270 Broadway, Manhattan
Condominium · 87 units · built c. 1910 · Block 135, Lot 7504.
Building permits
- Alteration, filed Oct 9, 2026, estimated cost $1.7M, described as “Mechanical modifications as per plans”
- Alteration, filed Oct 6, 2026, estimated cost $182K, described as “In unit 10F, demolition and installing of non-loadbearing partitions, ceilings and lighting as shown in plans. No change to egress, use, or occupancy.”
- Alteration, filed Jul 7, 2026, described as “Industrial rope access for facade inspections.”
- Alteration, filed Jun 9, 2026, estimated cost $5K, described as “Installation of new fire rated door entry door in apartment 24C.”
- Alteration, filed Feb 10, 2026, estimated cost $116K, described as “H&R Block - Replacement of existing HVAC unit on the 1st floor retail space as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.”
- Alteration, filed Jan 13, 2026, estimated cost $702K, described as “Mechanical modifications as per plans”
- Alteration, filed Jan 5, 2026, estimated cost $125K, described as “Exterior renovation of penthouse apt 26B, at the 26th and roof level, as per plans filed herewith. Filed in conjunction with alt# M01158896”
- Alteration, filed Dec 19, 2025, estimated cost $962K, described as “Renovation of existing apartment 22AB in a condominium building. No change in use, egress or occupancy under this application”
- Alteration, filed Dec 19, 2025, estimated cost $96K, described as “Installation of new plumbing fixtures and associated piping for a renovation apartment UNIT#22AB. No change of use, egress or occupancy under this application.”
- Alteration, filed Jul 1, 2025, estimated cost $360K, described as “Herewith filing mechanical work on floors 26-28, as per plans submitted. No change to use, egress or occupancy.”
- Alteration, filed May 9, 2025, estimated cost $30K, described as “General construction to include interiors renovation of an existing commercial space as per plans. There will be no change in use, egress, or occupancy.”
- Alteration, filed Apr 24, 2025, estimated cost $50K, described as “Mechanical modifications as per plans”
- Alteration, filed Mar 17, 2025, estimated cost $25K, described as “Interior renovation of apt 26B on the 26th floor, as per plans filed herewith.”
- Alteration, filed Feb 24, 2025, estimated cost $50K, described as “Interior renovation of penthouse apt b and c on the 27th and 28th floors, as per plans filed herewith.”
- Alteration, filed Feb 12, 2025, estimated cost $120K, described as “Sprinkler work at penthouse apt 26B, on the 26th, 27th, 28th floors and bulkhead at roof as per plans filed herewith.”
- Alteration, filed Feb 7, 2025, estimated cost $130K, described as “Various new structural openings and infills of existing openings within the 27th, 28th floors, and roof framing levels, including additional steel for new openings and rooftop equipment support”
- Alteration, filed Feb 5, 2025, estimated cost $322K, described as “Plumbing work at penthouse apt 26B, on the 26th, 27th, 28th floors and roof as per plans filed herewith.”
- Alteration, filed Jan 17, 2025, estimated cost $301K, described as “General construction is proposed in existing unit #26A on the 26th floor. Subsequent plumbing and sprinkler applications are to be filed. All following submitted plans. No changes to use, egress, or occupancy under this application.”
- Alteration, filed Jan 10, 2025, estimated cost $2.1M, described as “Interior renovation of penthouse apt 26B, at the 26th, 27th, 28th floors and roof as per plans filed herewith.”
- Alteration, filed Sep 4, 2024, estimated cost $30K, described as “General construction to include interior renovation and minor interior demolition on 2nd fl suite 205”
- Alteration, filed Dec 7, 2023, estimated cost $1K, described as “Erect non-illuminated accessory business sign on wall reading "logo h&r block".”
- Alteration, filed Oct 19, 2023, estimated cost $98K, described as “General construction to include interior renovation and minor interior demo to an existing office space located on the 1st fl suite #”
- Alteration, filed Oct 17, 2023, estimated cost $14K, described as “Plumbing modifications to an existing office space located on the 1st fl suite”
- Alteration, filed May 18, 2023, estimated cost $210K, described as “Interior renovations to parts of existing apartment #18A. Work to include non-structural demolition, general construction and related finishes, as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed May 5, 2023, estimated cost $57K, described as “General construction to include minor interior demolition and interior renovation to an existing commercial space located on the 7th fl, suite 703”
27 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $37,710,901
- 2026–27 tax
- $3,807,889
- Market value (city estimate)
- $83,801,993
- Taxable value
- $35,013,863
- Assessed land
- $8,901,001
- Assessed improvements
- $28,809,900
- Condo units with their own tax lots
- 91
Tax breaks
- Co-op and condo abatement, with no end date, a $358,804 credit this tax year.
Zoning
C5-3 (part of the lot is C6-3A): floor area ratio 15.86 built, above the 15.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Aug 5, 2026: $1,525,000, Apt 11E
- Jul 2, 2026: $5,400,000, Apt 16D
- Jun 22, 2026: $1,230,000, Apt 12C
- Jun 2, 2026: $3,900,000, Apt 10F
- Mar 20, 2026: $3,300,000, Apt 9A
- Jan 27, 2026: $3,530,000, Apt 18C
- Nov 24, 2025: $4,300,000, Apt 19B
- Aug 26, 2025: $5,150,000, Apt 24CT
- Jun 3, 2025: $3,200,000, Apt 24BT
- Dec 13, 2024: $1,230,000, Apt 13C
The 10 most recent of 44 open-market sales since 2016, from the Department of Finance’s sales files.