# 146 Chambers Street, Manhattan

Condominium · 5 units · built c. 1915 · Block 137, Lot 7504.

On Umarelli: https://umarelli.org/nyc/1001377504/146-chambers-street

More construction in Tribeca: https://umarelli.org/nyc/manhattan/tribeca.md

Every lot on block 137: https://umarelli.org/nyc/manhattan/137.md

## Building permits

- Alteration, filed Oct 30, 2025, estimated cost $400, described as “Install exterior illuminated double sided blade sign (jay's pizza)”
- Alteration, filed Dec 12, 2023, estimated cost $27K, described as “Mechanical work in conjunction with interior renovations for 1ST floor (deli store) filed separately. Connect new commercial hood duct to existing exhaust duct up to the roof. Install new refrigeration compressors.”
- Alteration, filed Nov 15, 2023, estimated cost $55K, described as “Interior cleanup of damaged gypsum board, remove flooring finish and non-bearing portion walls. Existing commercial hoods to be removed. In preparation for full buildout renovations filed under”
- Alteration, filed Nov 8, 2023, estimated cost $127K, described as “Interior renovation in 1ST floor (deli store). New commercial hood . Install new gas cooking equipment. Connect new hood duct to existing exhaust duct up to the roof. No change to store front. Plumbing filed subsequently.”
- Alteration, filed Nov 8, 2019, estimated cost $20K, described as “Modifications to existing plumbing fixtures in the Sub-Cellar FL. No change of use, egress or occupancy.”
- Alteration, filed Nov 5, 2019, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the NYC building code.live load 300PSF.”
- Alteration, filed Nov 2, 2019, estimated cost $1K, described as “Installation of temporary (40'-76')' high pipe scaffold originating (off shed & 6TH floor roof)for remedial repair work as per plan. No change in use egress or occupancy,pipe scaffold shall comply with CHAPTER#33 of 2014 the ny building…”
- Alteration, filed Aug 2, 2019, estimated cost $1K, described as “Installation of pipe scaffolding. No change in use, egress or occupancy.”
- Alteration, filed Oct 24, 2018, described as “Installation of heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.”

## Property taxes

- Assessment: $2,450,701
- 2026–27 tax: $119,805
- Market value (city estimate): $5,446,000
- Taxable value: $1,064,571
- Assessed land: $295,201
- Assessed improvements: $2,155,500
- Condo units with their own tax lots: 6

## Tax breaks

- Co-op and condo abatement, with no end date, a $12,617 credit this tax year.

## Zoning

C6-3A: floor area ratio 4.46 built, 7.52 allowed by base zoning.

## Recent sales

- Jan 16, 2026: $2,450,000, Apt 3
- Apr 19, 2022: $3,450,000, Apt 6
- Dec 27, 2017: $2,150,000, Apt 5
- Dec 27, 2017: $2,775,000, Apt 5

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- 146 CHAMBERS ST IN TRIBECA DIST (City Planning P1983M0917): Completed, decided Nov 30, 1986. CERT OF GRANDFATHERING DETERMINE (ZR111-201) THAT UNIT WAS\*VACANT AS OF3/10/76

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
