30 Warren Street, Manhattan
Condominium · 23 units · built 2017 · Block 135, Lot 7510.
Building permits
- Alteration, filed Nov 9, 2026, estimated cost $8K, described as “Construct new toilet room as per submitted plans. No change to use, egress or occupancy.”
- Alteration, filed May 26, 2026, estimated cost $42K, described as “New mechanical units installed at existing first floor roof for future tenant fit-out offirst floor retail space. No cahnge to use, occupancy or egress.”
- Alteration, filed May 4, 2026, estimated cost $11K, described as “Swthz--structural modifications in conjunction with spa build out.”
- Alteration, filed Apr 20, 2026, estimated cost $170K, described as “Swthz--mechanical modifications and installations for therapy spa build out.”
- Alteration, filed Apr 20, 2026, estimated cost $15K, described as “Sweathouzz-- modification to existing sprinkler system in conjunction with spa build-out.”
- Alteration, filed Apr 20, 2026, estimated cost $142K, described as “Swthz-- plumbing modifications and installations in conjunction with spa build out.”
- Alteration, filed Apr 7, 2026, estimated cost $516K, described as “Sweathouz-- general construction inclusive of interior partitions modifications/installations for spa build-out as per plans filed.”
- Alteration, filed Mar 31, 2026, estimated cost $20K, described as “Swthz-- change of use/occupancy from retail to business for contrast therapy spa. Minor partitions modifications.”
- Alteration, filed Mar 25, 2026, estimated cost $85K, described as “Divide existing commercial retail space into 3 spaces; installation of demising partitions, new toilet rooms, alterations to storefront.”
- Alteration, filed Feb 13, 2026, estimated cost $14K, described as “Removal of non-loadbearing interior partitions and finishes. No change to use, egress, or occupancy.”
- Alteration, filed Jan 30, 2026, described as “FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Starrett Merchant”
- Alteration, filed Jan 28, 2025, estimated cost $53K, described as “Non-structural demolition on first floor of existing building. No cange inuse, egress or occupancy”
- Alteration, filed Oct 23, 2024, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 30, 2020, estimated cost $6K, described as “Installation of decorative gas fire-pit & gas piping on PH-1. As per plans filedherewith. no change to use occuapancy or egress”
- Alteration, filed Oct 2, 2020, estimated cost $75K, described as “Mechanical modification as per plans. No change in use egress or occupancy,”
- Alteration, filed Oct 1, 2020, estimated cost $50K, described as “Plumbing modifications as per plans. No change in use egress or occupancy.”
- Alteration, filed Oct 1, 2020, estimated cost $25K, described as “Mechanical modifications(spectrum) as indicated onplans. Nochange in use, egress or occupancy.”
- Alteration, filed Oct 1, 2020, estimated cost $10K, described as “Plumbing modifications (Spectrum) as per plans. No change in use egress or occupancy.”
- Alteration, filed Sep 9, 2020, estimated cost $15K, described as “Modification and installation of new sprinkler system. No change to use, egress, or occupancy”
- Alteration, filed Aug 3, 2020, estimated cost $5K, described as “Installation of sidewalk shed as per drawings during general construction work. No change in use, egress, or occupancy. Sidewalk shed to comply with chapter 33 of the NYC building code of 2014.”
- Alteration, filed Mar 23, 2020, described as “Pipe scaffold proposed installation of pipe scaffold as per plan. No change in use,egress or occupancy.”
- Alteration, filed Mar 23, 2020, described as “Plywood fence proposed installation of plywood fence as per plan. No change in use, egress or occupancy.”
- Alteration, filed Jan 13, 2020, estimated cost $25K, described as “Installation of scaffold as per drawings. Scaffold shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed May 21, 2018, estimated cost $112K, described as “Installation of scaffold as per drawings. Scaffold shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
Property taxes
- Assessment
- $11,582,317
- 2026–27 tax
- $1,297,716
- Market value (city estimate)
- $25,738,477
- Taxable value
- $10,774,911
- Assessed land
- $2,030,854
- Assessed improvements
- $9,551,463
- Condo units with their own tax lots
- 26
Zoning
C6-3A: floor area ratio 7.53 built, above the 7.52 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Jul 15, 2026: $2,575,000, Apt 3B
- Jun 16, 2026: $2,800,000, Unit RETAIL A, sold with other lots
- May 18, 2026: $2,322,000, Apt 3A
- Feb 3, 2026: $3,760,000, Unit RETAIL C
- Mar 19, 2025: $3,500,000, Apt 6C
- Jan 17, 2025: $2,950,000, Apt 4C
- Dec 3, 2024: $4,050,000, Apt 8A
- Apr 3, 2024: $2,900,000, Apt 7A
- Mar 12, 2024: $6,575,000, Apt PH1
- Mar 15, 2023: $3,100,000, Apt 5A
The 10 most recent of 29 open-market sales since 2016, from the Department of Finance’s sales files.