Installation of sprinkler heads as per plans filed herewith.”
- Alteration, filed May 3, 2022, estimated cost $72K, described as “Installation of plumbing fixtures as per plans filed herewith”
- Alteration, filed May 3, 2022, estimated cost $424K, described as “Interior renovations of dental office to include partitions and finishes along with installation of mechanical equipment as per plans filed herewith. No change to use, egress or occupancy”
- Alteration, filed Oct 22, 2021, estimated cost $45K, described as “Removals of partitions and finishes as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Jan 10, 2021, estimated cost $27K, described as “Replacement work condensing unit and air handler unit for HVAC system. No change in use, egress or occupancy under this application.”

## Property taxes

- Assessment: $6,452,551
- 2026–27 tax: $387,428
- Market value (city estimate): $14,338,998
- Taxable value: $3,527,736
- Assessed land: $247,501
- Assessed improvements: $6,205,050
- Condo units with their own tax lots: 8

## Tax breaks

- Co-op and condo abatement, with no end date, a $51,387 credit this tax year.

## Zoning

C6-3A: floor area ratio 5.67 built, 7.52 allowed by base zoning.

## Recent sales

- Feb 18, 2025: $4,850,000, Apt 6
- Feb 21, 2024: $550,000, Unit SUB-C
- Dec 6, 2022: $7,000,000, Apt 7
- Sep 28, 2021: $675,000, Unit SUB-C
- Sep 24, 2021: $4,150,000, Apt COM1
- Sep 1, 2021: $4,305,000, Apt 2
- Jul 8, 2021: $6,500,000, Apt 7
- Apr 16, 2021: $650,000, Apt COM1
- Aug 25, 2020: $4,100,000, Apt 4
- Jun 20, 2019: $4,420,000, Apt 6

The 10 most recent of 11 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of Tribeca South Historic District Extension (Historic District). 24 Landmarks Preservation Commission permits are on file.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
