# 139 Chambers Street, Manhattan

Co-op · 10 units · built c. 1915 · Block 140, Lot 1.

On Umarelli: https://umarelli.org/nyc/1001400001/139-chambers-street

More construction in Tribeca: https://umarelli.org/nyc/manhattan/tribeca.md

Every lot on block 140: https://umarelli.org/nyc/manhattan/140.md

## Building permits

- Alteration, filed Mar 7, 2024, described as “Installation of suspended scaffold during facade inspection/ repair. SR23/2742”
- Alteration, filed Jan 25, 2024, estimated cost $25K, described as “Filing herewith modification of HVAC system as indicated on the drawings. No change in use,egress or occupancy.”
- Alteration, filed Jan 25, 2024, estimated cost $20K, described as “Filing herewith modification of plumbing work as indicated on the drawings. No change in use egress or occupancy.”
- Alteration, filed Jan 24, 2024, estimated cost $20K, described as “Modification of exisiting psrinkler system as indicated on the drawings. No change in use egrss or occupancy.”
- Alteration, filed Dec 5, 2023, estimated cost $40K, described as “Filing herewith interior renovations on the fifth floor apt #5 includes, doors, partitions fixtures and finishes as indicated on the drawings. No change in use egress or occupancy.”
- Alteration, filed Nov 21, 2023, estimated cost $133K, described as “Remove/replace water damaged interior non-load bearing partitions, flooring, and ceilings at Residential Unit 3D as indicated on plans. Plumbing fixtures replacement on existing rough-in to be filed under LAA. No change to occupancy,…”
- Alteration, filed Nov 15, 2023, estimated cost $1K, described as “Proposed installation of temporary light duty pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Nov 10, 2023, estimated cost $1.4M, described as “Miscellaneous facade restoration and structural modifications as per plans. No change in use, egress or occupancy.”
- Alteration, filed Feb 14, 2023, estimated cost $1K, described as “Emergency installation of temp. Heavy duty shed to protect public because of unsafe building conditions as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live…”
- Alteration, filed Mar 4, 2022, estimated cost $3K, described as “Installation of an illuminated accessory business wall sign : medrite urgent care”
- Alteration, filed Mar 4, 2022, estimated cost $3K, described as “Installation of an illuminated accessory business wall sign wording : medrite urgent care”
- Alteration, filed Mar 4, 2022, estimated cost $2K, described as “Installation of an illuminated accessory business wall sign wording : medrite urgent care”
- Alteration, filed Dec 1, 2021, estimated cost $24K, described as “PL & SP filed in conjunction with GC job number M00593658-I1.”
- Alteration, filed Nov 29, 2021, estimated cost $15K, described as “Mechanical filed in conjunction with GC Job #M00593658.”
- Alteration, filed Oct 13, 2021, estimated cost $134K, described as “Application filed for general construction including interior renovation & partitions.”

## Property taxes

- Assessment: $3,809,700
- 2026–27 tax: $359,439
- Market value (city estimate): $8,466,000
- Taxable value: $3,359,393
- Assessed land: $675,000
- Assessed improvements: $3,134,700

## Tax breaks

- Co-op and condo abatement, with no end date, a $58,436 credit this tax year.

## Zoning

C6-3A: floor area ratio 10.70 built, above the 7.52 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Sep 19, 2025: $4,750,000
- Nov 29, 2023: $2,825,000
- Apr 14, 2022: $3,275,000
- Jun 30, 2021: $4,400,000
- Jun 29, 2021: $3,450,000

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
